CERN’s MidTermPlan and the consequences for HIE-ISOLDE

Slides:



Advertisements
Similar presentations
CATHI Marie Curie Initial Training Network Cryogenics, Accelerators and Targets at HIE-ISOLDE Yacine Kadi (EN) Kick-off Meeting, 23 May 2011.
Advertisements

“Towards a Portuguese Participation in the European Spallation Source (ESS) Project” On-the-Job Training at CERN Filipa Baptista Coelho, Agência de Inovação.
SCIENTIFIC ACTIVITIES AND BUDGET ESTIMATES FOR 2007 AND PROVISIONAL PROJECTIONS FOR THE YEARS AND LONG-TERM PERSPECTIVES White Paper Robert Aymar.
The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
HIE-ISOLDE Project: Status Report EXTRA COSTS AND ADDITIONAL RESOURCES CERN, 29 January 2013 Yacine Kadi.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
HIE-ISOLDE contribution packages M. Pasini BE/RF.
Final Review Meeting, September * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.
Mid Term Review Meeting, 26 September 2012P. FARANTATOS1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
TALENT Status and Future 16/07/14H.Pernegger, M.Capeans1.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
SM18 INFRASTRUCTURE Crab Cavity CryoModule – Conceptual Design Meeting
CATHI Project Administration Seamus Hegarty Human Resources Department Marie Curie Actions administrator CATHI General Meeting CERN 14 November 2011.
HIE-ISOLDE Project Status Report
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Mid Term Review Meeting, 26 September 2012N. SURNAME1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
HIE-ISOLDE Project Y. Kadi (EN-STI) On behalf of the HIE-ISOLDE Coordination team.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source Project: Update T. E. Mason Oak Ridge National Laboratory.
Mid Term Review Meeting, 26 September 2012J. MONTAÑO1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
WP2 status Gijs de Rijk This project has received funding from the European Community's Seventh Framework Programme (FP7/ )
Mid Term Review Meeting, 26 September 2012M.AUGUSTIN1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Plans and schedule for the Long Shutdown LS1 SGUI CERN, 2 February 2012 Hie-Isolde Erwin Siesling.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Status of the Design Study Richard Catherall EN-STI-RBS.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
TE-CRG Activities D. Delikaris, TE-CRG.
Mid Term Review Meeting, 26 September * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.
Mid Term Review Meeting, 26 September 2012A. Shornikov 1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Slide 1 of 10Matthew Fraser – CI MEW Meeting, 25 th October 2010.
Mid Term Review Meeting, 26 September * This research project has been supported by a Marie Curie Early Initial Training Network Fellowship of the.
Scope of CERN SC RF Activities Status Report for A&T Sector Meeting 18 Nov’13 BE, TE, EN Departments Summarized by José Miguel JIMENEZ 1 BE-RF (E. Jensen*,
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
Status and Perspectives of the SPL R&D R. Garoby – 6/12/2012 SPL Seminar 2012 December 6-7, 2012 CERN.
HIE-ISOLDE Status Report Yacine Kadi on behalf of HIE-ISOLDE project team ISOLDE Annual Workshop, 5 December 2011.
A. Perin, TE/CRG, Page 2 CERN-GSI FAIR Project integration/coordination meeting 5 14 th October 2015 A. Perin, H. Derking, L. Stewart, M. Chesi,
Lucio Rossi for the LARP Internal Project Review Via videlink, June 10, 2013.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Status and Future Perspective of the HIE-ISOLDE Project CERN, November 19-20, 2012
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
WP1: Superconducting Cavity Developments and Tests Walter Venturini Delsolaro Mid Term Review Meeting, 26 September 2012 CATHI Marie Curie Initial Training.
HIE-ISOLDE Status Report
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
HIE-ISOLDE Project Status Report
HIE-ISOLDE Project: Planning & Resources
Report on HIE-ISOLDE Status & International Advisory Panel Meeting
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
DS Collimators TE-MSC-CI
HIE-LINAC status report
HIE-ISOLDE Project: Status Report
Report on HIE-ISOLDE Status
Present and Future test facilities for High-intensity Targetry CERN
HIE-ISOLDE contribution packages
Tasks, Responsibilities Expectations and Needs
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
SNS-PPU upgrades the existing accelerator structure
East Hall under construction
Presentation transcript:

CERN’s MidTermPlan and the consequences for HIE-ISOLDE Yacine Kadi on behalf of the HIE-ISOLDE project team ISCC, 4 November 2010

Outline Project Status M&P Budgets New Planning Summary November 4, 2010 | ISCC | Yacine Kadi | 2

Project Status New website in place http://hie-isolde.web.cern.ch Project included in MTP 2010 – Approved by Council -> Sep. 2010 Planning shift Revised budget/resources CATHI being signed Start Nov.1 2010 Fellows by Jan. 2011 Submission of Spanish Grant proposal 3 projects within “Industry for Science” => 350 k€, 6FTE MiCINN project => 998 k€, 1FTE New Cavity RF tests taking place @ SM18 2nd prototype cavity (slightly modified) in fabrication New layout of the facility November 4, 2010 | ISCC | Yacine Kadi | 3

Material Budget Total remaining material budget of 35.3 MCHF shared between(2010 – 2016): External funding LINAC (17.7 MCHF) CERN budget Infrastructure (14.7 MCHF) Design studies for intensity upgrade (2.1 MCHF) Safety (0.8 MCHF) November 4, 2010 | ISCC | Yacine Kadi | 4

Material Budget November 4, 2010 | ISCC | Yacine Kadi | 5

Personnel budget CERN Staff Resources defined by group leaders (105 FTE over 5 years) Fellows (70 FTE) 5 FTE paid on departmental budget 9 FTE paid by Isolde Collaboration 56 FTE paid by ITN3 Marie Curie Contract (20 fellows) November 4, 2010 | ISCC | Yacine Kadi | 6

Fellows paid on T131910 Mathew FRASER (PhD, BE/RF) : 3917 CHF/month (100%) -> beam  dynamics Francesca ZOCCA (fellow, BE/BI): 2000 CHF/month on top of  Spanish salary (100%)-> beam instrumentation Mathieu THERASSE (fellow, BE/RF): 9000 CHF/month (50% in 2010) - SC cavity RF Yuriy ROMANETS (UPAS from ITN Lisbon, EN/STI): 4128 CHF/month  (100%) -> radioprotection (from July) Yann LECLERQ (fellow, TE/MSC): 9000 CHF/month from August 2010  (100%) -> cryomodule design November 4, 2010 | ISCC | Yacine Kadi | 7

CATHI Open Positions ESR2: Cavity and Cryomodule tests ESR4: New Magnet ESR5: Development and participation to the integration studies ESR6: Development and participation to the control, alignment and positioning metrology ESR8: Target material studies ESR13:Cooling and Ventilation Design Study ESR14:Design study of the vacuum system for the Front End of the Isolde facility ER3: Design study of a replacement charge breeder for REXEBIS November 4, 2010 | ISCC | Yacine Kadi | 8

HIE-ISOLDE Schedule PSB SHUTDOWN Physics @ 5.5 A MeV November 4, 2010 | ISCC | Yacine Kadi | 9

Summary SC Cavity prototype cold tests @ SM18 New SC cavity with modified design for sputtering tests Cryostat design well underway Radiation protection calculations ongoing Tendering —> Civil Engineering (Mar. 2011 FC) Cryogenics (Mar. 2011 FC) November 4, 2010 | ISCC | Yacine Kadi | 10