TH 13/101 Design-Build Project S.P October 30, 2009 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
Advertisements

DISTRICT 7 CONSTRUCTION PROGRAM Frederick Carroll Howard.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Public Works Greg Chock Operations Manager Harlan Hanson Road & Bridge Engineer
Genesee Road and more Genesee County Road Commission January 29, 2009.
Georgia DOT Local Maintenance Improvement Grant Program Todd Long, P.E., Deputy Commissioner.
DISTRICT 7 CONSTRUCTION PROGRAM Frederick Carroll Howard.
Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5 The Slow Uphill Climb Matt Bullock, P.E. Chief District Engineer.
Town of Westerly Pavement Improvement Plan  Determine current pavement condition.  Identify and prioritize needed repairs.  Coordinate with RIDOT.
Construction Industry Advancement Program John T. Withers, P.E.,P.P. Supervising Engineer, Highways/Buildings - Design New Jersey Turnpike Authority Working.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.
November 14, 2014 District Construction Season.
Welcome.
DISTRICT 1 November 2014 DONNIE DREWER DISTRICT ENGINEER.
Presented to: 32 nd Annual Airport Conference – Hershey, PA By: Jeff Gagnon, P.E. Manager AJP-6312 Date: March 4, 2009 Federal Aviation Administration.
Automated Traffic Safety Cameras in Work Zones Paula J. Hammond, P.E. Secretary Jeff Carpenter State Construction Engineer AASHTO Construction August 19,
Maryland Transportation Authority (MDTA)
Bridge Engineering Section Bridge Rehabilitation.
November 20, 2013 District Construction Season.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Current Construction Projects Major Projects Pinellas County.
DISTRICT D and E PRESENTATION Wednesday, April 13, 2011 Hollenback Fire Station.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
Silver Line Phase 1 – Status Report Status Overall Phase 1 Construction – 99% complete All Station at 98% complete except Wiehle – Reston East at 99% complete.
John Krebs=ptf Citizen of GA HealthSouth=dft 1 Citizen of AL Chris Walthall=dft 2 =foreman Citizen of AL Circuit Court of Jefferson County, AL 1. ADA 2.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
DBIA MID-ATLANTIC MEETING October 16, 2015 Shailendra Patel, PE, DBIA Director, Alternate Project Delivery Office.
District Five Upcoming Projects. Structures Estimated Value AA MD 648AA Over Cattail Creek500K – 1M CA MD 261 Over Fishing Creek 15M – 30M.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Asphalt Pavement Association of Indiana Annual Winter Conference Michael B. Cline Commissioner, INDOT December 14, 2010.
CENTRAL FLORIDA EXPRESSWAY AUTHORITY FY Five Year Work Plan December 10, 2015 Presented by: Jeanette Maldonado-Ambler, PE Atkins.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Public Works Department Capital Works Presentation Manitoba Heavy Construction Association.
The Wisconsin Department of Transportation 2016 WisDOT SE Region Utility Conference Local Program Projects DAAR Engineering, Inc. SE Region Local Program.
Construction & Professional Services with Indianapolis Dept. of Public Works 7 th Annual Division of Supplier Diversity Business Conference - September.
RebuildIndy Indianapolis Department of Public Works March 2011.
2009 CUMULATIVE BRIDGE PROGRAM Monroe County Highway Department April 14, 2009.
Eastham Water System Board of Selectmen Meeting April 25, 2016.
Stormwater Management
Pensacola Bay Bridge Replacement Design Build
Transportation Services Department
Chapin Town Hall Meeting
The Alabama Transportation Rehabilitation and Improvement Program
Infrastructure Investment Needs
STREETS & STORMWATER DEPARTMENT
Dave Kuhn Assistant Commissioner
Kerr Tar Project Update – June 2016
IA 122 RECONSTRUCTION PRE-BID MEETING
2013 Specification Implementation
DISTRICT 1 ADVERTISED PROJECTS
Transportation Projects
Highway 169 Bridge Replacement & Pavement Resurfacing
North Main Street Intersection Improvements at Route 460 Bypass
Mr. Greg Slater, Administrator
SW Gage Blvd - Street Repair Project
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Welcome.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Pavement Performance Measures In Georgia
Galt Court Water Main Replacement
Pavement Improvement Plan 2009
2013 Specification Implementation
District Five Upcoming Projects
Louis E. Feagans, P.E. Statewide Technical Services Director, INDOT
Design and Engineering Services
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

District 6 2017 Construction Season November 29, 2016

District 6 Construction Anthony F. K. Crawford District Engineer Stephen A. Bucy Assistant District Engineer Devin Miller Area Engineer John Ruff Office Engineer Lisa A. Piper Administrative Assistant III JP Barton Constructability Reviewer

District 6 Construction Jeff Foreman Brian Boyer Derick Winfield Tom Fulton Raymond “Butch” Foreman Dave Bittner Elwood “Woody” Carpenter Steve Wiley John Veronick Travis Yates Many Consultant PEs

Interchange Construction GA6465270 US 219 – From I-68 north towards PA Note: Design Build Contract. Cost Code: J-K $50,000,001 to $100,000,000 Ad (Request for Qualifications) Date: 4/4/17 Bid Opening: 10/3/17 (Longer time than usual due to DB) Est. NTP: 12/11/17

Safety & Resurface AX8245177 I-68 – WB Climbing Lane at AL / GA County Line Note: “Whitetopping” project. Cost Code: C $500,001 to $1,000,000 Ad Date: 11/22/16 Bid Opening: 1/5/17 Est. NTP: 3/6/17

Safety & Resurface GA4145177 MD 495 – From MD 135 to Crabtree Creek Note: Plan to use Cold In-Place Recycling for base. Cost Code: E $2,500,001 to 5,000,000 Ad Date: Fall 2017 Bid Opening: Late 2017 Est. NTP: Spring 2018

Safety & Resurface WA4465177 I-70 – From Tonoloway Creek Bridge to .75 Mi E. of MD 615 Cost Code: E $2,500,001 to 5,000,000 Ad Date: 3/14/17 Bid Opening: 4/20/17 Est. NTP: 6/26/17

Safety & Resurface WA8705177 I-70 – From Ashton Rd to .30 Mi W. of Conococheague Creek Cost Code: E $2,500,001 to 5,000,000 Ad Date: 2/28/17 Bid Opening: 4/6/17 Est. NTP: 6/12/17

Safety & Resurface WA4475177 MD 68 – From Bottom Rd to Williamsport Cost Code: C $500,001 to $1,000,000 Ad Date: Spring 2017 Bid Opening: Summer 2017 Est. NTP: Fall 2017

Safety & Resurface XY5015177 Various Locations in Allegany County Cost Code: E $2,500,001 to 5,000,000 Ad Date: Early 2017 Bid Opening: Spring 2017 Est. NTP: Summer 2017

Safety & Resurface XY5115177 Various Locations in Garrett County Cost Code: E $2,500,001 to 5,000,000 Ad Date: Early 2017 Bid Opening: Spring 2017 Est. NTP: Summer 2017

Sidewalks XY1755177 Garrett County ADA Improvements Cost Code: B $100,001 to $500,000 Ad Date: Late 2017 Bid Opening: Spring 2018 Est. NTP: Spring 2018

Bridge AL2975180 MD 36 (Br No. 0100800) over Jennings Run in Mt. Savage Bridge Replacement Cost Code: E $2,500,001 to $5,000,000 Ad Date: 10/31/17 Bid Opening: 12/7/17 Est. NTP: 2/12/18

Bridge GA2305180 US 50 (Br No. 11039X0) over Branch of Youghiogheny River Cost Code: D $1,000,000 to $2,500,000 Ad Date: 12/13/16 Bid Opening: 1/19/17 Est. NTP: 3/27/17

Bridge WA2095180 MD 63 (Str No. 21047X0) over St. James Run Small Structure Replacement Cost Code: D $1,000,000 to $2,500,000 Ad Date: 12/20/16 Bid Opening: 1/26/17 Est. NTP: 4/3/17

Bridge WA2165180 I-70 WB (Br No. 2107304 & 2114204) over I-81 Bridge Rehabilitation Cost Code: F $5,000,001 to $10,000,000 Ad Date: 12/13/16 Bid Opening: 1/19/17 Est. NTP: 3/27/17

Community Safety & Enhancement WA1065184 Keedysville Cost Code: F $5,000,001 to $10,000,000 Ad Date: 11/7/17 Bid Opening: 12/14/17 Est. NTP: 2/19/18

Geometric Improvements AL2665130 MD 935 at Railroad St Cost Code: B $100,001 to $500,000 Ad Date: 11/15/16 Bid Opening: 1/5/17 Est. NTP: 2/27/17

Drainage WA2805174 MD 64 at Chewsville Cost Code: C Ad Date: 5/9/17 $500,001 to $1,000,000 Ad Date: 5/9/17 Bid Opening: 6/15/17 Est. NTP: 8/21/17

TMDL AX7665582 Various Locations in Washington County – Group 1 Cost Code: D $1,000,001 to $2,500,000 Ad Date: 8/9/16 Bid Opening: 12/8/16 Est. NTP: 2/13/17

TMDL WA2655382 Various Locations in Washington County – Group 1A Cost Code: F $5,000,001 to $10,000,000 Ad Date: 12/20/16 Bid Opening: 1/26/17 Est. NTP: 4/3/17

TMDL WA2655482 Various Locations in Washington County – Group 1B Cost Code: F $5,000,001 to $10,000,000 Ad Date: 1/10/17 Bid Opening: 2/16/17 Est. NTP: 4/24/17

Facility Work AX4015629 Mill, Patch, & Resurface Asphalt Pavements Various Locations (Shop/Salt Dome Areas) Cost Code: B $100,001 to $500,000 Ad Date: 11/7/16 Bid Opening: 12/15/16 Est. NTP: 2/20/17

Facility Work GA1585129 Swanton Salt Storage Facility Replacement Cost Code: B $100,001 to $500,000 Ad Date: Late 2016 Bid Opening: Early 2017 Est. NTP: Spring 2017

Facility Work WA0905129 Boonsboro Salt Storage Facility Replacement Cost Code: B $100,001 to $500,000 Ad Date: Late 2016 Bid Opening: Early 2017 Est. NTP: Spring 2017