Edgerton Contractors Oak Creek, WI August, 2012. 10 years experience with GPS Staking / Machine Guidance Machines: 28 Trimble, 1 TopCon – Backhoes, Dozers.

Slides:



Advertisements
Similar presentations
Geometric Networks in ArcGIS
Advertisements

The Lone Star College System 13 Locations spread across 1,400 square miles 5 Colleges 2 University Centers 5 Centers System Office & Training Center 4,800.
Presented by: Mike Sisson February 23, It is the Law The Americans with Disabilities Act of It is the Right Thing to do Provide Equal Access.
Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010.
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Building Information Management (BIM)
Bentley PowerCivil.
Project Planning: Assembling a Mortenson “Integrated Work Plan”
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
© © QA Software Pty Ltd All rights reserved 1 Project Information Management Tools Inspection and Defects Management System for Projects By QA Software.
Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010.
“The Honeywell Web-based Corrective Action Solution”
COMPANY PORTFOLIIO MCLENDON ENTERPRISES FOOTPRINT IN GA.
Construction Surveys
© Paradigm Publishing Inc Chapter 10 Information Systems.
GRADE CONTROL SYSTEM Trimble TV GPS Machine Control Done by MCS
Trimble SCS900 Site Controller Software
Surveying Chain Surveying
17 AND 18 AUGUST, 2010 EUGENE, OREGON RON SINGH CHIEF OF SURVEYS /GEOMETRONICS MANAGER OREGON DEPARTMENT OF TRANSPORTATION Design to Dozer.
© 2010 Bentley Systems, Incorporated Ron Gant, P.E., Bentley Systems, Inc. Virtual Design & Construction: 3D Information Modeling.
Site and Highway Staking with Trimble SCS900
Contractor Safety Management
1 Automated Machine Guidance: Electronic Files and Design Data AASHTO Subcommittee on Construction Meeting August 18, 2010 – Burlington, VT Mark Taylor.
Layout a Project. OVERVIEW Familiarize you with techniques and procedures in staking / laying out a project using an Trimble S6 and R8 GPS – Controlled.
Trimble  Quantm  Haul Road Optimization Presenters Name.
Working with 3D Models in Design & Construction Panel Discussion 1.
Setup “Do’s & Don’ts Presented By:
SCC & Leica  Import total station survey, GPS, traverse, levelling and GIS data direct from all Leica instruments.  In built Grid Inquest for GPS reduction.
TRYPHINE DUDZAYI.  Surveying instrumentation has undergone a major transformation over the past years transit to the modern instruments.  The theodolite,
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
Release & Deployment ITIL Version 3
GPS & Total Station Basics
Grade Control Systems and Applications. Topics  Benefits of using Grade Control technology for earthmoving projects  Grade Control Systems and applications.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Seventh Edition By David A. Madsen, Terence M. Shumaker, and David P. Madsen Civil Drafting Technology Chapter 6 Surveying Fundamentals.
Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Roadway Conference 13 April, 2010.
Software Inspection A basic tool for defect removal A basic tool for defect removal Urgent need for QA and removal can be supported by inspection Urgent.
Chapter 13: Developing and Implementing Effective Accounting Information Systems
Planning for Earthwork Construction
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009 AFB80 Session 404 January 12, 2009 Contractor Best Practices Transportation Research Board.
Connected Community Overview Connecting the Office and the Field.
1 Bringing Machine Control to California DOT (Caltrans) Construction Projects Kevin Akin, LS Office of Land Surveys.
SITECH (WA) PTY LTD Site Positioning Systems Supervisor System Sub Station Demo Guide.
Service Level Agreements Service Level Statements NO YES The process of negotiating and defining the levels of user service (service levels) required.
Presented by: Chuck Lawson, PE Roadway Designer and Machine Control – What You Need to Know.
Technical Specifications for Monitoring Ground Displacements at a National Highway Project K. Lakakis, P. Savvaidis and I. Ifadis Laboratory of Geodesy.
Contractor Alternate Design Serving the Public’s Best Interest.
Resident Engineer/Survey Collaboration Maximize the Value of Both Services.
Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.
7 Strategies for Extracting, Transforming, and Loading.
Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 Implementing a Model Based Approach to Design at Wisconsin.
SunGuide SM Software Development Project End of the Year ITS Working Group Meeting December 7, 2005.
Trimble GCS900 Grade Control System. Definition: Construction The act or result of – Conceptualizing (we need a airstrip) – Interpreting and planning.
PCS900 AccuGrade 3D Paving Training 3D Design Models & SVO/AGO & TBC
I © 2015 Bentley Systems, Incorporated Andrew Smith, Feb 2016 How BIM can positively influence rail O&M.
How are Highway Designs Actually Represented in Surface Models for Automated Machine Guidance and How Should We Control Them? Alan Vonderohe Construction.
Civil Engineering Surveying Roy Frank. Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’
Maintenance and Temporary Traffic Control
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Chapter 1 Introduction to AutoCAD Civil 3D 2009 Learning Objectives: Understand basic features of AutoCAD Civil 3D Start AutoCAD Civil 3D Understand.
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
ERP = Enterprise Resource Planning
Temporary Works Co-ordination
Model-Centric Design Danny L. Kahler, P.E. Session T31
BIM - Building Information Modeling A well-structured BIM is a key to achieve success in the Building Design and Construction process. Qatar Green Leaders.
DBIA Manual of Practice
Construction Considerations
Presentation transcript:

Edgerton Contractors Oak Creek, WI August, 2012

10 years experience with GPS Staking / Machine Guidance Machines: 28 Trimble, 1 TopCon – Backhoes, Dozers and a Grader Rovers: 8 Trimble, 1 TopCon TerraModel, Trimble Business Center, Civil 3D VRS Corrections and remote data transfer for all rovers

GPS represents 15% to 25% of the cost of new machines GPS machines require more frequent maintenance: pins, bushings, cutting edges Three full-time personnel: Program Manager, Survey Manager, Engineering Manager GPS Machine Guidance Training – creation and distribution of YouTube style videos via the internet GPS Rover Training - annual classroom session, one- on-one, regular assessments, 12 month process Three year hardware development cycle Continuous software and hardware beta testing for Trimble

Pre-build the project – plan check and RFIs Night Work Alignment-based design alternatives Design and Visualization of interim surfaces which provide drainage, construction access without over-excavating Match existing grades for temporary wideners or cross-overs Existing Grade to subgrade in one operation Planning tools / confidence to execute ever challenging construction sequences

RFI: ECI-042, Wall 420 Horizontal Alignment of Wall Curve Table inconsistent with coordinate callout. N 0.05-ft, E 1.82-ft

Advantages of GPS at night: Accurate grading in spite of reduced visibility Increased safety due to fewer personnel on the ground

Temporary Alignments: NSB-NWA Eliminated a traffic switch. Saved three weeks on the schedule.

Proposed SurfaceExisting Surface Interim Surface 20 th Street – Looking East Safe Slopes Excavate for proposed structures Temporary Crane Access Site Drainage Construction Staging Minimize over-excavation

Visualization during planning Means and Methods Confirm safe slopes and adequate storm water control

Match Grades for Temp Ramp WSB: Load 2D plan into GPS rover, take shots along match lines Tweak surface to match existing Differences, in this case, ranged from 0.18 to 0.29-ft

Safe Slope Sub-Grade Step Clean, straight, geometric slope with sharp breaks. One GPS Hoe, One GPS Dozer No Stakes or Grade Laborer

Staged excavation for tieback installation WN Ramp – Schedule required tunnel construction / tie back installation simultaneously with 1000 one way access thru a 4 staged excavation

Higher quality earthwork product One Pass excavation achieving higher production rates at lower unit cost Eliminated grade stakes for crews Bid Item savings against traditional bid items Data driven decisions and negotiations Increased level of confidence to accelerated schedule execution

Success on previous projects: Marquette Interchange - $800 million, multi-phase interchange project in downtown Milwaukee Wind Farm Project – Design / Build, more than 80 unique turbine sites, 40 square miles 8 Year working relationship based on a shared approach to this kind of work. The Mitchell Interchange is simply the latest application of the Edgerton / Kapur Template. Results are predictable.

The Team: Owner and contractor representatives CAD operators, surveyors, inspectors Skilled, take pride in their work, just want to build a good project Operational framework: Divide the work. Collaboration – not competition. Share everything. Trust but verify. Success in this step solves half the problems.

Surveyor Control and Calibration DOT Inspector Inspection Contractor Model Share Template for Project GPS Pre-Construction Verify

Share Everything?

Doesnt that mean that the Blind are leading the Blind?

In order of Importance… 1. One set of survey control points. 2. One GPS calibration. 3. One set of construction surfaces. 4. One GPS infrastructure.

Specification Site Calibration: Designate a set of control points including a total of at least 6 horizontal and vertical points… Contractor and surveyor share the responsibility of selecting / setting points. Contractor to set base station locations. Surveyor measures and then publishes NEZ and LLH coordinates on each point for all GPS users on the project.

Include base station points in the list of control points. Digital level loops, robotic total station traverses are the minimally acceptable approach. Consider establishing GPS staking and machine guidance control in the project design phase.

Goal: Provide the generic information that can be used by anyone using any GPS system to stake or grade the site consistent with the surveyor-of-record. Definition: Published list of the NEZ coordinates and LLH coordinates for each control point. All users of the data must verify internal consistency of the data before using for construction.

Every control point should be checked. Results of the check should be shared with the surveyor-of-record.

Definition: Electronic representation of the contract document that can be loaded into survey and machine guidance instruments. Contractor is responsible for the creation and distribution of Construction Surfaces. All users check that the surfaces match the contract document before using in the field. Any and all errors are fixed by the Contractor prior to construction.

Construction surface should incorporate every line and label in the contract document. List of construction surfaces: Finish Grade – required. SubGrade – required. Interim grading surfaces. Bridge / retaining wall excavation. Storm sewer excavation. Stone or other material surfaces.

SOE reports are not models. Edgerton SurfaceSOE Report

CAD files reduce model costs significantly. Format: LandXML, Civil3D Include: Alignments – Horizontal and Vertical All lines on Plan Details Pre-Construction Topographic Survey Finish Grade Surface: breaklines, not triangles ROW limits Utilities Structure lines, example: CL of bearing for bridge abutments Coordinate call-outs for truncated arcs, vertical and horizontal

Send in an RFI on all inconsistencies. Visual checks are not adequate. Numerical checks to the 0.01-ft are required. Inspectors benefit by taking a high-profile role in checking the surface. The project gets built and inspected twice- once in the office and a second time in the field.

Contractors want this responsibility… Highest repair / downtime risks. Interim surfaces. Means and Methods. Duck-walking and landscape contours. Construction-phase design changes. Knowledge and control of operators.

Reasonable effort should be made to accommodate the hardware of all players to enable everyone to use the same source of GPS corrections. Edgerton can configure base stations to broadcast corrections to TopCon, Trimble and Leica – all from one base. Kapur has purchased survey instruments with radios compatible with machine radios. VRS simplifies the effort to standardize GPS correction sources.

Multiple sets of eyes checking single-source information. Eliminate small discrepancies due to measurement tolerances or plan interpretation. Focus everyone on what they do best. Perform as much of the process as possible pre-construction – when everything is cheap.

Edgerton Contractors, Inc. 545 W. Ryan Road Oak Creek, WI Brady Frederick Jeremy Craven