Follow the rules to save a life

Slides:



Advertisements
Similar presentations
Always start a vehicle correctly
Advertisements

Beware of hazards around you
PDO Second Alert What happened:
Always comply with Defensive driving techniques
PDO Second Alert What happened? Your learning from this incident..
Always use mechanical handling aids when carrying out a heavy lift
Always use mechanical handling aids when carrying out a heavy lift
Always use 3 points of contact when using ladders
PDO Second Alert Date: Incident : LTI What happened?
Comply with Safe Operating Procedures
PDO Second Alert Valves open Valve closed Valves open Valve open
Don’t pull a twisted sling
Never place yourself in line of fire
Drive with appropriate speed to road conditions
Identify Pinch Points and keep your Hands & Fingers away
Use right tools for the job and use them correctly
Do not work at height without fall protection
PDO Second Alert Date: Incident type: LTI What happened?
Always wear fall protection equipment when working at height
Ensure to use the right tools and equipment for the activity
Avoid taking shortcuts
Ensure a working platform is adjusted and used
Follow Management of Change for an activity which is not in permit
PDO Second Alert Date: Incident: LTI What happened?
Keep away form ‘line of fire’
Keep away from “Line of Fire”
Always use the correct tools for the job
Always use the right equipment for the task !!!!
Always follow Night driving rules
Ensure OHL Clearance required for your lifting activity
No hands on elevator while delivering pipe
Never put your Hands in line of fire
PDO Second Alert What happened? Your learning from this incident..
Ensure cat line are under tension before removing elevator bolts
PDO Second Alert Date: Incident title: Fatality What happened?
PDO Second Alert Date: Incident title: LTI What happened?
Adequate tethered tools
PDO Second Alert Always follow the PTW procedures
Safety Critical Devices can Save the Lives & Protect Asset
Pay attention to your footing
Crane operating with boom lowered and under Supervision
Always report Near Misses
Always use secondary retention
Tiredness and Speed Can Kill!
Never place yourself in “line of fire”
Always keep your hands away from crush points (Line of Fire)
Always use your hands to set the slips
Always stay away from line of fire
PDO Second Alert What happened? Your learning from this incident..
When operating the Tongs under tension, make sure all crew keep clear
PDO Second Alert Date: Incident title: HiPo What happened?
Always ensure “no go” zone are in place
Check equipment prior to start the job
PDO Second Alert What happened? Your learning from this incident..
Seek assistance of Banksman while reversing the vehicle
Always get authorization before starting any job!
PLAN AND DOCUMENT CHANGES TO THE OPERATION
Always keep your equipment maintained
PDO Second Alert What happened? Your learning from this incident..
Check Level Setup prior Lifting & Lowering Operation
Stay away from line of fire
Keep away from “Line of Fire”
Always verify isolation before starting any electrical job!
Vehicles to Keep Safe Distance at all times
Maintain communication between peers
Always position the crane boom correctly before slinging the casing
Keep away from the line of fire
Beware of raised edges of walk ways.
Keep hands out of the line of fire
Use hands-off where possible
Presentation transcript:

Follow the rules to save a life PDO Second Alert Date: 03/02/18 LTI - Electrical Flash Over What happened? An Electrician isolated the 415v panel and checked the fuses, he found they were in open circuit. The fuses were replaced, and on energising the circuit, the electrician noticed there were sparks coming from the cable connection on fuse holder. Without isolating the panel the Electrician then removed the fuses and using a non insulated 4mm Allen key he attempted to tighten the cable on the live side, during this operation the Allen key touched the lower metal shelf causing a short circuit and electrical explosion. Your learning from this incident.. Permit to work systems must be followed and checked by management Communicate effectively and do not make assumptions Good supervision must be in place Restricted areas must only be accessed by authorised persons Working on energsed electrical systems must only be done by competent persons Hand tools must be inspected on a regular basis to ensure they are safe to use TBT must be carried out and recorded Staff must intervene and stop unsafe work Staff must follow Life Saving Rules Follow the rules to save a life

Management self audit Date: 03/02/18 Incident title: Electrical Flash Over As a learning from this incident and ensure continual improvement all contract managers must review their HSE HEMP against the questions asked below Confirm the following: All access to restricted areas is controlled with PTW as per PR1172? Adequate and competent supervision in place for high risk activities, and that CEP authorized persons are readily available to comply with PDO ESR? All staff have a good awareness and comply with the PTW process? All staff understand the hazards and consequences of working on Energized Electrical Equipment? All staff are fully aware of what to do in an emergency situation and are aware of the PDO emergency numbers? Make a list of closed questions (only ‘yes’ or ‘no’ as an answer) to ask other contractors if they have the same issues based on the management or HSE-MS failings or shortfalls identified in the investigation. Pretend you have to audit other companies to see if they could have the same issues.