MuCool Test Facility Instrumentation Update

Slides:



Advertisements
Similar presentations
Electrical wiring for piezo movers piezo power supply strain gauges readout temperature probes 1 Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical.
Advertisements

MTA Instrumentation M. Haney University of Illinois at Urbana-Champaign 25 February 2004.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop S. Buda Personnel Protective Systems March 27, 2007.
Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
Development of a Linux- based small-size controller using PoE technology T. Masuda, T. Fukui, R. Tanaka SPring-8 ICALEPCS2005, Oct , Geneva, Switzerland.
LH2 Absorber Design Mary Anne Cummings MICE Safety Review LBL Dec 9, 2003.
Instrumentation: ground and noise Temperature Measurement.
MICE Safety System DE Baynham TW Bradshaw MJD Courthold Y Ivanyushenkov.
Slow controls and instrumentation of MICE 1.Physics and systematics 2.How the state of the cooling channel gets defined 3.Engineering for the signal readout.
Flammable Gas Electrical Safety Concerns for detectors: Power per channel Feedthroughs Seals.
MICE LH2 Absorber Instrumentation - What is necessary/ desirable? (physics calibration) Temperature inside the the absorber Temperature inside the absorber.
MuCool Test Facility Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 12/13 August 2002.
LH2 Absorber Design Mary Anne Cummings MICE Safety Review LBL Dec 9, 2003.
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
LH2 Absorber Design Mary Anne Cummings MICE Safety Review LBL Dec 9, 2003.
Mucool LH2 Absorber Progress and Pauses Mary Anne Cummings FNAL August 12, 2002.
Feb Absorber/coil instrumentation and controls  Subsystems Absorbers RF Magnets  Monitoring/safety  Data acquisition: Information on system.
Absorber Design Details Mary Anne Cummings MICE MEETING Columbia June 13, 2003.
The Interface Solution Experts Intrinsically Safe Design, TCM installs in: Class I, II, & III Div 1 and 2 (Zones 0/1 & 2) Up to 32 Channels.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Cooling Channel Instrumentation Update M. Haney University of Illinois at Urbana-Champaign 6 February 2004.
Linac Test Area Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 14 June 2002.
Corner Raft Test Station Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
Columbia University IN THE CITY OF NEW YORK Environmental Monitoring DOE Review June 2-3, 2009.
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
TPC/TRD DCS meeting, GSI, 27 Sep 2002Børge Svane Nielsen, NBI1 TPC laser system controls adjustable mirrors Laser Controls, Power, Cooling DCS: 1/ Laser.
15 March 2001Absorber Review Meeting at NIU1 DAQ for Pressure Test, and later... Michael J. Haney University of Illinois
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
Grounding Guidelines Developed for LBNE
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
LH2 Safety Issues for MICE 1.O2/LH2 separation 2.No Ignition sources near LH2 3.Adequate ventilation 4.Affects: Windows: absorbers and vacuum Primary and.
Series RHP Temperature and Humidity Transmitter The materials included in this compilation are for the use of Dwyer Instruments, Inc. potential.
TF Joint Operations Review Commissioning Plan C Neumeyer 2/10/05 Test Shots Instrumentation Benchmarking.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
FEB Slide 1 Task No.:Point(s):1Only one answer is correct.Cat. No. To measure electrical … A current, the ammeter must be in line with the current.
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Programmable Logic Controller & Distributed Control System Yoon-Je Choi 17 th June 2006.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
Logging and Alarms Apparatus monitored through GPIB – LakeShore temperatures – Agilent power supplies – AMI liquid level monitor Apparatus monitored through.
Electronics Plastics Film or Paper Medical (packaging) Chemical Painting.
TF Joint Testing Data Acquisition Special Test Equipment Hans Schneider with Robert Marsala (609) Engineering Operations April.
1 Sensors and Switches... WHAT’S IN THE BOX? 2 Sensors and Switches... SENSORS, CORDSETS & PROX SWITCHES.
S A Griffiths CM42 June 2015 Electrical & Control.
National Centre for Nuclear Research, Poland
P.Fedorets on behalf of the Pellet target group
Status of the pellet target at ITEP
TOF Low Voltage and High Voltage Systems Vahe Ghazikhanian UCLA Department of Physics and Astronomy V. Ghazikhanian July 21, 2005.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
Site Controller Unit and Trunk Interface Unit
ProtoDUNE SP – Slow control temperature readout setup test
Interfacing of LCD with µP
EILERSEN The Weighing experts.
MMS Mining Master Smart
Linac Test Area Instrumentation
Electrical Safety Standards
Data Acquisition (DAQ)
Linac Test Area Instrumentation
Setup for testing LHCb Inner Tracker Modules
Day 2 Training - Technical
University of Illinois (UIUC)
Ola Ingemansson Electrical & Instrumentation Engineer
University of Illinois (UIUC)
Optical fiber based sensors for low temperature and superconductors
Presentation transcript:

MuCool Test Facility Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 12/13 August 2002

Instrumentation Seeking an intrinsically safe solution for instrumenting the LH2 absorber in the MTF Prudent to accommodate MICE and European safety considerations i.e. do it right the first time… 12/13 August 2002 m. haney, et al.

Objective - Safety Intrinsic safety, if possible Limited power per channel Good idea for Fermi; required for Europe Gas-purged enclosure, if necessary 19” rack, 40U tall 12/13 August 2002 m. haney, et al.

Instrumentation (1) Lakeshore 218S TG-120PL GaAlAs diodes (8) 8 channel cryo temperature monitor +/- 21m K at 10 K 16 readings/s GPIB interface (to PC) TG-120PL GaAlAs diodes (8) -180mV/K at 4.2 K B < 5 T; rad hard 12/13 August 2002 m. haney, et al.

Instrumentation (2) FISO Fiber-optic strain and temperature BUS chassis, with 4 (up to 8) modules 1000 readings/s RS-232 interface (to PC) FOS-N strain sensors +/- 500 me; 0.01% full scale; 0.2mm O.D. FOT-L temp sensors 0.1 K resolution; 1.5mm x 32mm (10mm active) Slow: 1.5 second response… 12/13 August 2002 m. haney, et al.

Instrumentation (3) Gateway E-4000 PC PCI-MIO-16E-1 1.8 GHz, 1Gbyte RAM, 0.5Gbyte cache 120Gbyte disk, Windows 2000 15” LCD flat panel display 640x480 CCD camera, microphone PCI-MIO-16E-1 16 channel ADC, 1.25 Msample/s, 12 bits, +/-10 V Tripplite Smart UPS 3000 VA 12/13 August 2002 m. haney, et al.

Instrumentation (4) IRM 64 channel multiplexed ADC 16 bit, 100 Ksamples/s ACNET network connection All PC data will be posted to IRM for ACNET access 12/13 August 2002 m. haney, et al.

Instrumentation (5) MTL7055ac barriers MTL7060ac barriers Low level AC 24 W per line 3 V max MTL7060ac barriers Star-connected AC 101 W per line 8.5 V max 12/13 August 2002 m. haney, et al.

(basic) Barrier fuse Power + Signal “safe circuit” Return Ground 12/13 August 2002 m. haney, et al.

Signals inside (the cryostat) 8 (cryo) temperatures readout via GPIB + LabView (PC) Multiple fibers FISO strain, temperature (4) Pressure, flow? Laser occlusion (2) Simple spark detectors (2) (light pipe to photodiode) 25(ish) 4-wire bolometry strips 12/13 August 2002 m. haney, et al.

(more) Signals inside Piezo vibration sensor via (16 chan/12 bit) ADC and LabView (PC) Local (64 chan/16 bit) IRM channels via “LabView” (see last slide) MICE channels (?) placeholder for the future… 12/13 August 2002 m. haney, et al.

Signals outside USB (4 wires, and shield) for CCD camera and microphone via PC Many voltages, currents, temperatures, pressures magnets, beam position monitors, etc. Most available from ACNET or local IRM via “LabView” (see last slide) or Cyro-PLC 12/13 August 2002 m. haney, et al.

Two Possibilities (1) Intrinsically safe Hazard Safe Sealed Conduit(s) Barrier(s) ACNET IRM Cryo(temp) FISO PC w/16 chan ADC network power Intrinsically safe signal conditioners and transmitters UPS 12/13 August 2002 m. haney, et al.

Two Possibilities (2) Gas-purged box Hazard Safe Barrier(s) Sealed Conduit(s) ACNET IRM Cryo(temp) FISO PC w/16 chan ADC network power UPS 12/13 August 2002 m. haney, et al.

This Summer – Z. Conway LabView interface Integration – remains! GPIB to cryo temp monitor - works PC-internal ADC (e.g. for piezo) – “works” Simple ADC data read - works High rate collection and compression – not yet IRM communications IRM-ADC Read - works Write – any moment now… Integration – remains! 12/13 August 2002 m. haney, et al.

Open Issues Wire+Shielding Concerns Noise/sensitivity issues due to wire+barrier resistance? Approx 12 W /ft for 36 AWG manganin wire 48 W to 202 W added by barrier And diode capacitance… Common mode (surges) due to magnets? Need to protect electronics without burning barriers Cable plant into solenoid 12/13 August 2002 m. haney, et al.

Open Issues (2) Software Concerns Posting data to the IRM For ACNET access Reading data from ACNET For PC access Remote control of PC Citrix ICA, PCAnyWhere, etc. LabView web-remote instrumentation KVM? 12/13 August 2002 m. haney, et al.

Open Issues (3) FISO strain and temp sensors Not official rated below -40 C (!) Temp has been used at 35 K (custom) No experience with strain gages Company very willing to work with us To adjust signal conditioner, correction curves, etc. Will require some form of agreement Confidentiality, exclusivity for the instrument Yet freedom to use and publish measurements Also pressure, flow? 12/13 August 2002 m. haney, et al.