LDAP monitoring status

Slides:



Advertisements
Similar presentations
LNL M.Biasotto, Roma, 22 novembre Some notes on WP6 INFN Testbed.
Advertisements

GridPP Meeting, Cambridge, 14 Feb 2002 Paul Mealor, UCL Networking Paul Mealor.
GridPP Meeting, Cambridge, 15 Feb 2002 Paul Mealor, UCL UCL Testbed 1 status report Paul Mealor.
LCFG overview and future Michael George University of Liverpool
Andrew McNab - Manchester HEP - 17 September 2002 Putting Existing Farms on the Testbed Manchester DZero/Atlas and BaBar farms are available via the Testbed.
R-GMA Producers and Archiver Paul Mealor. edg-pinger-timeping edg-netmon-rgma-info Producer API edg-gridftplog2rgma Producer API Log Here be servlets.
Alessandro Italiano INFN – CNAF 26/09/2003 1/5 Status of the INFN - EDG testbeds Alessandro Italiano 7th DataGrid Conference.
A conceptual model of grid resources and services Authors: Sergio Andreozzi Massimo Sgaravatto Cristina Vistoli Presenter: Sergio Andreozzi INFN-CNAF Bologna.
Andrew McNab - Manchester HEP - 6 November Old version of website was maintained from Unix command line => needed (gsi)ssh access.
INFN Testbed status report L. Gaido WP6 meeting CERN - October 30th, 2002.
Installing a DHCP Server role on Windows Server 2008 R2 in a home network. This is intended as a guide to install the DHCP role on a Domain Controller.
(ITI310) SESSIONS : Active Directory By Eng. BASSEM ALSAID.
Downloading & Installing Software Chapter 13. Maintaining the System Yum Pirut BitTiorrent Rpm Keeping Software Up To Date Up2date Red Hat Network Wget.
The EDG Testbed Deployment Details The European DataGrid Project
The EU DataGrid – Information and Monitoring Services The European DataGrid Project Team
Andrew McNab - Manchester HEP - 5 July 2001 WP6/Testbed Status Status by partner –CNRS, Czech R., INFN, NIKHEF, NorduGrid, LIP, Russia, UK Security Integration.
Support for system administrators Feedback from site admins after Testbed1 experience 05/03/2002 4th EDG WS Paris G. Merino, IFAE.
ScotGRID:The Scottish LHC Computing Centre Summary of the ScotGRID Project Summary of the ScotGRID Project Phase2 of the ScotGRID Project Phase2 of the.
Steve Traylen Particle Physics Department EDG and LCG Status 9 th December 2003
Bob Jones – June n° 1 EDG release Schedule Bob Jones.
C. Loomis – Integration Status- October 31, n° 1 Integration Status October 31, 2001
EDG Testbed installation and configuration with LCFGng Maite Barroso - WP4
First attempt for validating/testing Testbed 1 Globus and middleware services WP6 Meeting, December 2001 Flavia Donno, Marco Serra for IT and WPs.
DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group work status for 1.2 release Andrea Formica on behalf of Test Group.
Franck Bonnassieux- WP7- n° 1 WP7 Budapest Collaboration with Dante Monitoring & R-GMA GridFTP Logging Network Cost Function MapCenter & TopoGRID Future.
Presenter Name Facility Name UK Testbed Status and EDG Testbed Two. Steve Traylen GridPP 7, Oxford.
2-Sep-02Steve Traylen, RAL WP6 Test Bed Report1 RAL and UK WP6 Test Bed Report Steve Traylen, WP6
Andrew McNab - Manchester HEP - 17 September 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –“How much of the Testbed has.
WP3 Quality Steve Fisher / RAL 25/9/2003. WP3 Steve Fisher/RAL - 4/9/2003R-GMA2 Code Problems –Unit tests are not enough –WP3 testbed is currently too.
E. Ferro, CNAF, april Enrico Ferro INFN-LNL Installation of a LCFG server.
DataTAG is a project funded by the European Union DataTAG WP4 meeting, Bologna 29/07/2003 – n o 1 GLUE Schema - Status Report DataTAG WP4 meeting Bologna,
WP7 Middleware Status and Plans Paul Mealor. Contents GridFTP monitoring Network monitoring information in RGMA UK network monitoring.
DataTAG is a project funded by the European Union CERN, 8 May 2003 – n o 1 / 29 GridICE The eyes of the grid A monitoring tool for a Grid Operation Center.
The EU DataGrid – Information and Monitoring Services The European DataGrid Project Team
NMWG GGF7 Tokyo March 2003 Paul Mealor UCL EDG WP7 Network Monitoring Schema Paul Mealor NM-WG GGF7 Presented by Richard Hughes-Jones.
15-Feb-02Steve Traylen, RAL WP6 Test Bed Report1 RAL/UK WP6 Test Bed Report Steve Traylen, WP6 PPGRID/RAL, UK
SINN01 Technical Workshop Oldenburg 5-7 Dec 2001 Technical Discussion SINN01 Technical Workshop.
INRNE's participation in LCG Elena Puncheva Preslav Konstantinov IT Department.
Testbed Release Criteria and Plans WP8 Loose Cannons & App Representatives.
Software Management Workshop Steve Traylen. Software Management(WG5) The aim of the working group is to look at deficiencies in deployed and upcoming.
1 April 2, Software Packaging and Releasing Best Practices William Cohen NCSU CSC 591W April 2, 2008.
Testbed Monitoring Kaushik De Univ. of Texas at Arlington
Testbed: Status & Plans
The EDG Testbed Deployment Details
gLite Information System
Classic Storage Element
Use of Nagios in Central European ROC
Installation and configuration of a top BDII
KX-HTS Step by Step Guide SIP Phone in Existing Router
Steve Fisher / RAL March 2002
The EU DataGrid – Information and Monitoring Services
Resource monitoring and discovery in OGSA
Sergio Fantinel, INFN LNL/PD
Information System Virginia Martín-Rubio Pascual
EDT-WP4 monitoring group status report
Stephen Burke, PPARC/RAL Jeff Templon, NIKHEF
How QuickBooks Support beneficial for your Business
How to Update Microsoft Office on Mac
Final Project Presentation
Utilize Group Policy Terminal Server Settings
A conceptual model of grid resources and services
Report on GLUE activities 5th EU-DataGRID Conference
Tracking Status Monitor System
From Prototype to Production Grid
WP7 Network Monitoring Schemata
EGEE Middleware: gLite Information Systems (IS)
File-System Interface
MDS2 alpha Testing Phase
Edge Recorder Client
Information Services Claudio Cherubino INFN Catania Bologna
Presentation transcript:

LDAP monitoring status 20th June 2002 Paul Mealor

GridFTP monitoring Problems (excuses) Nothing, probably, in TB1.3 :-/ More than I thought. Datestamps were ambiguous (as I reported) Even when that was corrected, the Start date was completely incorrect (to the extent of giving negative times-elapsed). Hideous bug bought on by a case of misused pointers Both these problems are fixed, but not for TB1.3, AFAIK Nothing, probably, in TB1.3 :-/

Network Element/Site name The attribute in the LDAP is NE…but it is approximately analogous with site Given by site domain name ucl.ac.uk rl.ac.uk cnaf.in2p3.fr If you are looking for a site, search for the sourceNE or destNE Source and dest NE are configured statically. Look at http://datagrid.in2p3.fr/cgi-bin/cvsweb.cgi/network/netmon/etc/, and click on the number to the right of wp7-hostnameToNE to check if you’re there

Status in TB1.3 Network monitoring information provider Version 1.0.4 Built with autotools thanks to Franck Directory structure is dependant on WP3 edg-info-main Will be changed when they EDGify theirs Distributed as part of a CE and automatically configured by LCFG

Status for TB1.3 LCFG configuration If a flag in LCFG site config is set, netmon-info-provider will be configured NE name automatically set as site domain name Network monitor machine is automatically picked up As LCFG stands, there can only be one CE and one SE at a site The CE can be configured to be a GIIS, as well

Distribution now Installed at RAL, Lyon CNAF… problems Others?? Network Information Index Good news! The MDS hierarchy was disabled by a bug which has been found and fixed Another pointer bug, apparently

END