Andy Wolski University of Liverpool and the Cockcroft Institute

Slides:



Advertisements
Similar presentations
February 7, 2007-Beijing (Zisman-DR) Global Design Effort 1 Damping Ring EDR Plans Michael S. Zisman, Jie Gao, Susanna Guiducci, Andy Wolski DR Area System.
Advertisements

BILCW07 - Feb 2007 Global Design Effort 1 RDB S3: Damping Rings R&D Junji Urakawa for Andrzej Wolski (Cockcroft Institute), Susanna Guiducci (INFN-LNF),
March 22, 2011 Mauro Pivi SLAC ALCPG11 Eugene Oregon March 19-23, 2011 Working Group plans.
Global Design Effort 1 Summary of Technical and Collaboration Related Issues for the ILC Damping Rings N. Walker (for the Project Managers) INFN Frascati.
SuperB Damping Rings M. Biagini, LNF-INFN P. Raimondi, SLAC/INFN A. Wolski, Cockroft Institute, UK SuperB III Workshop, SLAC, June 2006.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
First approach to the SuperB Rings M. Biagini, LNF-INFN April 26th, 2006 UK SuperB Meeting, Daresbury.
7-Feb-07 GDE/ACFA Closing Beijing Global Design Effort 1 Summary of GDE Meeting and Future Actions Barry Barish 7-Feb-07.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 8, 2011.
Towards a Coordinated R&D Plan for ILC Damping Rings Impedance Issues Andy Wolski University of Liverpool and the Cockcroft Institute 28 September, 2006.
ILC Damping Rings R&D Meeting: Cornell, September 2006 Andy Wolski University of Liverpool and the Cockcroft Institute 26 September, 2006.
Sep 29 – Oct 3, 2009 LCWA 09 Linear Collider Workshop of the Americas Sept 29 – Oct 4, 2009 Damping Ring R&D updates SLAC Mauro Pivi SLAC Allison Fero.
NON-SCALING FFAGs: questions needing answers Andy Wolski The Cockcroft Institute, and the University of Liverpool Department of Physics. BASROC-CONFORM.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
Report on the Damping Ring Meeting at CERN, Nov , 2005 J. Gao IHEP, Beijing, China Nov. 24, 2005, ILC-Asia Meeting.
DR Kick-Off Meeting CI, 5 Nov 2007 Global Design Effort 1 Damping Rings Update (after the RDR) Andy Wolski.
Global Design Effort ILC: From RDR to EDR or “How to Spend the Money” Nick Walker GDE.
ILC damping ring options and their critical issues 12th July th ACFA MDI/POL/ACC Pohang Accelerator Lab. Eun-San Kim.
Electron cloud in the wigglers of ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University.
1 Simulations of fast-ion instability in ILC damping ring 12 April ECLOUD 07 workshop Eun-San Kim (KNU) Kazuhito Ohmi (KEK)
Damping Ring S. Guiducci AAP Review Tsukuba 20 April 2009.
DR 3.2 km Lattice Requirements Webex meeting 10 January 2011.
Working group on Damping rings, ATF and CESRTA October 20 th, 2010 S. Guiducci (INFN/LNF), M. Palmer (Cornell), Y. Papaphilippou (CERN), J. Urakawa (KEK/ATF)
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
June 13, 2007 Global Design Effort 1 ILC Effort at SLAC RDR > EDR Nan Phinney SLAC/GDE.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
GDE, 26 Oct 2007, FNAL Global Design Effort 1 Damping Rings Area System Summary Andy Wolski.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
ILC Damping Rings Electron Cloud Working Group Meeting Introduction S. Guiducci (LNF) ECLOUD10, Cornell 13 October
DR to RTML ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
ILCDR'07, 5-7 March, INFN-LNF, Frascati, Italy ILC Damping Rings Technical and Organizational Status Andy Wolski University of Liverpool and the Cockcroft.
Nov 17, 2009 Webex Assessing the 3.2 km Ring feasibility: Simulation parameters for electron cloud Build-up and Instability estimation LC DR Electron Cloud.
S. Guiducci WG3b - Damping ring size and layout. DR configuration recommendation Circumference and layout ~ 17 km dogbone 3 km or 6 km ring Single rings.
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
Damping Rings Lattice Evaluation Mark Palmer Cornell University January 19, 2011.
Welcome and the ATF2 international collaboration in future 1.Introduction 2.Mission of ATF/ATF2 3.Organization of ATF/ATF2 4.International Collaboration.
Vacuum System S. Guiducci BTR, LNF 8 July RDR - electron damping ring:
Summary David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008) First Intnl. Teleconference Ecloud, Impedance/Instabilities - M. Pivi, SLAC 31 October.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
MAC - 26 April 2007 Global Design Effort 1 RDB S3 Damping Rings R&D Andy Wolski The Cockcroft Institute, and the University of Liverpool on behalf of the.
ILC Damping Rings: Configuration Status and R&D Plans Andy Wolski Lawrence Berkeley National Laboratory January 19, 2006.
Damping Ring Specifications S. Guiducci ALCPG11, 20 March 2011.
3 February 2010 ILC Damping Ring electron cloud WG effort Mauro Pivi SLAC on behalf of ILC DR working group on e- cloud ILC DR Webex Meeting Jan 3, 2010.
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
1 AS TAG Leaders Meeting Webex - Friday S. Guiducci, M. Palmer.
Coupled bunch Instabilities at ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University Refer to.
Third ILC Damping Rings R&D Mini-Workshop KEK, Tsukuba, Japan December 2007 Choosing the Baseline Lattice for the Engineering Design Phase Andy Wolski.
CLIC Damping ring beam transfer systems
Oversea collaborators
Status and Plan of GDE Design Work (Including Road Map for RDR)
George Gollin University of Illinois at Urbana-Champaign and
Recent Electron Cloud Studies at CESR and Future Plans
E-cloud instability at CESR TA
Super-B Overview John Seeman Accelerator Systems Division
LER 2010 Overview (and other)
ILC DR instability simulations
M. Pivi PAC09 Vancouver, Canada 4-8 May 2009
ILC DR instability simulations
ILC Damping Ring electron cloud WG effort
CLIC damping rings working plan towards the CDR
CTA 09 - Introduction David Rubin Cornell Laboratory for
Session Introduction & Damping Rings Baseline Lattice Decision
ILC DR instability simulations
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008)
The Lepton colliders Data Base
Presentation transcript:

Andy Wolski University of Liverpool and the Cockcroft Institute Third ILC Damping Rings R&D Mini-Workshop KEK, Tsukuba, Japan 18-20 December 2007 Introduction: Damping Rings in the Engineering Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute

ILC Damping Rings Mini-Workshops Cornell University, September 2006 Electron cloud Fast injection/extraction kickers Impedance and impedance-driven instabilities INFN Laboratori Nazionali di Frascati, March 2007 Ion effects Lattice design Low-emittance tuning KEK, December 2007 Electron cloud Fast injection/extraction kickers Impedance and impedance-driven instabilities

Workshop Goals 1. To provide an opportunity for discussion of progress in R&D for the ILC damping rings in the areas of: electron cloud fast injection/extraction kickers impedance and impedance effects 2. To review plans for further R&D in these areas through the ILC Engineering Design Phase. 3. To discuss the two main options for the baseline lattice, and agree on a recommendation for the baseline lattice to be used through the engineering design phase.

Schedule

Charge to the Working Groups/Conveners The conveners should present summaries on Thursday morning: Mauro Pivi (ecloud) Tom Mattison (fast kickers) Marco Venturini (impedance) In the summaries, we should hear: A report on progress since the Cornell workshop. A list of (prioritized) issues and items for research, development, and design, with rough timescales and resource requirements. A list of deliverables for the engineering design phase, with: deadlines; contributors and resources. How can we reduce costs?