ELENA Extra Low ENergy Antiproton Ring

Slides:



Advertisements
Similar presentations
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
Advertisements

CESR as Light Source David L. Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
Electron Cooling Expected Performance & Construction.
FFAG-ERIT Accelerator (NEDO project) 17/04/07 Kota Okabe (Fukui Univ.) for FFAG-DDS group.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
2002/7/02 College, London Muon Phase Rotation at PRISM FFAG Akira SATO Osaka University.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
IEFC 22 March 2011T. Eriksson CERN BE/OP How to ensure a bright future of the AD.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Lattice, Injection Line and General ELENA Performance Limitations Pavel Belochitskii.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
ERHIC design status V.Ptitsyn for the eRHIC design team.
PHYSICAL PROJECT OF BOOSTER FOR NICA ACCELERATOR COMPLEX Alexey Tuzikov, Nikolay Agapov, Andrey Butenko, Alexey Eliseev, Viktor Karpinsky, Hamlet Khodzhibagiyan,
FLAIR meeting, GSI March Positron Ring for Antihydrogen Production A.Sidorin for LEPTA collaboration JINR, Dubna.
1 EMMA Tracking Studies Shinji Machida ASTeC/CCLRC/RAL 4 January, ffag/machida_ ppt & pdf.
1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Interactions with Rest Gas – Typical Case Interactions with Rest Gas – ELENA Quantitative analysis for ELENA Evaluations at 100 keV Ejection Energy Evaluations.
ELENA: Commissioning & operation ELENA beam commissioning Operation 12/11/2015T.Eriksson CERN BE/OP/AD1.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
Harold G. Kirk Brookhaven National Laboratory Quad/dipole Ring Coolers * Nufact’03 Columbia University June 6, 2003 * With contributions from A. Garren.
Villars, 26 September Extra Low Energy Antiproton Ring (ELENA) for antiproton deceleration after the AD Pavel Belochitskii for the AD team On behalf.
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
Lattice design for FCC-ee Bastian Haerer (CERN BE-ABP-LAT, Karlsruhe Institute of Technology (KIT)) 1 8 th Gentner Day, 28 October 2015.
Progress of Bunched Beam Electron Cooling Demo L.J.Mao (IMP), H.Zhang (Jlab) On behalf of colleagues from Jlab, BINP and IMP.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
T.Eriksson P.Belochitskii G.Tranquille CERN, BE department, 1211 Geneva 9 September 2011T. Eriksson CERN BE/OP.
Low Energy Antiproton Facility at CERN Christian Carli on behalf of the AD and ELENA team …. with special thanks to P.Beloshitskii, T.Eriksson and S. Maury.
ELENA RF Manipulations S. Hancock. Apart from debunching before and rebunching after cooling, the principal role of the rf is to decelerate the beam and.
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
Narrow plasma & electron injection simulations for the AWAKE experiment A. Petrenko, K. Lotov, October 11,
Slide 1 Overview Introduction Stochastic Cooling History of the Antiproton machines at CERN The AD and ELENA Conclusion.
Steering committee ELENA Project Structure S. Maury, project leader C. Carli, deputy project leader Beam physics and Performance Committee (G. Tranquille,
Preservation of Magnetized Beam Quality in a Non-Isochronous Bend
Third ILC Damping Rings R&D Mini-Workshop KEK, Tsukuba, Japan December 2007 Choosing the Baseline Lattice for the Engineering Design Phase Andy Wolski.
Parameters of ejected beam
Overview of Extra Low ENergy Antiproton ring (ELENA) and TE-EPC contribution to the project TE-EPC Group Meeting Michal Dudek 25th June 2015.
A.Lachaize CNRS/IN2P3 IPN Orsay
Physics design on the main linac
Space charge studies at the SPS
HIAF Electron Cooling System &
Lattice, Injection Line and General ELENA Performance Limitations
Options and Recommendations for TL and Dumps
Electron Cooling Simulation For JLEIC
First thoughts on ELENA beam impedances
Beam-beam effects in eRHIC and MeRHIC
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
Cui Xiaohao, Zhang Chuang,Bian Tianjian January 12,2016
Large Booster and Collider Ring
Requirements for the ELENA Electron Cooler
Siara Fabbri University of Manchester
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
FFAG Accelerator Proton Driver for Neutrino Factory
CEPC Injector Damping Ring
Multi-Turn Extraction for PS2 Preliminary considerations
LEIR Presented by M. CHANEL PSDAYS: EVIAN 2001.
MEBT1&2 design study for C-ADS
Negative Momentum Compaction lattice options for PS2
Physics Design on Injector I
Kicker specifications for Damping Rings
Negative Momentum Compaction lattice options for PS2
MEIC Alternative Design Part V
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Plans for future electron cooling needs PS BD/AC
Presentation transcript:

ELENA Extra Low ENergy Antiproton Ring 10 October 2011 LIS/ S. Maury

Motivation to build ELENA AD produces Antiproton beam at 5.3 MeV , most of AD experiments need antiprotons of 3 keV to 5 keV kinetic energy inside the trap. How antiprotons are decelerated today by experiments: Antihydrogen experiments (ALPHA and ATRAP) use set of degraders to slow 5.3 MeV beam from AD further down Poor efficiency due to adiabatic blow up of beam emittances and scattering in degraders, less than 0.1 % of AD beam is used. For ASACUSA, RFQD is used for antiproton deceleration down to around 100 keV kinetic energy. The deceleration is accompanied by adiabatic blow up (factor 7 in each plane) which causes significant reduction in trapping efficiency and in addition to that, RFQD is very sensitive to trajectory and optics mismatch errors About 70% beam is lost after passing through RFQD (transverse beam size too big) about 3-5% of antiprotons are captured after passing through degrader. 10 October 2011 LIS/ S. Maury

Gain in intensity with extra deceleration and cooling Deceleration of the antiproton beam in a small ring down to 100 keV with electron cooling increases the beam density. Emittances of beam passing through a degrader will be much smaller due to the use of the thinner degrader (100 keV beam instead of 5.3 MeV) => a gain of a factor 100 in intensity is expected for ALPHA, ATRAP and AEGIS. Because of the cooling, beam emittances after deceleration in ELENA will be much smaller than after RFQD => a gain of a factor 10 in intensity is expected for ASACUSA 10 October 2011 LIS/ S. Maury

ELENA in AD Hall Must be compact to fit in available space inside of AD Hall The commissioning of ELENA could be done in parallel with physics To use existing experimental areas The existing AD ejection line is re-used To minimize the distance from ELENA to the experimental areas To have a new (extra) experimental area 10 October 2011 LIS/ S. Maury

ELENA layout in AD Hall 10 October 2011 LIS/ S. Maury

ELENA injection line To make 82˚ bend, two magnets will be placed upstream to the shielding of AD Hall 5 or 6 quads used for matching of the Twiss functions (matching of dispersion not possible) Special care should be given to a crossing of injection and extraction lines 10 October 2011 LIS/ S. Maury

Injection into ELENA 10 October 2011 LIS/ S. Maury

Extraction from ELENA 10 October 2011 LIS/ S. Maury

ELENA ring (fast extraction only) 10 October 2011 LIS/ S. Maury

ELENA optics 10 October 2011 LIS/ S. Maury

ELENA cycle No electron cooling is performed at injection energy, the beam is decelerated immediately. One intermediate cooling at 35 MeV/c is needed to avoid beam losses The expected cycle duration is in the range of 10 to 15 seconds 10 October 2011 LIS/ S. Maury

Electron cooler for ELENA Cooling length lc, m 1 Beam cooled at momentum, MeV/c 35 & 13.7 Electron beam current Ie, mA 15 & 2 Cathode voltage at 100 keV, V 55 Maximal magnetic field in solenoid B0, G 100 Electron beam radius a, cm 2.5 10 October 2011 LIS/ S. Maury

Effects of cooler solenoid and compensators on machine optics Tune shift due to solenoidal fields, maximal at low energy due to constant magnetic field in electron cooler solenoid and compensators Coupling in the part of cooling section (effects on antiproton beam alignment). No coupling outside of cooling section due to use of compensating solenoids Focusing effect of electron beam on antiproton beam -> tunes shift of ELENA ring Trims can be used to compensate partly these effects 10 October 2011 LIS/ S. Maury

ELENA main parameters (to be revised by TDR) Momentum range, MeV/c 100 - 13.7 Energy range, MeV 5.3 - 0.1 Circumference, m 30.4 Intensity of injected beam 3 × 107 Intensity of ejected beam 1.8 × 107 Number of extracted bunches 1 to 4 Emittances (h/v) at 100 keV, π·mm·mrad, [95%] 4 / 4 ∆p/p after cooling, [95%] 10−4 Bunch length at 100 keV, m / ns 1.3 / 300 Required (dynamic) vacuum, Torr 3 × 10−12 10 October 2011 LIS/ S. Maury

ELENA - Tentative Planning Next step: detailed study and Technical Design Report TDR

Summary ELENA has been approved as a CERN project Which means that we now have to build it and make it work as a successful facility for this important research at low energy. Help and contributions to ELENA construction from interested external institutes vital (see ADUC & ELENA meeting ) ELENA will begin a new era for antiproton physics for many years to come Next step: detailed study and Technical Design Report (TDR) AD to be operated for at least one more decade (serious consolidation required) CERN is now engaged at two extreme fronts of particle physics, the very high and the very low energy side. 10 October 2011 LIS/ S. Maury

Thanks for your attention! 10 October 2011 LIS/ S. Maury

What do we want to know from physics community? The intensity limit in ELENA is defined by emittance and bunch length Which maximal bunch length in ELENA ring is acceptable for each experiment? Length of 300 ns was defined in 2004, should it be revised? Which maximal emittance in ELENA ring is acceptable for experiments? 10 October 2011 LIS/ S. Maury

Which help do we want ask from physics community for design studies? Electrostatic beam line studies: 1 MY Machine physics studies: ≥ 1 MY 10 October 2011 LIS/ S. Maury

Why did we choose 6-fold ring configuration? Initial ring circumference was 26.2m (1/7 of AD ring) -> not enough space to place all required equipment, not possible to prepare extra experimental area (SPSC request) -> new circumference is 30.4 (1/6 of AD ring) Advantages of the new rings: More flexibility for injection and extraction with the new layout The total length of bending magnets is shorter for hexagonal lattice compared with rectangular lattice -> more space for other equipment Minimal magnetic field in bending magnets (at 100 keV) increased form 399 Gs to 493 Gs – essential! Optics for 4 fold ring of 30 m long has unfavorable tunes (too much focusing in magnets), wide choice of tunes in 6 fold ring Smaller beta function values -> smaller aperture required by beam, relaxed requirement for vacuum 10 October 2011 LIS/ S. Maury