Hydro Power 101 2006 The Columbia River is a great natural resource for the Pacific Northwest, providing transportation, recreation, water for irrigation,

Slides:



Advertisements
Similar presentations
US Army Corps of Engineers BUILDING STRONG ® Mid-West Electric Consumers Association September 16, 2014 Corps of Engineers US Army Missouri River Mainstem.
Advertisements

1 Managing Uncertainty in Generation, Inventory and Revenue January 23, 2011 AMS Meeting AMS SHORT COURSE: HYDROLOGIC PREDICTION AND VERIFICATION TECHNIQUES.
NWHA- Panel Discussion “Spawning Better Ideas for Fish Passage”
3/16/20001 BPA’s traditional revenue stream varies with water supply (higher water conditions, higher revenues) BPA’s revenues from Slice are independent.
April Runoff Forecasts for the Columbia Basin and Power Supply Implications Jim Ruff and John Fazio Council Meeting April 14, 2010 Boise, ID.
PDO/PNA The PDO (Pacific Decadal Oscillation) is an index derived from North Pacific sea surface temperature anomalies and it has a high correlation to.
Washington County & the Tualatin River: Geography & Climate Geography The Tualatin River Watershed is a low elevation, low gradient drainage area that.
Klamath Watershed in Perspective A Review of Historical Hydrology of Major Features of the Klamath River Watershed and Evaluation of Hardy Iron Gate Flow.
Modeling Flood Control Flexibility using the GENESYS Hydro Model Kyle Martin Mainstem Hydrologist Columbia River Inter- Tribal Fish Commission Portland,
Alan Hamlet Dennis P. Lettenmaier JISAO Climate Impacts Group and the Department of Civil Engineering University of Washington March, 2001 CIG Water Resources.
Optimized Flood Control in the Columbia River Basin for a Global Warming Scenario 1Dept. of Civil and Env. Engineering, UW 2CSES Climate Impacts Group,
31 DECEMBER VARIABLE FLOOD CONTROL DRAFT FOR LIBBY RESERVOIR U.S. Army Corps of Engineers Northwestern Division, North Pacific Region.
Federal Columbia River Power System Operations Planning.
COLUMBIA RIVER SYSTEM OVERVIEW
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N McNary Dworshak Anderson Ranch Palisades Ice Harbor Grand Coulee Revelstroke Lower Monumental.
1 Brainstorming for Presentation of Variability in Current Practices Scenario B. Contor August 2007.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
1. Introduction 3. Global-Scale Results 2. Methods and Data Early spring SWE for historic ( ) and future ( ) periods were simulated. Early.
Hydrosystem Operations and Fish Recovery in the Columbia River Basin U
2014 Program Goal Statements for Salmon and Steelhead Overview Nancy Leonard, Laura Robinson and Patty O’Toole (NPCC)
Constructing Climate Graphs
John M. Volkman June 13, 2003 Either/Or? Is it Hydropower or Salmon in the Northwest?
ESET ALEMU WEST Consultants, Inc. Bellevue, Washington.
IRP Approach to Water Supply Alternatives for Duck River Watershed: Presentation to XII TN Water Resources Symposium William W. Wade Energy and Water.
Alan F. Hamlet, Philip W. Mote, Nate Mantua, Dennis P. Lettenmaier JISAO/CSES Climate Impacts Group Dept. of Civil and Environmental Engineering University.
Climate Change and The NW Power Supply Climate Impacts on the Pacific Northwest University of Washington April 21, 2009.
Hydro Power 102. Hydroelectric Models in the Northwest.
IMPROVING MILLERTON LAKE FLOOD CONTROL OPERATIONS TO INCREASE WATER SUPPLY Mr. Antonio M. Buelna, P.E. Mr. Douglas DeFlitch Ms. Katie Lee October 29, 2009.
Looking at Impacts of Climate Change on Seattle City Light Lynn Best, Director Environmental Affairs.
The Columbia River Basin Where we’ve been. Where we’re going. October 18, 2005.
CANADIAN COLUMBIA RIVER FORUM Biological Opinion: An overview of The impacts on Water Management Jim Barton, Chief of Corps of Engineers Columbia Basin.
Visit by Government Officials from Mozambique COLUMBIA RIVER SYSTEM BRIEFING III U.S. Army Corps of Engineers Northwestern Division North Pacific Water.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
Alan F. Hamlet, Philip W. Mote, Nate Mantua, Dennis P. Lettenmaier JISAO/CSES Climate Impacts Group Dept. of Civil and Environmental Engineering University.
Status of Columbia River salmon and links to flow: What we do and do not know Presentation to Northwest Power Planning Council December 11, 2002
Findings of Congress The Endangered Species Act is the last resort for species at risk of extinction. Under the ESA, the National Marine Fisheries Service.
Alan F. Hamlet, Philip W. Mote, Dennis P. Lettenmaier JISAO/CSES Climate Impacts Group Dept. of Civil and Environmental Engineering University of Washington.
Cost and Energy Impacts of Fish and Wildlife Operations NW Power Planning Council April 3, 2002 Boise, Idaho.
Visit by Government Officials from Mozambique COLUMBIA RIVER SYSTEM BRIEFING IV U.S. Army Corps of Engineers Northwestern Division North Pacific Water.
CANADIAN COLUMBIA RIVER FORUM U.S. Flood Control and Operational Perspective Jim Barton, Chief of Corps of Engineers Columbia Basin Water Management Division.
NON-TREATY STORAGE AGREEMENT “Introduction to Operations and the Non Treaty Storage Scenarios” Presenter: Jim Gaspard.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Non-Treaty Storage Agreement non-Binding Terms for Storage Accounts.
Alan F. Hamlet Jeffrey Payne Dennis P. Lettenmaier Richard Palmer JISAO Climate Impacts Group and the Department of Civil Engineering University of Washington.
Capacity Metric & Hydro Capacity Assessment Decisions Mary Johannis PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
Columbia River Basin Fish Restoration Activities ACCOMPLISHMENTS TO DATE AND UPCOMING ISSUES Bonneville Legal Briefing – October 2015.
Northwest Power Planning Council Fish and Energy Impacts Resulting from Reductions in Summer Bypass Spill July 16, 2003.
Resource Adequacy Assessment for 2015 Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
1 Bonneville Power Administration. 2 BPA markets power from 31 federally owned dams, one non-federal nuclear plant, and wind energy generation facilities.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Power Supply Adequacy for the 2021 Operating Year Resource Adequacy Advisory Committee Steering Committee Webinar June 8, 2016.
Changes in the Melt Season and the Declining Arctic Sea Ice
Earth Energy Advisors Monthly Energy Report
Northwest Fisheries Science Center Technical Management Team
Mississagua Lake Chain Levels To August 19, 2017 & Projections for Climate Change in the TSW Reservoir Area Presentation to the Cavendish Community Ratepayers’
Alan F. Hamlet, Philip W. Mote, Nate Mantua, Dennis P. Lettenmaier
Age at ocean entry of Snake River Basin fall Chinook and its significance to adult returns prior to summer spill at LGR, LGS, and LMN dams.
Se-Yeun Lee1, Alan F. Hamlet 1,2, Carolyn J. Fitzgerald3, Stephen J
Alan F. Hamlet, Philip W. Mote, Nate Mantua, Dennis P. Lettenmaier
Electricity Procurement Options
Alan F. Hamlet, Philip W. Mote, Nate Mantua, Dennis P. Lettenmaier
Kootenai Basin Spring/Summer Operations for 2016
Fall Chinook Management Measures
Constructing Climate Graphs
Long-Lead Streamflow Forecast for the Columbia River Basin for
Chapter 6: Estimating demand and revenue relationships
Central Asia is considered a global hotspot with respect to impacts of climate change on the mountain cryosphere and downstream societies, most notably.
2017 Flow, Debris, spill and TDG
GENESYS Current Functionality
Capacity Analysis in the Sixth Plan
Modifications to TDG Monitoring and Tracking
Presentation transcript:

Hydro Power 101 2006 The Columbia River is a great natural resource for the Pacific Northwest, providing transportation, recreation, water for irrigation, power generation and protection against flooding. It also contains one of the world’s largest salmon populations. Over the years, however, the number of salmon and steelhead has decreased due to changes in the environment. The region is aggressively trying to restore salmon and steelhead populations. The NW Power Planning Council, the National Marine Fisheries Service in conjunction with federal agencies and the Indian tribes and states have all developed comprehensive recovery plans. This course presents an explanation of the planning and operation of the multiple-use dams of the Columbia River. The first part of this presentation discusses what the hydroelectric system is, how its operation has changed over the past 20 years and how much it has cost. The second part is devoted to a discussion of how the operation of the hydro system is planned for and the computer models that are used to analyze the system.

The Pacific Northwest Power Supply 2

PNW Firm Generating Resources 3

The Hydroelectric System 4

5 The Columbia River is the fourth largest river in North America. The system drains 219,000 square miles in seven western states and 39,500 square miles in Canada. The Columbia River originates at Columbia Lake on the west slope of British Columbia’s Rocky Mountain Range. The Columbia River is 1,214 miles long. About 25 percent of the river flow comes from Canada. Federal agencies have built 30 major dams on the river and its tributaries. Many non-federal dams have also been built as well. In total, over 200 dams have been built on the Columbia River system. About 80 dams are large enough to be included in the simulation models to be discussed later in this session. 5

Comparison of Storage Volume to Variations in Runoff The additional energy, above and beyond the firm generating capability, comes from the hydroelectric system. Let’s begin with a short description of that system. The total useable storage capability of the Columbia River reservoir system (including Canadian projects) is only 30% of the average annual runoff volume in the Columbia River (42 Maf/134 Maf). The U.S. portion of the storage is approximately half of the total (15% of the average annual runoff). Because of the small amount of storage capability, the Northwest can do little to reshape the natural river flows. 6

Variability in PNW Hydro Generation 7

Monthly Shape of River Flow and PNW Electricity Demand Let’s now look at the hydroelectric system in more detail. It is not only important to know how much energy the system can produce on an annual basis but also how much it can produce on a monthly basis. This overhead illustrates the monthly shape of electricity demand which peaks in the winter and is lowest in the spring. Also illustrated on this graph is the monthly shape of hydroelectric generation, if no reservoir storage were available. Hydroelectric generation peaks in the spring months when the snowpack melts and river flow is highest. By building dams with storage capability, river flows (and generation) can be shifted to other months to better fit the shape of demand. For power purposes, water is stored during the spring runoff for later release in fall and winter months when demand is higher. This action reduces river flows in the spring and increases flows in the fall and winter months. 8

Typical Reservoir Operation This particular graph reflects the rule curves for Libby Dam for water year 1945. Libby has a fixed December flood control elevation of 2,411 feet for all years and all water conditions. In a very wet year, the flood control curve (red line) would dip below the December limit of 2,411 to nearly empty by April. The yellow dashed line represents the actual energy regulation. It differs from the refill curve because it contains some of the fish constraints. One constraint attempts to have Libby as full as possible by the end of June so that more water will be available for summer flow augmentation. A second constraint allows Libby to be drafted as much as 20 feet down from full by the end of August to help achieve river flow targets in the summer. 9

Natural and Regulated River Flows A good amount of the spring runoff can be captured in dams for later use in fall and winter months. This overhead illustrates how the operation of dams has changed river flows to better match the need for power. Typically, dams are at their lowest elevations just before the spring runoff season. As the snow melts and flows increase, some of the water is captured with the intent to fill dams by the end of summer. In the fall, water is released from storage, as needed, to help meet firm demands. This effectively shifts spring flows to fall and winter months. If we had more storage capability, river flows could be shifted even more to match the shape of electricity demand. 10

Balance between Resources and Demand 11

Historic Load/Resource Balance (Based on Critical Hydro) During the 1980s, the region experienced a surplus of firm generating capability. Little resource development was done. Efforts went into managing the surplus. By about 1990, the surplus was gone and talk of deregulation became more prominent. Also, several species of salmon were listed under the ESA, which prompted a more constrained hydro operation and a reduction in overall hydro generation. Even though the load/resource balance was continuing to decrease, no one was particularly alarmed. The region was counting on being able to “share” resources with the southwest, since their peak demand season is late summer and the Northwest’s peak season is winter. With the onset of deregulation, utilities and IPPs were reluctant to build new resources because of the financial risk. By the late 1990s it became evident that if something were not done soon that the Northwest’s electricity system would not longer be adequate. 12

What’s Happened Since 2000? (Incremental Changes) 13

Forecast L/R Balance (all load forecasts, critical hydro) 14

Changes to the Hydroelectric Operation for Fish and Wildlife 15

Types of Changes Flow Augmentation – Hold back winter water for later release during spring and summer migration season to shorten travel time Bypass Spill – Route some flows around turbines to increase passage survival 16

Milestones in Fish Recovery 1984 - Council’s Water Budget and Spill 1992 - Council’s Strategy for Salmon 1994 - Council’s Revised F&W Program 1998 - NMFS Biological Opinion 2000 - NMFS Biological Opinion 2003 – Council’s Revised F&W Program 2004 – NMFS Amended BiOp In 1984 the Council produced its Fish and Wildlife program that included actions to aid anadromous and resident fish and wildlife. It was hoped that these actions would reverse the downward trend in populations of several weak anadromous stocks. By 1990, it became clear that these actions alone would not be enough. In that year, then senator Hatfield (Oregon) kicked off what has become known as the “salmon summit” which placed more emphasis on the problem. The Council responded by revising its program in 1992. In spite of the additional focus on dwindling populations, several species were petitioned to be listed as threatened or endangered. The Council again revised its program in 1994, adding more actions to aid anadromous and resident fish and wildlife. In 1995, the National Marine Fisheries Service, using its jurisdiction under the Endangered Species Act, developed a biological opinion regarding the listed species. This biological opinion had elements that directly affected the operation of the hydroelectric system. The biological opinion was revised in 1998 and will be revised again this year. The Council is also in the process of revising its fish and wildlife program. 17

Summary of Changes (affecting mainstem passage) Increased volume for flow augmentation Longer flow augmentation period Increased bypass spill levels Longer period for bypass spill In general, the changes made to the operation of the hydroelectric system to aid fish and wildlife are summarized in the slide above. More stored water has been made available to help increase river flows and to control temperature. More of the river flow is being diverted around the turbines to increase smolt survival. And many other actions are being implemented to make the river system a more healthy environment for fish and wildlife. 18

Flow Augmentation Period Among other actions in the Council’s 1984 fish and wildlife program, a little under 5 million acre-feet of water was to be reserved to increase river flows in May at both McNary (Columbia) and Lower Granite (Snake) dams. As both the Council and NMFS continued to revise their respective plans to aid fish, the period of time over which flows would be augmented has grown to nearly 5 months, from April through August. Also, the period of time when some percentage of river flow is diverted past the turbines (bypass spill) has also increased. 19

Max Flow Augmentation Volumes Since 1984, the volume of water reserved for flow augmentation or for temperature control has increased from about four and a half million acre-feet (maf) to about 12.5 maf. This total includes one maf from Canadian storage and 427,000 acre-feet from Upper Snake River dams. The total volume reserved for fish operations is over half of the total storage capability of all the US reservoirs (12.5 maf/21 maf). 20

Changes in River Flows (since 1980) The shift in river flows, from spring to winter for power needs, is believed to be harmful to salmon because it slows down the river during the migration period. Slowing down the river results in a longer travel time for smolts to get to the ocean. Longer travel time means more exposure to temperature, predators and other harmful factors. The premise behind the recovery plan is that by increasing the velocity of the river, and thereby decreasing smolt travel time, survival will increase. Since 1980, river flows have been partially restored to a more natural shape (the solid green line in the overhead). In addition, some of the flows in the spring and summer are routed around the turbines (spilled) to increase survival past the dams. This change in river operations is not without cost. By withholding more water in reservoirs in fall and winter, cheap hydroelectric energy is reduced during these months, occasionally forcing utilities to forego sales or to purchase from out-of-region sellers. 21

Change in Hydro Generation (Relative to an operation with no fish constraints) Here we add the change in hydro generation to the price chart in the previous slide. The monthly cost (or benefit) is then, just the loss (or gain) of energy (MW-hours) times the price ($/MW-hours). The region should expect an average cost in all months from September through March. As river flows are increased from April through August, the region will see revenue gains, especially in July and August when prices are the highest. Overall, the total regional annual energy cost is about $153 million. 22

Annual Cost of Fish and Wildlife Hydro Operations 23

2006 Forecast Market Price for Electricity This slide graphically depicts the forecast of west-coast wholesale market prices for electricity. This forecast was developed with the AURORA model. For the west coast, prices are highest during July and August when southwest demand is greatest. A winter peak in prices is also visible but is not as significant as the summer peak. Prices are lowest in May when there is ample supply of hydro generation and demands in both the northwest and southwest are low. The average price across all months of the year is about $27/MW-hour. 24

Evaluating the Cost for 2006 (Energy Loss and Market Price) Here we add the change in hydro generation to the price chart in the previous slide. The monthly cost (or benefit) is then, just the loss (or gain) of energy (MW-hours) times the price ($/MW-hours). The region should expect an average cost in all months from September through March. As river flows are increased from April through August, the region will see revenue gains, especially in July and August when prices are the highest. Overall, the total regional annual energy cost is about $153 million. 25

Average Monthly Regional Energy Cost While the net annual energy cost is about $153 million, monthly costs (and benefits) can vary substantially. Costs range from a low of about $10 million in November to a high of about $50 million in December. The total cost over the fall and winter months is about $218 million. Benefits in the spring and summer range from a little under $10 million in April to over $30 million in July. The total benefit (revenue gains) over the spring and summer months is about $65 million. The net annual cost is then $218 million minus $65 million or about $153 million. The costs portrayed in this slide are average values based on the change to hydro generation averaged over a 50-year historical water record. Variation in year to year costs will be presented later. 26

Dealing with Uncertainties

Historical Runoff at The Dalles This slide illustrates the variability in the amount of water that flows in the Columbia River from year to year. An average year would appear on this chart as a bar with zero height. In the driest year (1977) the runoff was almost 50 percent lower than the average. In the wettest year (1974) the runoff was nearly 50 percent greater than the average. It is difficult to tell from this slide whether or not a pattern exists, although there are clearly dry periods and wet periods. 2005 Forecast 69% of Average 28

Recent Runoff Volumes (January-July Volume at The Dalles) 29

Variation in Cost due to Water Conditions (2006) The next series of overheads demonstrate the uncertainty and variability in the estimate of power system cost due to water conditions. Yearly costs range from a low of about $100 million to a high of about $260 million (with an average of about $153 million). There does not appear to be a very good correlation between cost and runoff volume, although the costs for wet years (far right hand portion of the graph) all tend to be below the average value. Intuitively, one might think that cost should decrease as runoff volume increases. This relationship, however, does not hold true because of other factors, two of which are described below: Because spill requirements are prescribed as a percentage of flow, the higher the runoff and flow, the higher the spill and foregone sales and this contributes to greater cost in wet years. Another factor affecting cost is the timing of the runoff. Warm temperatures in March and April can initiate an early runoff prior to the migration season. And, conversely, a cold spring might delay the runoff until May or June. 30

Cost Probability Curve (2006) This overhead displays the probability that recovery costs in a particular year will be at or above a certain magnitude. The curve indicates that there is only about a 10 percent chance that the cost in any given year will be less than $100 million (bottom right part of the curve). Similarly there is about a 10 percent chance that costs will be greater than $200 million (top left part of the curve). There is about a 50 percent chance that the cost will be $153 million or greater. 31

Fish and Wildlife Cost Components

Bypass Spill and Flow Costs This overhead displays the probability that recovery costs in a particular year will be at or above a certain magnitude. The curve indicates that there is only about a 10 percent chance that the cost in any given year will be less than $100 million (bottom right part of the curve). Similarly there is about a 10 percent chance that costs will be greater than $200 million (top left part of the curve). There is about a 50 percent chance that the cost will be $153 million or greater. 33

BiOp Flow Costs (Generally, as runoff increases, cost goes down) 34

Bypass Spill Costs (A non-linear function of runoff) 35

Anatomy of Bypass Spill Costs 36