Civil Engineering Construction Technology and Organization 1/2

Slides:



Advertisements
Similar presentations
Final Project 7th semester Maria Amparo Prieto Project: Svanekøkkenet Århus Office Building.
Advertisements

ECE 201 Electrical Networks I Instructor: Professor (not Dr.) Richard Farmer.
Inputs and Feedback on Seed Availability Application Prepared by: Working Group 3 Presented By: Sh. D. V. Singh SSA, NIC.
Constructionsite Roles in Construction Ron Gatepain.
CONSTRUCTION MANAGEMENT CONSTRUCTION ENGINEERING & MANAGEMENT DEPT
1 SWEET Simple Wiki Embedded Editing Tool The SWEET Team Michael Kouyessein Brian Sullivan Yuan-Hsun Tang Fangyan Xu The SWEET Website
1 Fall 2008 (c) Copyright 2008 Mortensen Consulting Group LLC Session #12 Strategic Management Dr. Mark H. Mortensen Sessions 001 and 270 Thursdays 6:00PM.
VIA / TCU 4th semester workshop S2016 Intro BPM VIA University CollegeTCU-VIA Workshop – S2016 JMOG1 Agenda What is BPM? The wedding party – The processes.
VIA / TCU 4th semester workshop S2016 Soil work and machines VIA University CollegeTCU-VIA Workshop – S20161 Factors to remember in the working process.
Contract and Tender form Phases of Designing Phases of Implementation VIA / TCU 4th semester workshop S2016 Contract and Tender form S2016 VIA University.
Who am I? Jan Wolff Background: Civil Engineer (Major in Structural Design) Consulting Engineer, years (DK, G, Botswana) Project- and Site manager,
PROJECT COMMUNICATION PROCEDURE AND DOCUMENT MANAGEMENT
Computer Science / Pre-Engineering Departmental Meeting
Construction site plan
Civil Engineering Construction Technology and Organization
Introduction to CS Senior Design Project I / II
Pre-contract Planning and Practice
CIVL 493 CONSTRUCTION MANAGEMENT
The Documents Necessary for Tendering a Project for Bids:
The Documents Necessary for Tendering a Project for Bids:
Requirements Walk-through
BUILDING PROCESS STAGES
Shed exercise VIA / TCU 4th semester workshop S2016
Personal planning and portfolio
Exam Instructions Please answer 7 questions and the case study (100 points total). Required part of your exam: questions 2 (choose only 5 of the approaches.
Registration assignment
Design-Bid-Build (Ch. 149) vs. Construction Manager at Risk (Ch. 149A)
Text here Distance assignments VIA / TCU 5th semester workshop
Copyright 2005 Prentice Hall
BUILDING PROCESS STAGES
Time schedule for implementation as main contractor
ME 123 Computer Applications I Lecture 40: Course Review 5/23/03
Recap Recap construction site plan
Recap Recap construction site plan
Intro BPM VIA / TCU 4th semester workshop S2017 Agenda What is BPM?
Welcome, Parents and Students!
Why do we use the WBS method Common assignment – Eat project Examples
Quantities and Price.
Quantities and Price.
Recap Recap construction site plan
Final exam VIA / TCU 5th semester workshop VIA University College
Agenda - Basic planning (with Project libre)
TCU-PROJECT: 7TH Semester Course
Welcome to the 5th semester
Final exam – 2 storey building
Contract and tender form Phases of designing Phases of implementation
Recap QUANTITIES Taking out quantities
Exercise – A small building.
Comments: • Illustrates the management functions within a construction company • Planning supports estimating • Planning supports construction Discussion:
Introduction to CS Senior Design Project I / II
Final exam 3rd semester A2018
Health and safety VIA / TCU 5th semester workshop
Welcome to the 4th semester Intro to S2017
Welcome to the 5th semester
Health and safety VIA / TCU 5th semester workshop
Shed exercise VIA / TCU 4th semester workshop VIA University College
Teacher & 2 Students in Front Left
6th. Semester Schedule: 1st. Week
Exercise : Making a wedding cake
Health and safety VIA / TCU 5th semester workshop
Inputs and Feedback on Seed Availability Application
The Valley Foundation School of Nursing San José State University
The Valley Foundation School of Nursing San José State University
CASE 2 : Two-storey building
Renting equipment VIA / TCU 4th semester workshop Agenda The 4 Ms
Welcome to the 4th semester
Machinery and equipment continued
Welcome to the 5th semester
QUANTITIES Taking out quantities
Advisement 15 minute homeroom Ms. Turnbull
Presentation transcript:

Civil Engineering Construction Technology and Organization 1/2 Exam Civil Engineering Construction Technology and Organization 1/2 VIA / TCU 5th semester workshop VIA University College TCU-VIA Workshop 1

Civil Engineering Construction Technology and Organization 1/2 Exam Civil Engineering Construction Technology and Organization 1/2 VIA / TCU 5th semester workshop Cheetah 1 (1.1) Aby 2 (1.2) Aimee 3 (1.3) Dora Bell Elisabeth Isabella Gregory Evelyn Jassica Wes Yogi Frank 4 (1.4) Allen 5 (1.5) Becker 6 (2.1) John Kevin Fitch Ron Herman Mark Slade Paul Wang 97 Bruce 7 (2.2) Caroline 8 (2.3) Circle ma 9 (2.4) Justin Lavine David Michael Poppy Jack 2 Peter Richard Petar Jack 1 10 (2.5) Rolam 11 (3.1) Alina 12 (3.2) Licha Rub Elsa Park Shirley Lancelot Reg Zoe Tina Alon 13 (3.3) Ann 14 (3.4) Foad 15 (3.5) Nate Gloria Kassa Pepper Kori Kid Aaron VIA University College TCU-VIA Workshop 2

Civil Engineering Construction Technology and Organization 1/2 Exam Civil Engineering Construction Technology and Organization 1/2 VIA / TCU 5th semester workshop Time Presenting group Opponent group Time (minutes) Presenters Opponents Change + comments Thursday   14.00-14.15 1 - (1.1) 6 10 2 3 14.15-14.30 2 - (1.2) 7 14.30-14.45 3 - (1.3) 8 14.45-15.00 4 - (1.4) 9 15.00-15.15 5 - (1.5) Break 15 15.30-15.45 6 - (2.1) 11 15.45-16.00 7 - (2.2) 12 16.00-16.15 8 - (2.3) 13 16.15-16.30 9 - (2.4) 14 16.30-16.45 10 - (2.5) Friday 8.30-8.45 11 - (3.1) 1 8.45-9.00 12 - (3.2) 9.00-9.15 13 - (3.3) 9.15-9.30 14 - (3.4) 4 9.30-9.45 15 - (3.5) 5 VIA University College TCU-VIA Workshop 3

Civil Engineering Construction Technology and Organization 1/2 Exam Civil Engineering Construction Technology and Organization 1/2 VIA / TCU 5th semester workshop The exam is performed by presenting PPT in the classroom by each group The process for making your part (trade) of the house is to be showed as network diagram. An detailed explanation for which machines you will choose for your trade. Gantt diagram showing the time schedule for implement the multi storey building. A detailed construction site plan for your site including the needed equipment. Calculation and quantity take out for the multi storey house. A complete bidding form is filled out to the client with the final price for the project. The CM for your company is fixed to 10% on each sub contractor. Salary for 1 MH is fixed to 100 RMB Your group may need to corporate with some other groups to find all the prices. The PPT from each group must also be uploaded on the TCU-VIA platform. VIA University College TCU-VIA Workshop 4

Civil Engineering Construction Technology and Organization 1/2 Exam Civil Engineering Construction Technology and Organization 1/2 VIA / TCU 5th semester workshop Your mark for the exams will be based on: 1) Language skills 2) Presentation 3) Overall comprehension of subjects 4) Attendance VIA University College TCU-VIA Workshop 5

Civil Engineering Construction Technology and Organization 1/2 Exam Civil Engineering Construction Technology and Organization 1/2 VIA / TCU 5th semester workshop Good luck VIA University College TCU-VIA Workshop 6