AB-RF-FB section meeting

Slides:



Advertisements
Similar presentations
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
Advertisements

Longitudinal instabilities: Single bunch longitudinal instabilities Multi bunch longitudinal instabilities Different modes Bunch lengthening Rende Steerenberg.
Potential improvements of the PS 10 MHz cavities driving amplifier G. Favia Acknowledgments: V. Desquiens, F. Di Lorenzo S. Energico, M. Morvillo, C.
A longitudinal damper for the PS (preliminary ideas) 24 April 20121M. Paoluzzi BE/RF.
“What you get” Transverse damper system (ADT) F. Dubouchet W. Höfle G. Kotzian D. Valuch Special thanks to: A. Boucherie, A. Butterworth, S. Calvo, G.
Front-end amplifiers for the beam phase loops in the CERN PS Alessandro Meoli (CERN BE/RF/FB) Supervised by Heiko Damerau 21 April CERN.
A.Blas AB/RF/FB APC meeting 20/4/ Status of the PS TFB Upgrade launched in July 2005 L. Arnaudon, A. Blas, F. Caspers, D. Glenat, R. Louwerse, V.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
March 2, 2007ELC Experience with clearing voltages and solenoids at SPS damper pick-ups W. Hofle Acknowledgements PS-OP, SL-OP, SL-BI LHC-VAC, SL-HRF.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
Linac Marx Modulator Update Trevor Butler 5/20/2015.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Ongoing rf studies in the PSB A. Blas CERN-GSI meeting 22/09/ Transverse blow-up 2.Localization of narrow band transverse impedances 3.Cavity.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
Collected by E. Jensen, BE-RF 1 ATOP days RF limitations.
Measurement opportunities with the LHC transverse damper W. Hofle, D. Valuch.
PSB RF bypasses + PSB TFB electronics A. Blas PSB-LIU meeting04 Jun Executive summary: Components for the PSB rf-bypasses will be installed (Joao.
Update of the SPS transverse impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, F. Caspers, E. Chapochnikova, G.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
Wolfgang Hofle BE/RFSPS Studies WG - November 17, 20091/23 reported by Wolfgang Hofle CERN BE/RF/FB Transverse feedback to cure electron-cloud induced.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
A.Blas APC meeting 12/5/ Status of the PS TFB Project triggered by: K. Schindl and R. Cappi Hardware: J. Belleman (PU amplifiers) T. Bohl, W. Hofle,
E-cloud studies at LNF T. Demma INFN-LNF. Plan of talk Introduction New feedback system to suppress horizontal coupled-bunch instability. Preliminary.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
Elias Métral, ICFA-HB2004, Bensheim, Germany, 18-22/10/ E. Métral TRANSVERSE MODE-COUPLING INSTABILITY IN THE CERN SUPER PROTON SYNCHROTRON G. Arduini,
Andreas Jansson, "Quadrupole Pick-ups", LHC BI-Review, November 19-20, Quadrupole Pick-ups  What is a quadrupole pick-up?  PS pick-ups and experimental.
LEIR Transverse Dampers Alfred Blas LIU-ION LEIR Internal Review Associated colleagues: Michel CHANEL Alan FINDLAY Wolfgang HOFLE Reinier.
Elias Métral, LHC Beam Commissioning Working Group meeting, 30/11/2010 /241 PRELIMINARY FINDINGS FROM INSTABILITY MEASUREMENTS DURING THE 75ns AND 50ns.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Coupled-bunch oscillation feedback studies 1 H. Damerau LIU-PS Working Group Meeting 20 February 2013 Many thanks to R. Garoby, S. Gilardoni, S. Hancock,
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
Elias Métral, LHC collimation working group meeting, 17/07/061/26 E. Métral for the RLC team LATEST ESTIMATES OF COLLIMATOR IMPEDANCE EFFECTS u Reminder:
ADT kickers and amplifiers in tunnel point 4 of LHC, RB44 and RB46 1 W. Hofle LHC Transverse Damper LARP CM20 Napa April 8-10, 2013 LHC Transverse Damper.
LFB, LLRF, TFB Alessandro Drago Annecy, March 2010.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
W. Hofle / March 5, 2008 Extended LTC meeting 1/22 Acknowledgements: P. Baudrenghien, A. Butterworth, E. Ciapala, B. Goddard, A. Koschik, F. Killing, G.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
RF acceleration and transverse damper systems
Dither Luminosity feedback versus Fast IP feedback
Jorge Sánchez-Quesada BE-RF-FB
Status of the PS TFB Hardware Overview Machine results To be done
Longitudinal impedance of the SPS
Summary of the dedicated MD on July 4th 50ns in SPS with nominal and low γt optics – transverse aspects T. Argyropoulos, H. Bartosik, T. Bohl, A. Burov,
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Wideband, solid-state driven RF systems for PSB and PS longitudinal damper.
Emittance growth AT PS injection
Saturday 21st April 00:33 Interlock during ramp on BLM HV
A. Al-khateeb, O. Chorniy, R. Hasse, V. Kornilov, O. Boine-F
Benchmarking the SPS transverse impedance model: headtail growth rates
Transverse Feedback System (LHC Damper)
Recent Electron Cloud Studies at CESR and Future Plans
New AD Production Beam in the PSB
Multiturn extraction for PS2
Strip-line Kicker R&D at KEK-ATF
The SPS 800 MHz RF system E. Shaposhnikova for BE/RF
Limits on damping times
The LHC25ns cycle in the PS Triple splitting after 2nd injection
PSB magnetic cycle 160 MeV to 2 GeV
PSB magnetic cycle 160 MeV to 2 GeV with 2.5E13 protons per ring
Feedforward correction to injection bump error in the SPring-8
STABILISING INTENSE BEAMS
PSB rf Foreseen limitations with 2 E13 p at 2 GeV
PSB magnetic cycle 900 ms MeV to 2 GeV
ELENA / AD Pick-ups and Schottky
eSPS Impedance Considerations Aaron Farricker Acknowledgements: T
Presentation transcript:

AB-RF-FB section meeting PS TFB PS TFB Project triggered by: K. Schindl and R. Cappi Hardware: J. Belleman, A. Blas, T. Bohl, F. Caspers, J.L. Gonzalez, W. Hofle, J. M. Lacroix, S. Livesley, R. Louwerse, M. Paoluzzi, F. Pedersen, V. Rossi, J. Sladen Hardware simulations: V. Vendramini, E. Vogel Beam decoherence study: E. Benedetto, M. Chanel, M. Martini, E. Metral, F. Zimmermann Where do we come from? Where are we? Where do we go? A.B. 16 February 2005 AB-RF-FB section meeting

AB-RF-FB section meeting PS TFB History 05/98 First meeting, start of the PS TFB project 10/98 Start study of a kicker prototype (J-L Gonzalez) 06/99 H Kicker mechanical design started (J-M Roux) 11/99 Mechanical drawings in the final version. 01/00 Price Enquiry for a single bloc vacuum chamber (3 pieces; H + V + spare) 04/00 Second price enquiry sent for vacuum pipes in two pieces (no response for single bloc) 10/00 Order placed to Metaceram (Hiperceramics was second) 05/02 Order cancelled 08/02 New price inquiry 10/02 Order placed to Hiperceramics; delivery planned for April 2003 01/03 Project taken over by rf 10/03 Successful test of electronic prototype on old kicker an amplifier 11/03 Delivery of ceramic pipes 01/04 H kicker Delivered, Ceramic pipe not vacuum tight after brazing (weak metallization) 08/04 Re-design of transition pieces 10/04 Order placed for re-metallization (SCT) and new ceramic rings (Hiperceramics) A.B. 16 February 2005 AB-RF-FB section meeting

AB-RF-FB section meeting PS TFB 1 2 3 A.B. 16 February 2005 AB-RF-FB section meeting

AB-RF-FB section meeting PS TFB Kickers Initial requirements: R. Cappi 1999 Damping of a +/-1.5 mm oscillation within 100 turns (chromaticity) Bandwidth: [10kHz - 20 MHz] (q = 0.1, 20 MHz kicker ripple) Decision taken 2 x 3 kW, magnetic kicker Final result (F. Caspers 12/04) Usable bandwidth = 10 MHz (limited by non linear phase and transit time factor (68 ns) Field above Roberto’s specs (factor 7) A.B. 16 February 2005 AB-RF-FB section meeting

AB-RF-FB section meeting PS TFB Kickers Workload for modifying the magnetic kicker? make it shorter (1/3) for transit time factor Change the shape of capacitive plate to increase ZC This means a complete re-design Could we use the old strip line kicker? yes!! (see next slide) A.B. 16 February 2005 AB-RF-FB section meeting

AB-RF-FB section meeting PS TFB Kickers Why is the strip line kicker ok for the job? with 2 x 3 kW, it give almost exactly what is required in term of kick Its bandwidth is only limited by the transit time factor of 3 ns (166 MHz) What ‘s wrong with it? Impedance matching to be improved Impedance transformer required with present amplifiers From Reinier Input impedance: 12.5 Ω Output impedance: 112.5 Ω (x9) Each coax: 37.5 Ω = two 75 Ω in // Voltage gain = 3 A.B. 16 February 2005 AB-RF-FB section meeting

AB-RF-FB section meeting PS TFB Kickers Is there a security margin with the strip line kicker? The LHC beams have been obtained without dampers  Factor 6.25 in kick strength with nominal LHC beam (to be checked with totem beam) (decoherence in 2ms, 0.32 ms calculated by Roberto) Chromaticity could be lowered by a factor 2 in 2007 (new PFW power supplies) What ‘s unknown (yet)? Impedance transformer characteristics A.B. 16 February 2005 AB-RF-FB section meeting

AB-RF-FB section meeting PS TFB Amplifiers Initial requirements Bandwidth: [10kHz - 20 MHz] 3 kW on 12.5 Ω Actual performances Bandwidth: [100kHz - 35MHz] 3 kW – 2 ms, 100 W CW What ‘s unknown? Precise phase response A.B. 16 February 2005 AB-RF-FB section meeting

AB-RF-FB section meeting PS TFB Amplifiers What’s wrong? The first Betatron line (q. FREV) is not covered Does it matter? There are two answers to this question, one valid for injection damping, the other for h-t instabilities ( Injection damping is faster than the growth rate of h-t instabilities -1ms vs 10 to 100 ms) During injection, what matters is the spectrum of the beam. Less than 8 % of the energy is in the first Betatron line. If it isn’t driven instable, there should be only 8% less damping efficiency in linear regime and almost no difference in saturation mode. For h-t modes, only the negative (n+Q).FREV lines are instable, but somehow “compensated” by the positive spectral lines… except (when ξ≠0) for the first negative line n = -7 or (1-q).FREV . As q Є [0.2 0.4], n = -7 mode Є [348 kHz, 261 kHz]. This instable line is covered by the amplifier. Of course the q.FREV line should be “electronically” stable. Is there a proof? see next slide ! A.B. 16 February 2005 AB-RF-FB section meeting

AB-RF-FB section meeting PS TFB Amplifiers Is there a proof that the system would work with 100 kHz HP cutoff? Injection error damping with wideband feedback Simulations from Elmar 50 turns/div With H.P. A.B. 16 February 2005 AB-RF-FB section meeting

AB-RF-FB section meeting PS TFB Amplifiers details of the simulation Is there a proof concerning h-t instabilities? It is a well established theory ! A.B. 16 February 2005 AB-RF-FB section meeting

AB-RF-FB section meeting PS TFB Amplifiers Has everything been taken into account? e-p instabilities: not observed in the PS ! h-t modes: have a damping effect with positive ηξ (both negative at PS injection) => positive chromatic frequency. It damps the injection errors with a time constant of 5 ms (20 ms total damping) without emittance blow-up (simulation by Elias) Chromaticity and Chromatic frequency: it changes the instable m-mode but not the frequency at which it should be corrected. In 2007 we might have a lower ξ => less kick requirements Broadband impedance: should damp the lower modes without blow-up. Under simulation (E. B. + F. Z.) Space charge: it is beneficial as it increases the filamentation time. Octupolar tune: speeds-up filamentation but not foreseen in normal operation Real kicker ripple (30 MHz): ok with the amplifier (35 MHz) A.B. 16 February 2005 AB-RF-FB section meeting

AB-RF-FB section meeting PS TFB Electronic core How do we do? Use of LHC 1TFB and TFB hardware made compatible with minor add-ons Specific FPGA programming software A.B. 16 February 2005 AB-RF-FB section meeting

AB-RF-FB section meeting PS TFB Budget No budget allocation for 2005. 133 kCHF need to be found!! - 3kW power loads: 10k - Impedance matching transformers: 8k (6k FSU + 2k material) - Kicker modification (mechanical setup for fixing Xformers and loads + install new feedthroughs): 8k (7k FSU + 1k material) - Interlock circuit design and construction: 16k (6k study + 10k construction) - Construction of circuits developed for LHC: 12k - VME crate to plug new PCBs : 10k - Strip-line Kicker modification: 15k (5k mech. Study, 10k construction and material) - Power amplifiers modification: 35k (in case we do not change the PCB's) - Cabling in racks: 4k - Ceramic pipes end work: 10k - Unexpected: 5k Total: 133 kCHF What has been spent: H/V kicker study: 100k H kick construction: 100k Ceramic pipes: 100k Electronics, cabling: 50k Total: 350k Originally planned: 360k A.B. 16 February 2005 AB-RF-FB section meeting

AB-RF-FB section meeting PS TFB Workload - 3kW power loads: 1 W - Impedance matching transformers: 4 W Kicker modification : 4 W Interlock circuit design and construction: 7 W - Construction and test of circuits developed for LHC: 3 W - VME crate: 1 W - Strip-line Kicker modification: 4 W - Power amplifiers modification: 12 W - Cabling in racks: 1 W Ceramic pipes end work: 1 W FPGA programming: 8 W Supervision: 3 W Unexpected: 3 W Commissioning (hard + beam): 3 + 3 W Total: 58 W A.B. 16 February 2005 AB-RF-FB section meeting