VLBA Correlator Interfaces for VSOP-2

Slides:



Advertisements
Similar presentations
National Radio Astronomy Observatory June 13/14, 2005 EVLA Phase II Proposal Review EVLA Phase II Computing Development Bryan Butler (EVLA System Engineer.
Advertisements

The CVN Real Time Correlator Zhang Xiuzhong, Chen Zhong Shanghai Astronomical Observatory China 4th e-VLBI Workshop Sydney
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
上海天文台 Shanghai Astronomical Observatory e-VLBI Progress in China Zhang Xiuzhong, team of Chinese VLBI Network Shanghai Astronomical Observatory Chinese.
VLBA Sensitivity Upgrade Project Status Jon Romney NRAO, Socorro 7 th US VLBI Technical Coordination Meeting Haystack Observatory 2009 November 3–4.
From Privacy to Information Governance Dr Petra Wilson Internet Business Solutions Group - Cisco.
E 1 David Murphy 31-Oct-06/1-Nov-02 Agenda + U.S. VSOP-2 Support Plans.
N. RadziwillEVLA NSF Mid-Project Report May 11-12, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
Nov 3, 2009 RN - 1 Jet Propulsion Laboratory California Institute of Technology Current Developments for VLBI Data Acquisition Equipment at JPL Robert.
“From the Ground Up: Balancing the NSF Astronomy Program” Senior Review Major Recommendations November 2006 Implications for GSMT.
Strategic Vision for NRAO from the EVLA-II Proposal Review Exercise Bruce Balick, University of Washington Abstract: The NSF panel's review of the EVLA-II.
ASTRO-G project VSOP-2 – VLBI Space Observatory Programme times higher sensitivity. 10 times higher frequency observation 10 times higher resolution.
VLBA Implementation of the ROACH Digital Backend Jonathan Romney on behalf of the VLBA Upgrade development team NRAO / Socorro First International VLBI.
N. RadziwillEVLA Advisory Committee Meeting May 8-9, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
03/6/121 Using the VLBA for Spacecraft Navigation Jonathan Romney National Radio Astronomy Observatory VLBA 10 th Anniversary 2003 June 9 – 12.
2005/7/131 Plans and Options for e-VLBI on the VLBA Jon Romney NRAO, Socorro 4 th e-VLBI Workshop 2005 July 13.
Unit 19 Computer Music Systems 1 Examine the hardware options available for the composition and production of music using computer technology assess the.
VLBA Key Science: Making It Happen Bob Dickman AD for New Mexico Operations.
APT Visit Planner Review Chris O’Dea. The Gallant Crew v Chris O’Dea - Project Scientist v Jesse Doggett - Software Engineer/Coordinator v Tricia Royle.
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
10/31/2006VSOP-2 Tracking Station Meeting 1 Lessons Learned From VSOP-1 Larry R. D’Addario JPL.
Master Correlator Control Computer (MCCC) Requirements & Status Sonja Vrcic Socorro, December 12, 2007.
EVN Amplitude Calibration Iván Agudo. Quality of Calibration EVN Amplitude Calibration, Iván Agudo (JIVE) EVN TOG Meeting, Cagliari, Italy,
SA1: Production e-VLBI service Period 2 Overview Arpad Szomoru JIVE EXPReS is made possible through the support of the European Commission (DG-INFSO),
WIDAR Correlator Options and Potential Craig Walker NRAO Socorro U.S. VLBI Technical Coordination Meeting May 14-15, 2007.
NCI CBIIT LIMS ISIG Meeting– July 2007 NCI CBIIT LIMS Consortium Interface SIG Mission: focus on an overall goal of providing a library of interfaces/adapters.
NCI CBIIT LIMS ISIG Meeting– Aug. 21,2007 NCI CBIIT LIMS Consortium Interface SIG Mission: focus on an overall goal of providing a library of interfaces/adapters.
2007 / 5 / 141 VLBA Requirements, Plans & Status Jon Romney NRAO, Socorro Second US VLBI Technical Coordination Meeting Socorro 2007 / 5 / 14.
Navigation and Ancillary Information Facility NIF “Metadata” In SPICE Kernels Also known as “comments” October 2007.
Not Tested and Void Codes. Topics Introduction/Purpose User Roles When to Use Not Tested Codes How to Use Not Tested Codes When to Use Void Codes Multiple.
Future LBO Developments
SA1: overview, first results
Instrument Teams to SOC Test Specifications
Commercial Operations Sub-Committee Update to RMS
Hospital Management Software
Technical Operations and R&D at JIVE
Software Overview Sonja Vrcic
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Charles Acton NAIF Manager JPL July 18, 2007
Toward Best Practice for Language Resource Conversion
e-VLBI: Creating a Global Radio Telescope via High-Speed Networks
Credits: 3 CIE: 50 Marks SEE:100 Marks Lab: Embedded and IOT Lab
Mark 5 / VLBA Correlator Topics
Concepts for a Next-Generation VLBA
EVLA Availability - or - When Can I Use It?
Full Name(s) Advanced science teacher date
TechStambha PMP Certification Training
Active Data Management in Space 20m DG
VLA/VLBA INTEGRATION With appropriate outfitting, the VLA+NMA+VLBA could be one integrated instrument covering all resolutions from arcminutes to well.
L. Kogan (NRAO), S. Likhachev, I. Girin, & V. Ladigin (ASC)
WIS Discovery Metadata and why it is not WIGOS Metadata
Component 11/Unit 7 Implementing Clinical Decision Support
J D Romney, W F Brisken, S J Durand
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
VCI Overview Sonja Vrcic
Optimizing Efficiency + Funding
NRAO-GB Support for VSOP-2
MBI 630: Week 11 Interface Design
Backend System Requirements
Gustaaf van Moorsel September 9, 2003
Training Module Introduction to the TB9100/P25 CG/P25 TAG Customer Service Software (CSS) Describes Release 3.95 for Trunked TB9100 and P25 TAG Release.
An Introduction to Software Architecture
Test Coordinators Training (Required for DTCs & STCs)
EVLA Advisory Committee Meeting, March 19-20, 2009
Correlator Growth Path
Action Items Following these success of VSOP, science targets of VSOP-2 approach the central region of AGN. studies of accretion disks and jets in AGN.
North American ALMA Development Program
Ref: Connolly and Begg 6th ed., Chapter 10
<Your Team # > Your Team Name Here
Overview of Computer system
Presentation transcript:

VLBA Correlator Interfaces for VSOP-2 Mark 5 / VLBA Correlator Topics 2006/2/23 VLBA Correlator Interfaces for VSOP-2 Jon Romney NRAO, Socorro VSOP-2 Tracking Meeting Madrid / Yebes 2007/2/19-20 2007/2/19-20 J. D. Romney

Essential Initial Digressions The NSF Senior Review Panel convened by NSF Division of Astronomical Sciences. Report released 2006/11/3. Primary goal: “redistributing roughly $30M of annual spending” from existing facilities, to invest in new facilities. Primary recommendation on VLBA: “to seek assistance in operating the VLBA for a finite time from the international user community and, perhaps, also from NASA and the Japanese [ISAS] where there is a strong synergy with its missions.” 2007/2/19-20 – jdr VSOP-2 Tracking Meeting Madrid/Yebes

VSOP-2 Tracking Meeting Madrid/Yebes The NSF Senior Review NRAO Responses to SR Report Concentrate on delivering high-profile science, in areas consistent with NSF Astronomy’s mission. Seek non-NSF support for ~33% of $6M annual operational cost, at rate corresponding to ~$2k/hour. Relevant options for VSOP-2: NASA and/or ISAS. May require reducing scheduled observing time. Upgrade VLBA’s sensitivity to expand range of science it can address. 2007/2/19-20 – jdr VSOP-2 Tracking Meeting Madrid/Yebes

The VLBA Sensitivity Upgrade 22-GHz Receivers Replacement of LNAs. 4-Gbps Data Path Replacement of all equipment downstream from IFs. New wideband Sampler/Filter module. Compatible with VSOP-2 channelization. New wideband Recording system. Disk-based; compatible with existing Mark 5 module pool. New Correlator. WIDAR- or software-based. Planned upgrades to existing playback interface abandoned. 2007/2/19-20 – jdr VSOP-2 Tracking Meeting Madrid/Yebes

VLBA Correlator Interfaces Discussed Here in Context of New Correlator Existing correlator incompatible with VSOP-2 channelization; limited to 256 Mbps (for > 10 stations) without PBI upgrade. Observation Data (Input) 1- (2-,4-) Gbps data rate OK; subject to media pool constraints. Recorded on Mark-5-standard disk modules. Format TBD: Mark 5A, 5B, or (hopefully) more advanced wideband system. Prompt delivery requirements same (probably even more stringent) as for VSOP -- i.e., “Bologna Rules”. 2007/2/19-20 – jdr VSOP-2 Tracking Meeting Madrid/Yebes

VLBA Correlator Interfaces (Continued) Orbit Data Generally, same requirements as for VSOP. Accuracy specifications TBD, possibly depending on correlator. Format preferably same as JPL orbit kernels used for VSOP; could be changed for a different OD organization. Logs New correlator an opportunity to move to new log format. Hope to develop new global standard. Prompt delivery requirements same as for VSOP. 2007/2/19-20 – jdr VSOP-2 Tracking Meeting Madrid/Yebes

VLBA Correlator Interfaces (Continued) Time Correction Files Presumably also required for VSOP-2. No known reason to change VSOP format. GPS Offset Files Recommend merging into new Log format. Visibility Output Data TBD, as appropriate for post-correlation analysis system(s). 2007/2/19-20 – jdr VSOP-2 Tracking Meeting Madrid/Yebes

VSOP-2 Tracking Meeting Madrid/Yebes Thank you 2007/2/19-20 – jdr VSOP-2 Tracking Meeting Madrid/Yebes