Technical Stop #4 29th August - 2nd September 2011

Slides:



Advertisements
Similar presentations
MEF - Machines & Experimental Facilities Technical Stop #4 29 th August - 2 nd September 2011 Summary Julie Coupard Schedule and Coordination LHC-TS4 -
Advertisements

Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC.
Summary of Week 30 G. Arduini, J. Wenninger Main aims: “Adiabatically” increase peak luminosity by emittance reduction Luminosity production.
00:15: Stable beams fill 1883, 1.1E33 cm-2s-1.  Seems the 144 bunches beam 1 doe not fit properly on the injection kicker waveform. Systematically the.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Another typical LHC day. 06:15 Fill 2000 dumped 08:44 Stable beams – fill 2001  1.675e14  1.21e11  ~2 microns normalized emittance 11:34 Beams dump.
(Access system for HWC)
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Wednesday 3rd October - morning
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Laser Monitoring System On behalf of the Caltech group
Saturday :12 Stable beams fill 3351 Initial luminosity
The LHC - Status Is COLD Is almost fully commissioned
Julie Coupard Schedule and Coordination
Summary Friday h38: Ramp down and pre-cycle.
Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.
Powering from short circuit tests up to nominal
James Ridewood BE-OP-SPS
CNGS Proton Beam: Introduction
Thursday 09:30 VdM scan for CMS, standard ADT gain.
Summary of week 25 R. Assmann, J. Wenninger with the support of many !
Summary week 31 Week 31 G. Arduini & O. Brüning
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Thursday morning – optics correction
Barbara Holzer, Jorg Wenninger
Technical Stop #4 29th August - 2nd September 2011
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Thu 19/5 06: :00 Investigations from vacuum and cryogenics
Summary of Week 13 G. Arduini, B. Holzer
Summary of Week 16 G. Arduini, J. Wenninger
BLM planning 03/03/2014.
LHC Morning Meeting - G. Arduini
Week 35 – Technical Stop and Restart
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
Thursday :00: Physics fill from the night shift
Finally.... We had to wait a long time.... We had many problems....
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Wednesday Ramp single nominal bunches for loss maps
Thursday Physics fill 1250 (with 13b) dumped at 10.30
LS1 status 17/03/2014.
Monday 14:00 beam dump Access:
LHC Morning Meeting - G. Arduini
Thursday Fill 1364 (24 bunch) dumped at 07h
1v1.
Friday 25 bunch fill dumped just before (BLM in 5)
Saturday 3rd November - morning
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Cold compressor speed S45
MPS commissioning at ESS
Technical Stop #4 29th August - 2nd September 2011
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC - Week 38 Technical stop: Katy Foraz
Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Thursday
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
Weekend Summary Friday Saturday Sunday C. Gemme, INFN Genova,
Friday 15th February - morning
Thursday 20th July - morning
Monday 27th August & night
Review of hardware commissioning
Thursday 10:00 Fill 1986 in stable beams.
Daniel, Gianluca and Belen (for the Collimator team)
SPS Injection BIS - Draft requirements
Presentation transcript:

Technical Stop #4 29th August - 2nd September 2011 Day 4 Julie Coupard Schedule and Coordination LHC-TS4 - 02/09/2011 J.Coupard

Summary after Day 3 Cryogenics Cabling Beam Instrumentation Kickers Done Intervention on oil pipes @Pt6 on surface Cabling Done BLM @Pt3 Done NG18 replacement @Pt3 Done Thermo-switch @Pt1&2 Done Monitoring cryo @Pt4 Beam Instrumentation Done BLM: Direct beam dump connection to dump system ?? BPM: New firmware and SW to increase IIR filter order Kickers Done Change of generator pos K @Pt6 – revalidation tests ongoing Done Change of generator HV switch @Pt2 – revalidation tests ongoing Machine Protection Done Adjustment of 600 A Energy Extraction Switches DQEMC.UA63.RQTD.A56B1 – test performed - OK DQEMC.UA43.RCS.A34B1 – test performed - OK LHC-TS4 - 02/09/2011 J.Coupard

Issue Powering Test CRYO See with the EIC Stop of the Compressor @Pt8 THU afternoon Powering Test See with the EIC LHC-TS4 - 02/09/2011 J.Coupard

Status of patrol Pt1 Friday 17h LHC-TS4 - 02/09/2011 J.Coupard

Program for Friday Deconsignation of injection lines (Ti2, Ti8) on Friday afternoon Steve Hutchins will take the SPS keys for LHC extraction so the LHC will remain safe during the Patrols on Friday evening Pt3 and P7 CLOSED for 15:00 All LHC machine CLOSED for 16:00 Last patrols at 17h (earlier if possible) Point 1 End of the Technical Stop around 18h30 (if no more patrols) People in CCC to give the green light for beam : S.Hutchins EIC : L.Ponce LHC-TS4 - 02/09/2011 J.Coupard