Jakub Jícha Dušan Špelina

Slides:



Advertisements
Similar presentations
Enabling Secure Internet Access with ISA Server
Advertisements

Tivoli Service Request Manager
SWE Day- Ahead market coupling 7 April 2014 Implementation Group meeting – Paris.
Environmental Council of States Network Authentication and Authorization Services The Shared Security Component February 28, 2005.
Apr 2, 2002Mårten Trolin1 Previous lecture On the assignment Certificates and key management –Obtaining a certificate –Verifying a certificate –Certificate.
Integration of Applications MIS3502: Application Integration and Evaluation Paul Weinberg Adapted from material by Arnold Kurtz, David.
Asper School of Business University of Manitoba Systems Analysis & Design Instructor: Bob Travica System interfaces Updated: November 2014.
SE Document Document Control Software. SE Document SE Document is a Document Management Software System to help you meet all document control requirements.
ASPEC Internal Auditor Training Version
Quality Representative Training Version
Purpose Intended Audience and Presenter Contents Proposed Presentation Length Intended audience is all distributor partners and VARs Content may be customized.
1 Resident Management System – Quality Control System Introduction Version 2.38 May 2010.
Production Planning Processes EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2012.
E-Trace the Auction Portal Warsaw, 12 January 2005 co-ordinated.
Role of Account Management at ERCOT Market Participant Identity Management Overview (MPIM)
STIMULATING INNOVATION IN THE FOOD SUPPLY-CHAIN THROUGH SMART USE OF ICT: ASSISTING SMES PARTICIPATE IN DIGITAL SUPPLY CHAINS IN THE SINGLE MARKET WP3.
Module 14: WCF Send Adapters. Overview Lesson 1: Introduction to WCF Send Adapters Lesson 2: Consuming a Web Service Lesson 3: Consuming Services from.
Production Planning Processes EGN 5620 Enterprise Systems Configuration Spring, 2014.
Microsoft ® Business Solutions–Navision ® 4.0 Development II - C/SIDE Solution Development Day 5.
Electronic data collection system eSTAT in Statistics Estonia: functionality, authentication and further developments issues 4th June 2007 Maia Ennok,
Second Generation Electronic Filing Specifications Legal XML Court Filing Committee April 26, 2004.
ESafe Open Modules Overview Open modules implementing the eSafe document exchange protocol.
A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010.
Microsoft Dynamics ® NAV 2009 Service Management.
3 Copyright © 2010, Oracle. All rights reserved. Product Data Hub: PIM Functional Training Program Setup Workbench Fundamentals.
Copyright © 2007, Oracle. All rights reserved. Managing Items and Item Catalogs.
Cornell Information Technologies Information Systems/Data Delivery ACTUATE RETIREMENT PROJECT ASPC UPDATE 12/7/06 Objectives Primary - Retire Actuate Reduce.
Seminar in “ICT Service Oriented Architectures” April 28 th 2009 Marino Di Nillo Advanced Interoperabilty Unit at the Italian National Agency for Digital.
Apr 1, 2003Mårten Trolin1 Previous lecture Certificates and key management Non-interactive protocols –PGP SSL/TLS –Introduction –Phases –Commands.
ESRIN, 15 July 2009 Slide 1 Web Service Security support in the SSE Toolbox HMA-T Phase 2 FP 14 December 2009 S. Gianfranceschi, Intecs.
Architecture Review 10/11/2004
Veritas Ordering Systems
Training for developers of X-Road interfaces
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Supported by: PCR Status report AESAG, September
Sabri Kızanlık Ural Emekçi
WEB SERVICES From Chapter 19 of Distributed Systems Concepts and Design,4th Edition, By G. Coulouris, J. Dollimore and T. Kindberg Published by Addison.
VIEWS II: Motivation and Plans for a Revised Validation Service
RLGS Status / LCC B. Pätz, DLR/MUSC.
Concept of ACSF TAN (Type Approval Number)
ESB Networks AIP Programme
Metadata Editor Introduction
Publishing and Maintaining a Website
Public Key Infrastructure (PKI)
POC Procedures Working Group (POC-PWG) Work package 3 (As Built)
Maintenance module Martin Heigl CTO
Supported by: PCR Status report AESAG, September
Active Orders Supplier Administrator Training Getting Started Activities This training presentation describes the Getting Started activities that will.
11/11/2018 Desktop Virtualization Corey Hynes Kyle Rosenthal President Technical Lead HynesITe Inc Spider Consulting @windowspcguy.
The state of implementation of CIM in MAVIR
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Digits-2-Digits.
07 Master Data – Tools
Electronic Manifesting (e-Manifest)
Order-to-Cash (Project-Based Services) Scenario Overview
Configuring Internet-related services
Training for developers of X-Road interfaces
Microsoft Virtual Academy
ITU-R Liaison Group Report - Session #62 Opening Plenary
Tomáš Urych, ESO9 international a.s.
An Introduction to Software Architecture
Order-to-Cash (Project-Based Services) Scenario Overview
Business Process Management
Microsoft Virtual Academy
WEB SERVICES From Chapter 19, Distributed Systems
Progress report of GRSG informal group
Grants Management Solution Suite (GMSS)
IDABC e-Invoicing – e-Ordering > Pilot of e-PRIOR Meeting with Suppliers IDABC stands for Interoperable Delivery of European eGovernment Services to public.
Speaker’s Name, SAP Month 00, 2017
Supplier EDI On-boarding Overview
Presentation transcript:

Jakub Jícha Dušan Špelina Upgrade CS OTE Jakub Jícha Dušan Špelina 16. Januar 2019 | Title of Presentation

Agenda 1 Planned change in external interface of CS OTE 2 Testing and parael run 16.1.2019 Upgrade CS OTE 16. Januar 2019 | Title of Presentation

Interface of CS OTE Access to CS OTE via Formats of messages Web services - HTTPS/SOAP SMTP (email) Formats of messages XML according to std. OTE XML according to std. ETSO EDI according to std. OTE (based on EDINE) 16.1.2019 Upgrade CS OTE 16. Januar 2019 | Title of Presentation

Web services interface New specification of web services Synchronious communication via SOAP protocol ver. 1.1, type SOAP-Document Used for structured data (XML) exchange Synchronious communication via SOAP protocol ver. 1.1, simplified version Used for EDI message trasfer in mode client/server only Ways of communication client-server – initialization is from clients side. Client systém have to support web services according defined standard. server-server – inicialization from both sides. Clients systém must have accessible web services according to OTE std. This way is possible to use only for SOAP-Document type of comm. 16.1.2019 Upgrade CS OTE 16. Januar 2019 | Title of Presentation

Nová struktura SOAP SOAP-Document Header WS (SOAP:Header) Message Body XML signature XML structure according to concreate specification of message SOAP – simplified version for EDI transfer Header WS – not used Body – 1 parameter (element) DATA, that have to contain digitally singned message in form PKCS#7 with encryption base64. 16.1.2019 Upgrade CS OTE 16. Januar 2019 | Title of Presentation

XML messages formats – changes in Upgrade CS OTE Formats XML according to OTE standard Extension of MASTERDATA structure, new comm. scenarios assignment / change – subject of settlement (individually or within the supplier change process) assignment / change the role of observer at OPM Electronical assignment of repsponsibility for imbalance Finished support for registration of bilateral contracts (replaced by evidence of realization diagrams according to std. ETSO) Support for communication merged markets ČR/SR New indetification EIC (not relevant for market participants) Data exchange between coordinators of short-term markets and TSO New comm. scenarios For market participants – Information about market coupling capacity (MCC)(ETSO ECAN.CapacityDocument / ESR.StatusRequest / EAD.AcknowledgementDocument ) SFVOT reports modification 16.1.2019 Upgrade CS OTE 16. Januar 2019 | Title of Presentation

XML formats – changes in Upgrade CS OTE XML messages according to ETSO For communication in area of „registration of realization diagrams “ are used standard XML messages according to ETSO specification: ETSO Scheduling System (ESS) V3R1 ETSO Acknoledgement Process V5R0 ETSO Status Request V1R1 For communication between OTE – ČEPS and SEPS in area of market couplingare used XML messages according to following ETSO standards: ETSO Scheduling system ESS – Version 3 Release 1 ETSO Capacity Allocation and Nomination ECAN – Version 4 Release 0 ETSO Acknowledgement Document EAD – Version 5 Release 0 ETSO formats will be implemented in exact format that is published at ETSO web site http://www.entsoe.eu/ 16.1.2019 Upgrade CS OTE 16. Januar 2019 | Title of Presentation

EDI messages – changes in Upgrade CS OTE External interface of automatic communication will support EDI (std EDINE with statutory requirements adjustments) for following processes: Communication in area of measured data For input in format MSCONS For confirmation in format APERAK Communication in area of additional invoicing data for distributors VO (DUF VO) A scope and form of messages will not differ from current implementation. Support of other EDI messages will be closed. 16.1.2019 Upgrade CS OTE 16. Januar 2019 | Title of Presentation

Documentation Documentation is available in draft version 1.0. During implementation can be changed in case of new demands. OTE will inform all market participants. Dokument Popis D1.4.1_Formaty_EDI_V1_0 EDI messages D1.4.2_Formaty_XML_V1_0 XML messages including XSD templates D1.4.3_Rozhrani_web_sluzeb_V1_0 Description of web services D1.4.4_Rozhrani_automaticke_komunikace_IS_OTE_V1_0 IS OTE interface –XML formats for trading, realization diagrams, settlement results (updated current documentation) Specifikace formátů ETSO http://www.entsoe.eu/resources/edi/ XML messages according to ETSO. 16.1.2019 Upgrade CS OTE 16. Januar 2019 | Title of Presentation

Agenda 1 Change in interfaces of CS OTE 2 Testing and parael run 16.1.2019 Upgrade CS OTE 16. Januar 2019 | Title of Presentation

Testing Complex testing KV1 In test enviroment with simulated interface with each type of interface, basic functionality tests OTE and Logica KV2 In test enviroment with 2-3 ext. Subjects – interfaces test incl. Test of comm. Abilities of CS OTE (benchmark) KV3 In test enviroment with connected key market participants (all distributors incl. Local ones, TSO, one selected local distributor and 3 traders with electricity) incl. Basic functionalities test (web interface) of Ugraded CS OTE. 16.1.2019 Upgrade CS OTE 16. Januar 2019 | Title of Presentation

Parael run current and upgraded CS OTE Primary system – current system CS OTE that is operated in production till the end of year 2009. Secondary system for evaluation – upgraded system Purpose of parael run It is ment for evaluation and adaptation of upgraded system by market participants. An optional comparison of results and outputs from upgrade CS OTE 16.1.2019 Upgrade CS OTE 16. Januar 2019 | Title of Presentation

Phases of parael run I. Phase – data processing check (parael data input to both enviroments) The purpose is evaluation and comparison of modules that have not been modified in scope of upgrade or modules that were modified during a year 2009 in both enviroments. This phase will affect mostly Center of Data Services (processing of measured data, aggregations, reallocation and outputs for subjects of settlement that are input for settlement of imbalance process.) Cooperation of OTE and Logica II. Phase – evaluation of external interfaces and new features of upgraded systém with market participants The aim is to evaluate whether all market participants are all set to go-live (productive run) from 1.1.2010. Above all in those areas: Modification of external interfaces Evaluation of market participants readiness to all amended functionalities and features even possible changes of their processes & systems. III. Phase – complex operation examination (simulation of production run) The main target of this phase is complex evaluation of all activities during a trading day (or days) that will include collection of data, their processing and settlement. 16.1.2019 Upgrade CS OTE 16. Januar 2019 | Title of Presentation

Parael run – Phase II. – evaluation of external interfaces and new features CS OTE enviroment will be created as an copy of productive system to date 31.10.2009 Market participants Setup of all interfaces (with cooperation of OTE/Logica) Test of used communication scenarios Recommended for all market participants 16.1.2019 Upgrade CS OTE 16. Januar 2019 | Title of Presentation

Parael run - Phase III. Complex evaluation Evaluation of all processes in one trading day Introduction of all new interfaces (web + automatical communication) Participants Simulation of complex operations Trading (all markets), registration of diagrams, supplier change process, measured data … Open for all market participants (the more contributors the better evaluation) 16.1.2019 Upgrade CS OTE 16. Januar 2019 | Title of Presentation

Access items for the parael run To establish an encrypted channel for automatic communication during KV2 and KV3 phases we offer following variants of certificates: SW certificates that will be valid after parael run and will be used for testing/training enviroment – they’ll be handed out free of charge. Be warned that sw certificate has possible security breach of copying this access item and with the knowledge of a password it can grant the access to historical data stored within the testing / training system. HW certificates that will be used for testing / training after period of parael run – those certificates will be issued on standard commerce terms either from OTECA or I. Certification authority. Usage of currently issued testing certificates – some of participants have HW certificates for testing purposes today. Those certificates can be used during testing phases KV2 and KV3 and all parael run. 16.1.2019 Upgrade CS OTE 16. Januar 2019 | Title of Presentation

Extract from Project schedule 16.1.2019 Upgrade CS OTE 16. Januar 2019 | Title of Presentation

Thank you for your attention 16.1.2019 Upgrade CS OTE 16. Januar 2019 | Title of Presentation