Wildland Progressive Hose Packs

Slides:



Advertisements
Similar presentations
RP-500 ½- 1. Modification Overview Production of the RP500 began in 2007 and is current. Production of the RP500 began in 2007 and is current.
Advertisements

Internal or External frame Backpacks. Use cloth tape measure when measuring.
Lunch Table Set-up Roll the table into position Be sure you have clearance on both sides.
Core Strength Exercises
Adjustable Head Strap Instructions Step 1: To adjust the head strap hold goggle as above.
Wildland Progressive Hose Packs The Original made NEW !
FIREFIGHTER I LESSON 12A. FIRE HOSE TERMS Expansion-ring gasket Expansion-ring gasket — Gasket used at the end of hose where it is expanded into coupling.
Gate Latch The hook is inserted into the eye screw to latch.
HILT Elements © 2013 HILT – Human Injury-Limiting Tool, LLC
The Cleveland Load.
Loading the SAC-METRO pack. Coil the hose with the male coupling to the inside. Using a winding table or a Gnass Hose Winder to simplify this operation.
Place nozzle on hose and fold over about 4 to 6 inches past each end of pack. High-rise Pack Loading.
Ropes and Knots Skill Drills.
Getting Wet Stuff to the Red Stuff For 300 Years
Evacuating a Casualty using a SKED. SKED Litter Compact Lightweight Strong.
Pulling working lines. Step up onto the tailboard. Step up onto the tailboard.
Structures Packaging – Forms of Loading. Tension A force that pulls on a structure trying to make it longer. Example – hold the hand of another person,
Knots, Harnesses, Belaying and the 6 point Check
The JTC Claw Sling Kit, Assembly Sling Kit includes: One “Quick Release” Sling 2 – 4” adhesive backed Velcro “Loop Tape” 2 – 7” Double Sided Velcro straps.
Roller Shades & Panels G & V Window Fashions, Inc th Street, Long Island City, NY Phone: Fax:
BACKPACKING BASICS BY SARA HART. 1.Choose your pack 2.Pack your pack 3.Put on your pack TODAY, YOU WILL LEARN HOW TO:
Job Performance Requirement Modified Gasner Bar Pack.
Part C  Accordion load  Lay the first length of hose in the bed on edge against the partition with the coupling at the rear of the bed  At the front.
Dean Salmon  Mid-shaft fractures of the Femur  Used in the emergency department to support the fracture and allow for easier mobilisation.
Ropes and Knots Skill Drills.
A AN NIGHT VISION DEVICES
HOSE ROLLS Straight roll ◦Lay the hose out straight and flat on a clean surface ◦Roll the male coupling over onto the hose to start the roll ◦Form a coil.
First you need to load ‘legal’ size paper in your printer. Then select the handout you want and double click it. This should open the file in Power Point.
Grapple Housing Top Sub Grapple Collet Seal Housing Bottom Sub Seal Housing Metal Seal Ring.
Job Performance Requirement Horseshoe Load.
CPS MILITARY SOLO SYSTEM DONNING AND ADJUSTING. TLO Given a CPS Military Solo System and combat equipment prepare the CPS Military Solo System for parachuting.
Procedure for Rescuing a Casualty from a Duct Revision 0 – 18 th October 2011 Toolbox Talk.
Coil-pack assembly procedure Paolo Ferracin LQS01 readiness review #3 Assembly LBNL July 28, 2009.
1 © 2013 HILT – Human Injury- Limiting Tool, LLC.
Technical Standards Branch Class B Bridge Inspection Course BIM Bridge Inspection and Maintenance Basic Structural Considerations INFRASTRUCTURE AND TRANSPORTATION.
WATER DROPS AND PENNIES How many can it hold?. HYPOTHESIS I think there is a sponge in the black box that absorbs water, and when it is full it releases.
Setting up PLCE webbing
Copyright © 2016 by The S.E.A. Group
Introduction Bridge members must be able to carry the loads applied to them. This presentation considers: how loads are applied to members how bridge.
Apache FR Class II Harness
Structural Considerations for Trusses
Two Person Low Shoulder Raise and Carry
Survival Bracelet.
Coil Vessel Project.
Stryker Glide Log roll patient to position slide under the patient with their head on the head picture Position hose in the bottom opening of the glide.
Kendrick Extrication Device (KED)
PPE Donning and Doffing
How To Saddle Western By: Phoenix.
Knots.
Example Standard Work Sheets Paper Drinking Cup
Plant Pigment Chromatography Visual Instructions
Assembly instructions for M-K all bolt together hoppercone kit.
Equipment Familiarization
Ford F Series Air Box Modification
Harwich Fire Department
Job Performance Requirement 10-19
High-rise Pack Loading
Job Performance Requirement 7-4
Fire Hose, Nozzles, Streams, and Foam
2. Engage trained observer 3. Disinfect outer gloves
HOW TO MAKE A FROEBEL STAR
Job Performance Requirement 10-15
Winching Safety.
PPE Donning and Doffing
Loading the SAC-METRO pack
АВЛИГАТАЙ ТЭМЦЭХ ҮНДЭСНИЙ ХӨТӨЛБӨР /танилцуулга/
Job Performance Requirement 10-9
Job Performance Requirement 10-33
4 shelf shoe rack assembly instructions
basic scout knots 2019 Chief Seattle PTC October 19, 2019
Presentation transcript:

Wildland Progressive Hose Packs The Original made NEW !

Wildland Progressive Versa-Packs™ Holds each bundle of hose independently with highly visible color coded straps. Each strap has buckles that release easily with a gloved hand. The hose can be carried in a double-donut, folded horseshoe, or Cleveland-Gasner style load.

Loading the Versa-Packs™ Pull sides up into place, with straps 90 degrees to pack. Lay pack out and place hose into pack.

Loading the Versa-Packs™ When tightening the lower straps, Cordura® may need to be pulled out of the way to keep from locking the buckle. The straps slide through the pack sides so make sure all the slack is taken up.

Compressing with your knee can make the pack tighten up easier.

The Wildland Progressive Versa-Pack™ 2000 series will hold rolls of various sizes or hose coils. For rolls, slide Cordura® in at top and out at bottom. Buckle opposite top strap to opposite bottom.

Wildland Progressive Versa-Packs™ 2000 series WP2215vp 2x 1.5” or 1x 1.5” + 1x 1.0” WP2310vp 3x 1.0” WP2315vp 3x 1.5” or 1x 1.0” + 2x 1.5”

Wildland Progressive Versa-Packs™ 1000 series. WP1215vp 2x 1.5” or 1x 1.5” + 1x 1.0” WP1310vp 3x 1.0” WP1315vp 3x 1.5” or 1x 1.0” + 2x 1.5”