CONTRACTOR MANAGEMENT AT XSTRATA COAL

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

Engineering in business and the environment Lesson 6: Health and safety legislation.
Site Safety Plans PFN ME 35B.
Emergency Preparedness and Response
© Business Review - Arabian Peninsula January 24, 2010 / Slide 1 ABB Contractors Business Partners John Hartnett May, 2010.
Contractor Coordination. Agenda Training Objectives Definitions Law and Regulatory Requirements Responsibilities Implementation Scenarios.
Contractor Safety Management
Explosives and security risk substances on mine sites – roles and responsibilities current as of December
Safe Learner Induction Stage 1 (complete) Harry Wheatcroft Safety Advisor.
Abbreviations COP Code of Practise FOP
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Developing a Chemical Risk Management Program
OHSAS 18001: Occupational health and safety management systems - Specification Karen Lawrence.
WHS Management Plans.
BUILD WITH US. ™ Contractors
Health & Safety Risk Assessments.
Risk Assessment – An Essential Standard
Occupational Health & Safety Management at IREL Units A.K.DAS G.M. (Safety & Env.) Corporate Office, Mumbai.
Authorization and Inspection of Cyclotron Facilities Inspections.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
K RIEL C OLLIERY Anglo Coal Contractor Management.
NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za.
Main contractor name – LTI# - Date of incident 1 Non Accidental Death Name of Company Date of Incident 1.
CONTRACTOR MANAGEMENT AT XSTRATA COAL. INDEX Location of sites Employees vs. Contractors Contractor selection phase Pre-engagement operational phase Engagement.
© University of Reading Dec 2009 Health and Safety Induction For Works Involving UoR Water Systems University of Reading.
Hazards Identification and Risk Assessment
Safety Stand Down – Together We Will Make the Difference.
Two of the most important pieces of the health and safety legislation affecting educational establishments across the UK are the Health and Safety at.
Critical Equipment Inspections Xstrata Coal South Africa.
Agenda  Safety Management in Roads Service  A review of the roles within CDM  What are the construction regulations?  What's in a H&S plan?  CDM and.
MINING FOR THE NATION CONTRACTOR MANAGEMENT. MINING FOR THE NATION MATLA COLLIERY NEW CLYDESDALE COLLIERY ARNOT COLLIERY GLISA COLLIERY.
13/01/2015 ANKERLIG & GOURIKWA POWER STATION STATION OCGT Tender Presented by Obert Mgwenya.
OHSAS Occupational health and safety management system.
1 SHE Requirements Presented by : Diane Maunatlala SS: COHS.
SHEQ presentation Date 9 July SCOPE This applies to all contractors acquiring to conduct meter reading, disconnecting and reconnection work throughout.
Understanding Workwell Workplace Health & Safety Audit Human Resource Services March 29 th, 2007 Presented by: Chris Hurley - EOHSS.
POWER DELIVERY PROJECTS Central Grids Simmerpan - Civil works. 10 July 2015 Vusi Mthimunye.
Step 1 in the evaluation process No Returnable Document/ Schedule File AFile BFile C Basic Compliance Tenderer’s tick box √ All mandatory requirements.
SHE Requirements Clarification Meeting Date:17 November 2014 Compiled: Nompumelelo Kaule.
GROUP CAPITAL DIVISION Majuba Rail Project Clarification Meeting Boreholes Health and Safety Insert image here Lebo Ramoleko Date: 05 May 2016 Time: 10h00.
Construction Site Induction A guide to “HOW TO” “HOW TO” by Coldrop.

We always have time to work safely
Hospital Emergency Response Training—Home Training
Hazard Identification and Control
Occupational Radiation Protection during High Exposure Operations
Health and safety organization on construction site
Non-accidental death Definition
Contractor Control system
Critical Equipment Inspections
Contractor Control system
General Contract Management Structure
RISK ASSESSMENT AND METHOD STATEMENT
Sasol Mining: Contractor Management 16 Feb 2005
CONTRACTOR MANAGEMENT WORKSHOP 16 February 2005
CONTRACTOR MANAGEMENT WORKSHOP 16 February 2005
CONTRACTOR MANAGEMENT WORKSHOP 16 February 2005
Contractor Control system
Prevention through planning, control and monitoring Harold Chinogurei
General Contract Management Structure
Onsite Control of Visitors & Contractors
General Contract Management Structure
Non-accidental death Definition
PUAN SITI NUR AISHAH MOHD NOOR
Effective Construction Safety Management
CONTRACTOR MANAGEMENT WORKSHOP 16 February 2005
M-Learning 4 Those Who Care
Aerodrome Certification Workshop
Risk Management NDS Forum June 23rd 2010.
Presentation transcript:

CONTRACTOR MANAGEMENT AT XSTRATA COAL

INDEX Location of sites Employees vs. Contractors Contractor selection phase Pre-engagement operational phase Engagement operational phase Post engagement / project completion phase Completion stage Common problems experienced Future initiatives

Location of sites Middelburg Witbank Ogies Waterpan Boschmans Witcons South Witbank Goedgevonden Tweefontein Division Middelburg Witbank Phoenix Tavistock ATC ATCOM iMpunzi Division Ogies Mpumalanga Division Tselentis Spitzkop DTJV - Middelburg DTJV - Douglas Rietspruit

Employees vs. Contractors Mine Tons/mth No. empl No. Contr % of Workforce Arthur Taylor 164000 537 138 20 ATCOM 176000 363 79 18 Boschmans 280000 568 282 33 Goedgevonden 60000 5 173 97 Phoenix 84700 430 83 16 South Witbank 342 297 44 Spitzkop 433 221 34 Tavistock 177500 492 295 38 Tselentis 115000 92 737 89 Waterpan 110000 141 437 76 Witcons 190000 394

Employees vs. Contractors Strength Injuries Contractors contribute to 31% of the total number of injuries

Management Of Contractors CONTRACTOR SELECTION PHASE CONTRACTOR SELECTION PHASE PRE-ENGADGEMENT OPERATIONAL PHASE OPERATIONAL PHASE The company Preparation Completion of all documentation Including contract, indemnities, returns, etc Attendance at HS and Operational Meetings Evaluation criteria Over inspection / Monitoring / Auditing Tender Assessment in accordance with Company Procedure Completion of pre-emptive risk identification and assessment Assessment and response to pre-emptive risk identification and assessment by the company. POST-ENGADGEMENT OPERATIONAL PHASE Selection / Rejection Review contractual performance / delivery of services Induction / Training Medical Examination (certificate of fitness and medical surveillance) Review compliance with obligations

Contractor Selection Phase Need for contractor employment identified Scope of work defined Evaluation criteria Tender assessment – company procedure Company actions Selection

Pre-engagement / Operational Phase Documentation, i.e. contract, indemnities, appointments, etc Pre-emptive risk identification & assessment Response to risk identification & assessment Induction training Medical examination (C.O.F. & medical surveillance)

Engagement / Operational Phase Monitoring performance, i.e.: H&S Meetings Risk management programme Occupational hygiene controls monitored Incident / injury reports Daily, weekly, monthly returns submitted First aid programme Induction Medical surveillance Health & safety training programme

Engagement / Operational Phase Issue & control of PPE Equipment inventory Logbooks, registers, appointments Fire drills Emergency preparedness / escape routes Vehicle / equipment pre-use checks Planned task observations H & S Audits Hazardous substances Maintenance management

Engagement / Operational Phase OEM training / authorisation procedure Approval of deviations / modifications to equipment Approval – temporary workers Approval – contract variation orders Non-compliances Special precautions for hazardous work

Post-Engagement / Project Completion Phase Review of contractual performance Delivery of service Quality assurance Review of compliance with obligations Cold commissioning of system Hot commissioning of system Warranty and maintenance period confirmed Contractor documentation Security cards returned

Post-Engagement / Project Completion Phase Exit medical examinations Equipment removal Site area cleared, clean & safe Acceptance of ownership

Common Problems experience Limitation on the number of specialist contractors in the market Time restraints in selection and appointment process Quality of contractors supervisors and employees Record keeping on the movement of contractors employees between mines Desertion of contractors employee without completing exit medical examinations

Future initiatives Preferred contactors list Electronic data base with program to generate tender documents