PLAN PREPARATION BASICS GENERAL LAYOUT

Slides:



Advertisements
Similar presentations
FEDERAL AID PLAN DEVELOPMENT
Advertisements

Cost Estimation System Tool
Office of Traffic, Safety and Technology Chapter 7 Signing Plan Sets Traffic Signs 101 November 20, 2014.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
MnDOT Sample Plan - Jerry Kotzenmacher MnDOT
CAD Standards Presented by Gary Holeman PE Senior Design and Automation Engineer Roadway Engineering unit
CE303: Introduction to Construction Blueprint Lab.
Office of Traffic, Safety and Technology Module 5 Work Zone Plan Sets Module 5 Work Zone Plan Sets Traffic Control Plan Development Course.
IRWA Educational Mini Conference IRWA Educational Mini Conference Chapter 26 Presenter: Richard Diaz, Jr. P.E. September 16-17, 2010  Reading Right-of-Way.
Creating a Layout sheet. Sketching  Key Terms & Definitions  Mechanical Drafting: Drawings are created using mechanical instruments. Layout Sheet: consists.
CE303: Introduction to Construction Blueprint Lab.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
Plan Scales (see DOT 1B-3) 22”x34” paper for final designs (preliminary usually ½ size, 11”x17”) 1. Plan view: a) Rural a) 1:1000 plan scale (or 1”=100’)
 SIGN, SIGNALS, & ROADWAY MARKINGS Do Now - Create a list with as many different road signs you are able to think of. What does each sign tell you? Classify.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
North Carolina General Statute May 2009 Gary Thompson, PLS work
Lesson Plan For Day Two Power point presentation 30 min Video– AAA- signs, signals, etc. 20 min Quiz- Signs Etc 10 min Correct 10 min H/O- Signs 10 min.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
Road Signs Recognition Quiz Each sign will appear for 3 seconds…
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Using ArcGIS Layout View
Chapter 3 Regulatory, Warning & Guide Signs Overview
How to Sign A Trail Accurately
UNIT 3 Foundations of Effective Driving
2nd Street Drainage and Paving Improvements
Chapter 3 Regulatory, Warning & Guide Signs Overview
The Alabama Transportation Rehabilitation and Improvement Program
Drive Right Chapter 2 Unit 1
Interdisciplinary teams Existing or new roadway
Signs, Signals, and Roadway Markings
Chapter 7 Negotiating Intersections
Revisions to Part 7 – Traffic Control for School Areas
CONSTRUCTION MASTERS BONUS BONUS
Chapter 3 Regulatory, Warning & Guide Signs Overview
CHAPTER 3 Signs, Signals, and Pavement Markings
Architectural Drafting
Traffic Control Plan Development Course
FUE - Future University in Egypt Faculty of Engineering and Technology Department of Architectural Engineering ARC472 - Execution Design (2) Spring 2017.
IVG Driver Training Navigation Services.
Unit 2: Signs, Signals, and Roadway Markings
Chapter 7 Signing Plan Sets
Local Bridge Hydraulics 101 Planning & Funding Considerations
Introduction to MICROSCOPES & BIOLOGICAL DRAWINGS
MAPS Basic Components.
CH 42 & TH 13 Construction Update
Minnesota Driver’s Manual – Chapter 3
Site Plan Requirements
SIGNS, SIGNALS, and MARKINGS
Ancillary data ‘subordinate’ = Information required to explain the display contents.
Signs, Signals, and Road Markings
Amer Gov Notebook Set Up
MAPS Basic Components.
Introduction Persons engaged in surveying are often called to determine volumes of various types of material. The most common unit of volume is cubic having.
PLAN PREPARATION BASICS STATEMENT OF ESTIMATED QUANTITIES (SEQ)
How To Be A More Perceptive Driver
Introduction Persons engaged in surveying are often called to determine volumes of various types of material. The most common unit of volume is cubic having.
Road Sign Bingo- Bell Ringer
Introduction Persons engaged in surveying are often called to determine volumes of various types of material. The most common unit of volume is cubic having.
Signs and Markings Pop Quiz
Introduction Persons engaged in surveying are often called to determine volumes of various types of material. The most common unit of volume is cubic having.
lesson 2.2 TRAFFIC SIGNALS
Writing a formal letter
Drive Right chapter 2 Thursday, June 27, 2019 lesson 2.1 TRAFFIC SIGNS
Example of cones and signs as traffic control at a roadway incident.
Rules of the Road Chapter 10
State Aid Project Plan Preparation
Chapter 2 Signs, Signals, and Roadway Markings
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
ACEC Designer Training
Presentation transcript:

PLAN PREPARATION BASICS GENERAL LAYOUT Project Design Services Unit December 2018 http://ihub/projectdelivery/design/index.html

GENERAL LAYOUT In this section you will be introduced to the basic parts of the general layout sheets. These typically follow the title sheet but are before the Statement of Estimated Quantities sheet(s). Simpler, more straight forward projects may not need a general layout section in the plan. PPB-GENERAL LAYOUT 2018-12 http://ihub/projectdelivery/design/index.html

PROJECT NUMBER(S) The project number(s) should be shown in the bottom right corner of the plan sheet. It should include the (TH #) but not the legislative number. When there are multiple project numbers as a minimum the PRIME SP number should be shown. It is optional to show all of the SP numbers. The main thing it to be consistent. ALL State Aid project numbers must also be shown on every sheet in the bottom right corner. PPB-GENERAL LAYOUT 2018-12 http://ihub/projectdelivery/design/index.html

Some designers like to label the sheet sequence. SHEET LABEL The sheet label should be shown in the bottom right corner of the plan sheet. Above the SP # and SHEET number. Some designers like to label the sheet sequence. (e.g. Sheet 1 of 3). This is optional. PPB-GENERAL LAYOUT 2018-12 http://ihub/projectdelivery/design/index.html

SHEET SIGNATURE Each general layout sheet must be signed. This is typically located in the bottom center of the sheet just left of the SP #. This will include the Design Engineers (same person who signed the plan title sheet). It will include…. Printed name Signature License Number Date PPB-GENERAL LAYOUT 2018-12 http://ihub/projectdelivery/design/index.html

SHEET SIGNATURE (Continued) A different signature block will be used if these are signed by an Engineer different than the one who signed the title sheet. This will require the Board of AELSLAGID signature language. PPB-GENERAL LAYOUT 2018-12 http://ihub/projectdelivery/design/index.html

SHEET NUMBER The sheet number is shown in the bottom right corner of the plan sheet. PPB-GENERAL LAYOUT 2018-12 http://ihub/projectdelivery/design/index.html

ROADWAYS All major roadways and side streets should be labeled. MnDOT used “TH” not “I” or “US” or “MN” for all state highways. PPB-GENERAL LAYOUT 2018-12 http://ihub/projectdelivery/design/index.html

CITY, COUNTY, CORPORATE LIMITS The general layout should label all Major Cities, Counties, and Corporate Limits. PPB-GENERAL LAYOUT 2018-12 http://ihub/projectdelivery/design/index.html

BEGIN/END SP# The general layout should label all SP#s, with a Beginning and Ending stationing PPB-GENERAL LAYOUT 2018-12 http://ihub/projectdelivery/design/index.html

EXCEPTIONS The general layout should label all exceptions. These are based on the alignment as stated in the length block(s) on the title sheet. PPB-GENERAL LAYOUT 2018-12 http://ihub/projectdelivery/design/index.html

EQUATIONS The equations that pertain to the project limits should be included on the general layout. The back equation is always listed before the ahead equation as it pertains to the previous section (left). PPB-GENERAL LAYOUT 2018-12 http://ihub/projectdelivery/design/index.html

PLAN SHEET REFERENCES Indicate on the general layout where in the plan the major components of the plan can be found. Sheet numbers can be labelled on the layout using different symbols for such things as topography sheets, construction plan sheets, drainage plan sheets, etc., with the corresponding sheet number in the corresponding symbol. PPB-GENERAL LAYOUT 2018-12 http://ihub/projectdelivery/design/index.html

PLAN SHEET REFERENCES Another way to show it is with a table referencing the various plan sheet numbers. This is typically used when the sheet sections are labelled as X of X in the bottom right corner. PPB-GENERAL LAYOUT 2018-12 http://ihub/projectdelivery/design/index.html

BRIDGES All inplace and proposed bridges should be labeled on the general layout. What they cross over/under should also be labeled. (e.g. Rivers, Railroads, roads, etc.). PPB-GENERAL LAYOUT 2018-12 http://ihub/projectdelivery/design/index.html

SIGNALS & LIGHTING The general layout is a good place to show proposed signal locations. PPB-GENERAL LAYOUT 2018-12 http://ihub/projectdelivery/design/index.html

WALLS The general layout should show the proposed wall locations. PPB-GENERAL LAYOUT 2018-12 http://ihub/projectdelivery/design/index.html

AREAS OF ENVIRONMENTAL SENSITIVITY It is important to show the areas of environmental sensitivity in the plan to make sure these areas are not impacted. These locations must be shown on the general layout sheets. It is recommended to also show them on the removal and construction plan sheets as well. PPB-GENERAL LAYOUT 2018-12 http://ihub/projectdelivery/design/index.html

INDEX MAP (Continued) The Index Map should include a north arrow. http://ihub/projectdelivery/design/index.html PPB-GENERAL LAYOUT 2018-12

GENERAL LAYOUT – CONSTRUCTION PLAN VIEW Sometimes general layouts are used in place of construction plan views. Such as is sporadic culvert work or turn lanes. PPB-GENERAL LAYOUT 2018-12 http://ihub/projectdelivery/design/index.html

CONCLUSION There are several ways to show information on the general layout. The above slides were a few examples of how they can be shown. The information included should be the same no matter which example you follow. PPB-GENERAL LAYOUT 2018-12 http://ihub/projectdelivery/design/index.html

QUESTIONS???? Any questions contact us ANYTIME: Tim Swanson, P.E. @ 651-366-4689 tim.swanson@state.mn.us Yvonne Crocker, P.E. @ 651-366-4610 yvonne.crocker@state.mn.us Jane Krebsbach@ 651-366-3183 jane.krebsbach@state.mn.us PPB-GENERAL LAYOUT 2018-12 http://ihub/projectdelivery/design/index.html