Sewanee Civic Association

Slides:



Advertisements
Similar presentations
Layouts Multibend-Center. Manual Loading Manual Loading, Finished part back to operator.
Advertisements

1 CS 446 – Tutorial 6 Frid. Nov. 6 th, 2009 Implementation Tutorial.
FCIA CODE EFFORTS FCIA Spring Conference 2003 By William E. Koffel, P.E. Koffel Associates, Inc.
Subpart R Steel Erection. Workers of the past were sometimes referred to as “Dare Devils.”
Tunnel Structures The ultimate small scale farmers Greenhouse ‘Do it Yourself’ | Scientific | Economic.
ROOF DESIGNS 1. TYPES OF ROOFS The roof greatly affects the overall appearance of a home. There are many standard styles from which to choose. Choose.
1 MICE Hydrogen System Elwyn Baynham, Tom Bradshaw, Iouri Ivaniouchenkov RAL MICE / RAL Safety RAL, 30 October 2003.
ROOF DESIGNS. TYPES OF ROOFS The roof greatly affects the overall appearance of a home. There are many standard styles from which to choose. Choose a.
SPI Toddler Play Events Cynthia Masters
January 22, Advanced Modular Sample System Richard E. Hughes.
Senior Project Database: Design and Usability Evaluation Stephanie Cheng Rachelle Hom Ronald Mg Hoang Bao CSC 484 – Winter 2005.
ME Project: Air Conditioner Lab Team: 10 Members: Sean M. Gallagher, Brian Davison, Prathana Vannarath, Pam McDowell Customer: University of Delaware Mechanical.
Under The Sea Playground By: Amanda Henriksen, Taylor Hile, & Kara Mclaughlin.
Introduction of Open Web Steel Joist, Deck and Composite Steel Joist
Guide to MCSE , Enhanced 1 Activity 2-1: Exploring Device Manager Objective is to explore the use of Device Manager View properties of existing hardware.
 The Club Car Villager 4 The Club Car Villager 4  The Club Car Villager 6 The Club Car Villager 6  The Club Car Villager 8 The Club Car Villager 8.
Tools Menu and Other Concepts Alerts Event Log SLA Management Search Address Space Search Syslog Download NetIIS Standalone Application.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
BobcatBUY Frequently Asked Questions Procure to Pay Services Updated 2/1/2012 Table of Contents.
Operational and Production Aspects of Contemporary Business Chapter Course: BUS 101 Lecturer: NNA.
StreamBase Systems Inc. - SIFMA Tradeshow
Buying a Car 6.5. Manufacturer’s Suggested Retail Price MSRP or Sticker price Base price Extended Warranty Features.
WebScan Change Order. WebScan change order: What is it? Beginning in 2010 changes to a WebScan order will need to be submitted via a WebScan change order.
Google App Engine in Google Apps Deploying Google App Engine applications to Google Apps +
Here is the log in for your control panel. Enter your user name, password and click Login.
Page 1 of 6 We recommend that you also view the FMT Training Overview and the ETS General modules before using this system. Similar to ETS, the Freehold.
FACILITY CONCEPT DESIGN Section presents Intermodal Center/Multimodal Terminal facility design on the preferred White Oaks sub-area. Main Street LRT is.
Ray Casper - Foundations Engineer John Scanlon - Structural Engineer Jimmy Mounnarat - Fluid System Engineer Igor Babushkin - Solar Thermal Engineer Preliminary.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
WinCVS Training è Basic Concepts è Download & Setup è Importing a new module into CVS Repository è Getting new module from CVS è Getting Latest version.
1 © 2005 Cisco Systems, Inc. All rights reserved. Cisco Unity 4.1 Documentation What you need to know.
Powered by Arbroath Outdoor Gym Monday, May 11, 2015.
Drafting 2 (Arch) Quiz Review #6 Quiz Review. 1.To anchor a stud wall to the subfloor, carpenters nail through the: Sole plate Header Jamb Joists Quiz.
CONCEPT™ TYPE 4X STAINLESS STEEL SLOPED-TOP ENCLOSURE NOVEMBER 2012 EQUIPMENT PROTECTION SOLUTIONS.
Joshua ISD Technology Training. Word 2013 Opening Word 2013  Click the Start button  Enter “word” in the Search box  Click on the Word 2013 when it.
Financial Reporting In Peoplesoft California Maritime Academy Data Warehouse Training Fiscal Year 2011/2012.
PRESENTED BY: Al Cobb, Founder, Sips School CHAPTER 5 OF 10 SIP Layout Drawings SPONSORED BY:
 To provide a realistic accurate idea of the cost  Provide information about building or not.
All-Play fully accessible playground Final presentation
Good Morning  Please be sure to take care of your belongings.
“5-Minute Prep” For Ecosystems
LBNF CAD models, Drawings and Component list
LASER SAFETY Reminder EXSO EP HSE AD Hall 18 November 2016 S. DETRAZ
Process for Reverse Live Auction
Good Morning  Please be sure to take care of your belongings.
INSTALLATION SEQUENCE
All-Play fully accessible playground Progress report #1
Good Morning  Please be sure to take care of your belongings.
Good Morning  Please be sure to take care of your belongings.
Lighting Rain and twigh light sensor
Good Morning  Please be sure to take care of your belongings.
HCAL Data Concentrator Production Status
SJVRWRF Dewatering Building Corrosion Remediation
Good Morning  Please be sure to take care of your belongings.
PITT COUNTY SOLID WASTE & RECYCLING
Good Morning  Please be sure to take care of your belongings.
GM Dealer Equipment Program
Writing – (A short article about a touristic place or national park)
Zoom Video Webinar Housekeeping Slides
Windmill Natural Playground
First Presentation Project
مفهوم الموازنة العامة المقدمة
Always Connected introduces Tigo SMART 3.1 This guide is interactive!
Recycle Even More Help reduce landfills.
Instructions for Logging into Blackboard
2018 Green Roof Research Project
M E A S U R E ‘G’ P R O G R A M U P D A T E
Add an e to the end. Change the m to an s. What did you make?
Chicago Clamp Company Manufacturing Structurally Sound and
Budget Training: Development and Position Planning
Presentation transcript:

Sewanee Civic Association Elliott Park Concept

Three Options All Three Options Extremely Similar in Layout Recommended Design Revised High End Design Revised Low End

Recommended Design

Recommended Themed Items Timbers/Nature Log Balance Beam Stump and Rock Climber 3 Log Climber 4 Log Steppers 1 Mushroom Stepper Timbers/Nature 3’ Transfer Station 2 Slant Roofs on 6’ Decks 2 Step Link Transfer (1’ and 2’) 7 Enclosure Panels

High End Themed Items Timbers/Nature Enhanced Items Log Balance Beam Stump and Rock Climber 3 Log Climber 5 Log Steppers 4 Mushroom Stepper Timbers/Nature 3’ Transfer Station 2 Gable Roofs on 6’ Decks 2 Step Link Transfer (1’ and 2’) 7 Enclosure Panels Enhanced Items 90 Degree Curved Bridge Tunnel Up Crawl Tube Conifer Climber (would like to add to recommended version) Double Bubble Climber Sun Blossom Panel Double Seat Seat and Table for 2

Low End Themed Items Timbers/Nature Major Changes 3 Log Climber N/A Eliminated Roofs 100% metal and plastic with the exception of the 3 log climber In short, exactly what the group told me not to do

Preliminary Budget By Design Recommended High Features Low Features Equipment $46,329 $54,655 $33,512 Installation $13,184 $15,598 $11,862 EWF $3,053 Freight $2,778 $3,156 $2,024 Total $65,345 $76,463 $50,452 Please consider these budget numbers. They should be very close to exact, pending freight changes and review of designs by engineering.