IEEE 802 IMT-Advanced Technology Proposal Process

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0024r0 Submission July 2004 Steve Shellhammer, Intel CorporationSlide 1 IEEE Wireless Coexistence TAG Steve Shellhammer
Advertisements

Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
IMT activities in ITU-R DOCUMENT #:GSC13-PLEN-13 FOR:Presentation SOURCE:ITU-R AGENDA ITEM:Plenary 6.1 CONTACT(S):Kevin Hughes Submission Date: July 1,
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Activities of ARIB on IMT Standards Kohei SATOH Association of Radio Industries and Businesses (ARIB) DOCUMENT #:GSC13-Plenary-60 FOR:Presentation SOURCE:Kohei.
Doc.: _SEC_Motions_Mar08 Submission March 2008 Michael Lynch, Nortel Networksh Motion to SEC Motion by: LynchSeconded by: Heile.
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Doc.: IEEE Submission July 2009 Michael Lynch, MJ Lynch & Associates IEEE IMT Advanced Update IEEE 802 has continued active.
Doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, QualcommSlide 1 IEEE TGz Montreal Agenda Date: May 10, 2009 Authors:
Doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Update on IEEE IMT Advanced RR-TAG was directed to take.
Submission doc.: IEEE 11-10/1021r3 September 2010 George Bumiller, Research In MotionSlide 1 Notes for Liaison to IEEE Emergency Services Date:
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
TGm Work Plan Adhoc Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/1181 Date Submitted: Source:
Month Year IEEE Motions in July, 2016 Plenary
Month Year IEEE Motions in July, 2017 Plenary
RR-TAG (802.18) to Liaison Report
ITU-R Ad-Hoc Contact person
IMT-2020 Contribution Content
doc.: IEEE <doc#>
[RR-TAG Liaison Report to ]
IEEE Liaison Report to IEEE
IMT-Advanced Opening Report
doc.: IEEE /xxx Mika Kasslin TGh chair March 15, 2001
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
Mika Kasslin, TGh chair January 19, 2001
<month year> doc.: IEEE < e> <January 2018>
TGz Beijing May 2010 Closing Report
IMT-Advanced Closing Report
IEEE Motions in July Plenary DCN:
Liaison Report from Date: September 20, 2012 September 2012
Possible liaison motion for IEEE as an IMT-2020 technology
IEEE ah Timeline Projection
IEEE (RR-TAG) Liaison Report
<month year> doc.: IEEE < e> <January 2019>
IEEE IMT-Advanced Review Process
doc.: IEEE <doc#>
Month Year IEEE Motions in July Plenary DCN:
RTA TIG Closing Report Date: Authors: March 2019
802.11bd Timeline Date: Authors: January 2019
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
RR-TAG Liaison Report November 2008 IEEE
Comments on IMT-Advanced Review Process
IEEE 802 IMT-Advanced Technology Proposal Process
<month year> doc.: IEEE < e> <January 2018>
July 2018 doc.: IEEE r0 July 2018 PAR Review SC - Meeting Agenda and Comment slides - July 2018 – San Diego Date: Authors: Jon.
60 GHz Spectrum Allocations
IEEE IMT-Advanced Review Process
AANI SC Agenda 8 January 2018 Teleconference
IMT-Advanced Opening Report
RR-TAG Closing Report Report of September 2008 plenary meeting
Submission Title: [Proposed project timeline]
IMT-Advanced Status Report
Month Year doc.: IEEE yy/xxxxr0 May 2019
Submission Title: TG4m 4TV Closing Report for September 2013
IEEE 802 IMT-Advanced Technology Proposal Process
IEEE IMT-Advanced Review Process
18 March Agenda Opening comments and attendance
Activities of ARIB on IMT Standards
AANI SC Agenda 8 January 2018 Teleconference
TGp Motions for Tuesday
AANI SC Agenda 27 November 2017 Teleconference
TTA activities on IMT-Advanced Standardization
RR-TAG Liaison Report July 2008 IEEE
EC Closing Report on Rules
Month Year doc.: IEEE yy/xxxxr0 May 2019
IEEE 802 IMT-Advanced Technology Proposal Process
Presentation transcript:

IEEE 802 IMT-Advanced Technology Proposal Process Month Year doc.: IEEE 802.11-yy/xxxxr0 March 2008 IEEE 802 IMT-Advanced Technology Proposal Process Date: 2008-03-19 Authors: John Notor, Cadence Design Systems, Inc. John Doe, Some Company

Month Year doc.: IEEE 802.11-yy/xxxxr0 March 2008 Approval Process A Working Group (WG), or WG combinations, submits a draft Radio Interface Technology (RIT) proposal, or a draft proposal for a Set of RITs (SRIT) to 802.18 for review: Proposal requirements: draft must be complete, including self- evaluations, per ITU-R WP5D submission requirements. The WG must approve the draft prior to submission to 802.18. 802.18 reviews proposals for completeness and accuracy relative to WP5D requirements for submission: If 802.18 finds the proposal is not in compliance with WP5D requirements, 802.18 returns the proposal to the WG with a list of discrepancies and, where possible, suggestions for corrections. If 802.18 finds the proposal in compliance with WP5D requirements, 802.18 approves the proposal, forwarding the proposal to the EC for review/approval. After EC approval, the chair of 802.18 will submit the proposal to WP5D, with appropriate cover letter. John Notor, Cadence Design Systems, Inc. John Doe, Some Company

Month Year doc.: IEEE 802.11-yy/xxxxr0 March 2008 Critical Milestones Last date for WG’s to submit technology proposals (final WG approved drafts) to 802.18 for review: June 12, 2009. Last date for 802.18 approval of proposals for submission to the EC: July 16, 2009. Last date for EC approval of technology proposals: July 17, 2009. Last date WP5D will accept technology proposals: October 2009 (exact date is TBD). Slide 3 John Notor, Cadence Design Systems, Inc. Page 3 John Doe, Some Company