Mod 0333: Supporting Information Pack

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Update from DCMF MIG Claire Campbell Chair – DCMF MIG 05 April | Energy Networks Association - DCMF.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Committed to sustainable productivity
SGN’s April 09 Mod 186 Report DCMF Meeting – April 27 th 2009.
Review Group 291 – Balancing Arrangements Default Cashout Workshop 3 – 21 st June 2010.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
THE FOSTER GROUP TFGTFG City of Detroit Water and Sewerage Department Wholesale Customer Rates Meeting Water Supply System Meeting #3 – Allocated FY
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Liquidity & Reserve Management Strategies & Policies
EDCM Workshop Workstream C Update Andy Pace - Chair 10 November | Energy Networks Association.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Atlas Copco Group Q1 Results April 28, Contents  Q1 Business Highlights  Market Development  Business Areas  Financials  Outlook.
Initial Thoughts on Timeline for Entry Capacity Substitution Draft for discussion purposes only.
COMMITTED TO SUSTAINABLE PRODUCTIVITY Q results October 20, 2014.
Transitional Exit Capacity Proposals -Update Transmission Workstream, 1 Dec Nov 05.
Gas Transmission Charging Review: Final Capacity Charging Proposal Gas TCMF 14 th December 2006.
Atlas Copco Group Q results January 31, 2013
Fuel Cost Components in the Fuel Adder
Liquidity & Reserve Management Strategies & Policies
Fuel Cost Components in the Fuel Adder
Transmission Workstream 6 January 2011
DCMF Meeting – January 26th 2009
Fuel Cost Components in the Fuel Adder
The face of interaction
Review Group 291- Ofgem Update
Date of download: 11/9/2017 Copyright © ASME. All rights reserved.
Exit Capacity User Commitment – Transmission Workstream update
Mod 186 Report Assumptions for 2013 DCMF 26 January 2009
PLAN REVIEW Enron Transportation Services
Transmission Planning Code
Historical T&D charge volatility
Dimitar Bogov Vice Governor
4106 Advanced Investment Management Tactical Asset Allocation 2 session 6 Andrei Simonov Tactical Asset Allocation 11/28/2018.
Balancing Actions 2017 Update on
Amendment to NEA & NExA Measurement Provisions Change Process
NTS Entry Charging Review Update
Capacity Methodology Statements
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
Exit Capacity Substitution and Revision
Cashout actions and further considerations
The Proposals Restructure the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible.
Presentation on behalf of all DNs Lorraine Goodall - SGN
Atlas Copco Group Q results October 24, 2012.
Review Group 291- Ofgem Update
Ritchard Hewitt – September 2010
Draft Mod: Update of default System Marginal Prices
UNC Transmission Workstream 7th December 2006
UNC Transmission Workstream 15th June 2005
Atlas Copco Group Q results July 17, 2012 July 17, 2012.
Atlas Copco Group Q results April 29, 2013
Richard Fairholme Transmission Workstream 4th September 2008
Assured Pressures Proposal
Denis Aitchison/Rob Hetherington
Additional Gemini API’s UK Link - Class 3 Modification
Optimisation of Entry Capacity Modification Proposal
Transmission Workstream DN Interruption Update - Introduction
Transmission Workstream 09/11/2010
Transmission Workstream 1st February 2007
Stefan Leedham Transmission Workstream 2nd November 2006
Transmission Workstream, 1 Mar 07
Thing / Person:____________________ Dates:_________________
Pricing and Margins Manager National Grid Distribution
Revised Tender Timescale for DN Interruption Arrangements
Unidentified Gas (UIG)
Dimitar Bogov Vice Governor
OFFERING CAPACITY AT DONOR ASEP IN TRADES & TRANSFER PROCESS
Transmission service (approved tariffs) (approved tariffs) Variation
Presentation transcript:

Mod 0333: Supporting Information Pack Transmission Workstream 07/10/2010

Appendix A - Volatility of current Mod 0333 methodology Throughput & Imbalance fairly stable Allowed Revenue linked to NTS assets hence increasing Decrease in Compressor Fuel due to reduced flow of gas from North to South.

Appendix B – Volatility of alternative cost method Target Revenue & 1 in 20 demand stable Indicative default SMPs when combined with Compressor Cost

Appendix C – Volume & value of Cashout (2006/07)

Appendix C – Volume & value of Cashout (2007/08)

Appendix C – Volume & value of Cashout (2008/09)

Appendix C – Volume & value of Cashout (Oct 09 to date)