Quaker Lane & Seminary Road/ Janney’s Lane March 14, 2013

Slides:



Advertisements
Similar presentations
2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June , Santa Barbara, CA SR 46 Improvement PSR/PDS Study.
Advertisements

NICHOLS SCHOOL TRAFFIC OPERATIONS STUDY. Existing Operations Examined Data Collection  On-site Count Collection of Representative Traffic Conditions.
Case Study 2 New York State Route 146 Corridor. This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park,
Comparative Traffic Study Morrisville-Carpenter Road versus Crabtree Crossing Extension Presentation to: Morrisville Town Council Prepared by: Parsons.
West Contra Costa Unified School District
I-394 Express Lane Community Task Force March 18, 2004.
Fred Luna, SBCAG Paul Martinez, Caltrans District 5 Project Information State Route 246 Passing Lanes 1.
Redwood Road & 35th Avenue Traffic Study. Problems Observed: High collision rate along the corridor was found at McArthur Boulevard intersection, with.
City of Little Rock Public Works – Traffic Engineering Division City of Little Rock City of Little Rock Dallas Phasing Implementation Rodney Parham Road.
A) 80 b) 53 c) 13 d) x 2 = : 10 = 3, x 3 = 309.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Case Study 4 New York State Alternate Route 7. Key Issues to Explore: Capacity of the mainline sections of NYS-7 Adequacy of the weaving sections Performance.
N TELEGRAPH RD Vehicle Position vs. Signal Timing for the Intersection of Telegraph Road and Maple Road Position 1: Vehicle entering intersection 0.1 seconds.
PASSER II SOFTWARE.
Traffic Signal Warrants
CEE – Spring 2005 Lectures 10 to 11 (Chapters 21, 22) Analysis of Signalized Intersections.
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
Roundabout Capacity Analysis Framework Presented By: Dave Stanek & Joel Rabinovitz Fehr & Peers Presented By: Dave Stanek & Joel Rabinovitz Fehr & Peers.
Lexington Town Center Streetscape Project Page 1 Battle Green Improvements Project Intersection of Bedford Hancock Street / Harrington Road Board.
TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
FORTIFY……… ……………..I-40 / I-440 NC DOT Project. August 2012 New I-40/440 rebuild project dubbed 'Crawleigh' by NC DOT October 2013 New I-40/440 rebuild.
Challenges in Using Paramics in a Secondary Plan Study – Case Study of Downsview, Toronto Paramics Users Group Meeting October 5, 2009.
Challenged Detectors – Volume- Occupancy Plots & Maps.
LADOTD Statewide Traffic Engineers Meeting June 19, 2014 Traffic Signal Timing Project Update Nick J. Ferlito, Jr., P.E., PTOE Neel-Schaffer, Inc.
Traffic Signal Timing Design Part I. Slide 2 Steps in Designing a Traffic Signal Timing Plan (1/2) 1. Determine lane configurations and lane volumes 2.
Senior Project SR-60/Theodore St. November 14, 2014.
Portland State University 11 By Maisha Mahmud Li Huan Evaluation Of SCATS Adaptive Traffic Signal Control System.
Problem 4: Okeechobee Road Stopped Control Analysis.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
2004 Transportation M etropolitan A tlanta P erformance Report – Congestion Measures Presentation to ITS Georgia August 29, 2005.
ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT Transportation Committee Meeting January 27, 2012.
Problem 4: Clifton Country Rd/Route 146 Intersection Base Case Phasing and Volumes Analysis Plans Description of Analyses Overarching Issues 4a: AM peak.
Transportation Committee Update 10/13/2015. Transportation Committee Members Roads Subcommittee Bill Wanatosky Benson King Anthony Watkins Helene Rosenheim.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Peachtree Road Transformation Project: Operations and Safety Analysis P.I Fulton County August 25, 2015 Buckhead CID 1.
Using Archived Data to Measure Operational Benefits of a System-wide Adaptive Ramp Metering (SWARM) System Data Collection Plan / Experimental Design May.
US Route 33 Access Management Study Purpose- Determine feasibility of converting US 33 from Hamilton Road in Franklin County to Carroll in Fairfield County.
NCHRP PROJECT : ESTIMATING THE LIFE-CYCLE COST OF INTERSECTION DESIGNS Kittelson & Associates, Inc.
Yue (Danny) Wang supervised by Prof. Peter Furth.
Project Sponsor: Ohio Department of Transportation District 12.
Case Study 4 New York State Alternate Route 7 Problem 2.
Case Study 1 Problem 5 Styner/Lauder Intersection Moscow, Idaho.
NC-54 at Farrington as Offset Intersection
Nixon Road Corridor Study: Findings & Options
The I-465 West Leg Reconstruction Project
JUAN DE FUCA PEDESTRIAN CROSSING Transportation and Public Infrastructure Committee Colwood, BC 1 October 2012.
BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT
Lane Volume Allocation
Traffic Engineering Division Nestor A. Flores, P.E., PTOE
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
Tasnim Rabee’ Nagham Dmaidi
Problem 2: Moe Rd/Route 146 Intersection
FM 518 By-pass Traffic Review
NAS Whidbey Island Gate Hours
Signal Timing: Putting it All Together
ARTERIAL INTERCHANGE Four exit ramp, split level (SPUI)
Problem 5: Interstate 87 Interchange
STATE SUEE AND ONE WAY CORRIDORS
CE 3500 Transportation Engineering Saturation flow and signal LOS
Problem 3: Shenendehowa Campus
Изразеното в настоящата презентация мнение обвързва единствено автора и не представлява официално становище на Комисията за финансов надзор Данил Джоргов.
Current and proposed HOT facilities update
Elapsed Time.
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
Project Location. Cambridge/Arlington Intersection Reconstruction Public Information Meeting June 16, 2015.
Transportation Engineering Calculating Signal Delay February 23, 2011
FREEWAY MANAGEMENT SYSTEMS:
Signal Design CTC-340.
Presentation transcript:

Quaker Lane & Seminary Road/ Janney’s Lane March 14, 2013

Current Conditions Quaker Lane Quaker Lane AM Peak Hour Volumes PM Peak Hour Volumes Seminary Rd Seminary Rd N N Quaker Lane Quaker Lane

Safety Concern this Proposal Will Address Seminary Road Janneys Lane N Quaker Lane

Proposed Lane Configuration Change Seminary Road Janneys Lane Quaker Lane

Analysis of Proposals Level of Service Analysis AM Peak Hour LOS- HCM SEMINARY RD. & QUAKER LN. AM Peak Hour LOS- HCM PM Peak Hour LOS- HCM EB WB NB SB Overall Existing Conditions F E D Proposed C Proposed – Barn’s Dance

Effects on Eastbound AM Queue Lengths Existing Queue Proposal Queue Eastbound Queue

Effects on Eastbound PM Queue Lengths Existing Queue Proposal Queue Eastbound Queue

Queue Analysis AM Peak Hour Queue Length 95th - Synchro SEMINARY RD. & QUAKER LN. AM Peak Hour Queue Length 95th - Synchro EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT Existing Conditions 171 1092 n/a 88 392 1357 506 148 #588 Proposed 846 23   417 1415 523 155 576 Proposed – Barn’s Dance 724.0 118.0 343 1149.0 408.0 115.0 485.0 SEMINARY RD. & QUAKER LN. PM Peak Hour Queue Length 95th - Synchro EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT Existing Conditions 141 1173 n/a 39 351 540 401 389 655 Proposed   869 34 323 551 407 412 Proposed – Barn’s Dance 699 194 243 442 336 261 521

Questions?