Peak demand Cases Peak case #1 Peak case #2 Peak case #3

Slides:



Advertisements
Similar presentations
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Advertisements

Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
“2014 WORLD BANK CONFERENCE ON LAND AND POVERTY” Washington DC, March 24-27, 2014 PUBLIC TRANSPORT SERVICE AVAILABILITY: A REDEFINITION OF URBAN LANDSCAPE.
Learning Targets “I Can…” -Define “ecological footprint.” -Determine your ecological footprint based on your current lifestyle. -Explore options to reduce.
Case: Beta Management Week 6. The Objectives 1. To gain practice in calculating risk and return measures on stocks and portfolios, including estimation.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
Cost-Benefit Analysis Modelling: indicators & Monetization TYNDP/CBA SJWS 6 – 13 May 2014.
B AKER E NGINEERING AND R ISK C ONSULTANTS, INC. ©2010 Baker Engineering and Risk Consultants, Inc. Building Blast-resistant Design Risk-based Approach.
Market Integration & SoS Initial proposals for SJWS #5 ENTSOG offices – Brussels Stakeholder Joint Working Session – 20 March 2012.
RTI,Chennai Learning Objective Given the concepts of Decision Analysis, Option Pricing and Investment Decisions, the trainee will be able to audit the.
PROPOSED DECISION-MAKING FLOW-CHART FOR SECTION 54s STOPPAGES: FOR EACH DANGEROUS OCCURRENCE, PRACTICE OR CONDITION : STEP 1: Rank the extent that the.
TYNDP SJWS #3 Demand TYNDP – 3 rd SJWS 08 March 2012 ENTSOG offices -- Brussels.
Transparency requirements in accordance with the provisions of Regulation 715 M.Sc. Aleš Osrajnik Ljubljana, 13 September, 2012 ACER Workshop on Transparency.
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
1 The availability, timeliness and quality of rapid estimates UNCTAD experience Henri Laurencin INTERNATIONAL SEMINAR ON TIMELINESS, METHODOLOGY AND COMPARABILITY.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
Coping with Water Scarcity Utilizing Water Accounting/Auditing Methodologies and Advanced Technologies Thierry Facon Senior Water Management Officer FAO.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Gas Balancing Alert Transmission Workstream – Oct 2005 Ritchard Hewitt.
TYNDP SJWS #5 Demand & Supply – Infrastructure Projects TYNDP – 5 th SJWS 20 April 2012 ENTSOG offices -- Brussels.
1 South Gas Regional Initiative 16 th Dec 2011 South Gas Regional Initiative 16 th Dec 2011.
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Ainārs Meņģelsons Public Utilities Commission Latvia 10th Baltic ERI June 4, 2010 Kuressare, Estonia IMPLEMENTATION OF 3-rd EC PACKAGE IN LATVIA.
User Satisfaction Surveys in Eurostat and in the European Statistical System 2008 Conference on Quality in Official Statistics Rome, 8-11 July 2008 Pierre.
Shanghai Jiao Tong University Institute of Wireless Comm. Tech. (IWCT) 无线技术沙龙 Wireless Club 创 新 无 线 精 彩 无 限 Enabling Splendid Wireless A Theoretical Framework.
Update on Retirement Advisory Committee March 17, 2011.
Probabilistic Approach to Resource Adequacy Resource Adequacy Forum Technical Committee Meeting Portland, OR January 23, 2009.
6-1Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Course Code MGT 561 Supply Chain Management Book: Supply Chain Management Strategy,
BUS 694 Entire Course FOR MORE CLASSES VISIT BUS 694 Week 1 Proposed International Business Acquisition BUS 694 Week 2 Predicting Exchange.
CYSM Risk Assessment Methodology Co-funded by the Prevention, Preparedness and Consequence Management of Terrorism and other Security-related Risks Programme.
Valley Import Constraint Resmi Surendran. Valley Import Constraint Range of SFs – to in valley area – 0.03 to outside valley area Not.
WG FBA Status Report Jerzy Dudzik IG Meeting, 12 th June 2007.
FIN 402 Week 1 DQ 3 What is a derivative? What are the different types of derivatives? How do businesses use derivatives to mitigate risks? To purchase.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Details of demand management options
Congestion Management
Dr. Benoît ESNAULT (CRE) and Dr. Stefanie NEVELING (BNetzA)
Review of Demand Estimation Times for Modification Proposal 461
Figure 3: TSN Analysis Methodology
Gas Regional Investment Plans
Background and Process
IG meeting, December 5th, 2012, DERA premises, Copenhagen
RIIO-GD1:network charging volatility
بسم الله الرحمن الرحيم قَالُوا سُبْحَانَكَ لا عِلْمَ لَنَا إلاَّ مَا عَلَّمْتَنَا إنَّكَ أَنتَ العَلِيمُ الحَكِيمُ صدق الله العظيم ( البقرة 32 )
26th February 2015 Teleconference
Tools and Methodologies in Assessing Technology Needs
Transparency in the Energy Community Contracting Parties
Gas balancing – where next
Gas Quality & TSO – LSO Coordination
دانشگاه علوم پزشکی بوشهر دانشکده بهداشت
دانشگاه علوم پزشکی بوشهر دانشکده بهداشت
Proposer: National Grid NTS Panel Date: 17th April 2014
26th February 2015 Teleconference
Road map of proposed work
Proposer: Malcolm Montgomery Panel Date: 20/10/16
Unit 3 Review (Calculator)
Updated information - Hornsea
Proposer: Debbie Brace Panel Date: 20th March 2014
ERGEG comment to KEMA study on Art. 3 and 7
Calculate 9 x 81 = x 3 3 x 3 x 3 x 3 3 x 3 x 3 x 3 x 3 x 3 x =
UNC Modification 0229 Role of the UNC Committee
HCL Application Modernization Services
Less-than-truckload (LTL) carrier-to-carrier collaboration under uncertainty : A real options approach Choungryeol Lee and Srinivas Peeta Demand uncertainty.
Update developments in Core CCR
Enabling Large Scale Utilisation of Class 3
Update developments in Core CCR
Presentation transcript:

Peak demand Cases Peak case #1 Peak case #2 Peak case #3 Proposed names Peak case #1 High level of demand calculated according to the national standards or business codes that is used by TSO’s to assess the network capacities and needs of development. The peak case #1 is the high daily demand considered in the national plans. Peak case #2 High level of demand calculated by TSOs under a harmonized level of risk, following a common methodology – when possible. This demand case considers the simultaneous occurrence of the so calculated high level of demand in every country. Peak case #3 Demand case derived from the peak case #2. In the peak case #3 the lack of simultaneity in the occurrence of the high levels of demand induces the mitigation of the peak demand. Design Case (DC) Option 1: High Peak Option 2: Undiversified Peak Option 3: Simultaneous Peak Option 1: Low Peak Option 2: Diversified Peak Option 3: Unsimultaneous Peak