News & Action Items Automatic Release Ready notification system is in place and working (Thanks Alan!! ) Needs refinements!!! New Fermi RH CD-Rom released.

Slides:



Advertisements
Similar presentations
Windows DX 66 megahertz (MHz) or faster processor (Pentium central processing unit recommended). 16 megabytes (MB) of memory (24 MB recommended).
Advertisements

McFarm: first attempt to build a practical, large scale distributed HEP computing cluster using Globus technology Anand Balasubramanian Karthik Gopalratnam.
Infrastructure Trial Training September 15, Infrastructure Trial.
2 Copyright © 2009, Oracle. All rights reserved. Installing your Oracle Software.
Chapter 2 INSTALLTION OF LINUX DISTRIBUTION. Minimum hardware requirement 1) DVD drive: You must have a DVD drive (either DVD-ROM or DVD burner), and.
Spiceworks Overview Enterprise Business Group Jul-2015.
Section 01Resources1 HSQ - DATABASES & SQL 01 Resources And Franchise Colleges Name :MANSHA NAWAZ room :G 0/32
16.1 © 2004 Pearson Education, Inc. Exam Managing and Maintaining a Microsoft® Windows® Server 2003 Environment Lesson 16: Examining Software Update.
Julie McEnery1 Installing the ScienceTools The release manager automatically compiles each release of the Science Tools, it creates a set of wrapper scripts.
© 2009 GroundWork Open Source, Inc. PROPRIETARY INFORMATION: Information contained herein is not for use or disclosure outside of GroundWork Open Source,
Overview of the ODP Data Provider Sergey Sukhonosov National Oceanographic Data Centre, Russia Expert training on the Ocean Data Portal technology, Buenos.
Introduction to HP LoadRunner Getting Familiar with LoadRunner >>>>>>>>>>>>>>>>>>>>>>
Computer-Based Testing Update Tara Gardner, Computer-Based Testing Coordinator.
Margaret Kubitschek, Solution Architect Sam Brewster, Customer Delivery Manager Dennis Keating, Account Executive Siemens PLM Software19 March 2010 Teamcenter.
1 RH033 Welcome to RedHat Linux. 2 Hardware Requirements ♦ Pentium Pro or better with 256 MB RAM ♦ Or ♦ 64-bit Intel/AMD with 512 MB RAM ♦ 2-6 GB disk.
IBM Express Runtime Quick Start Workshop © 2007 IBM Corporation Install IBM Express Runtime Development Environment.
DØ IB Meeting, Nov. 8, 2001 J. Yu, UTA, Remote Analysis Status Remote Analysis Coordination Computing hardware is rather inexpensive –CPU and storage media.
Learningcomputer.com SQL Server 2008 – Installation of SQL Server 2008.
Module 13: Maintaining Software by Using Windows Server Update Services.
Windows XP Why Implement? Presented By: Amanda Fletcher Phoebe Porter.
3rd June 2004 CDF Grid SAM:Metadata and Middleware Components Mòrag Burgon-Lyon University of Glasgow.
An Introduction to Progress Arcade ™ June 12, 2013 Rob Straight Senior Manager, OpenEdge Product Management.
ExamSoft at BU LAW Boston University School of Law Office of Systems & Technology.
Jan. 17, 2002DØRAM Proposal DØRACE Meeting, Jae Yu 1 Proposal for a DØ Remote Analysis Model (DØRAM) IntroductionIntroduction Remote Analysis Station ArchitectureRemote.
DØ RACE Introduction Current Status DØRAM Architecture Regional Analysis Centers Conclusions DØ Internal Computing Review May 9 – 10, 2002 Jae Yu.
Summary, Action Items and Milestones 1 st HiPCAT THEGrid Workshop July 8 – 9, 2004 Univ. of Texas at Arlington Contact Jae Yu or Alan.
26SEP03 2 nd SAR Workshop Oklahoma University Dick Greenwood Louisiana Tech University LaTech IAC Site Report.
16 September GridPP 5 th Collaboration Meeting D0&CDF SAM and The Grid Act I: Grid, Sam and Run II Rick St. Denis – Glasgow University Act II: Sam4CDF.
From DØ To ATLAS Jae Yu ATLAS Grid Test-Bed Workshop Apr. 4-6, 2002, UTA Introduction DØ-Grid & DØRACE DØ Progress UTA DØGrid Activities Conclusions.
GridPP11 Liverpool Sept04 SAMGrid GridPP11 Liverpool Sept 2004 Gavin Davies Imperial College London.
1 Copyright © 2015 Pexus LLC Patriot PS Personal Server Installing Patriot PS ISO Image on.
UTA Site Report DØrace Workshop February 11, 2002.
DØRACE Workshop Jae Yu Feb.11, 2002 Fermilab Introduction DØRACE Progress Workshop Goals Arrangements.
Feb. 14, 2002DØRAM Proposal DØ IB Meeting, Jae Yu 1 Proposal for a DØ Remote Analysis Model (DØRAM) Introduction Partial Workshop Results DØRAM Architecture.
EMI INFSO-RI ARC tools for revision and nightly functional tests Jozef Cernak, Marek Kocan, Eva Cernakova (P. J. Safarik University in Kosice, Kosice,
ISG We build general capability Introduction to Olympus Shawn T. Brown, PhD ISG MISSION 2.0 Lead Director of Public Health Applications Pittsburgh Supercomputing.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Neutrino Program (MINOS, MINERvA, General) Margaret Votava April 21, 2009 Tactical plan.
Separate distribution of the analysis code (and more) P. Hristov 19/03/2014.
SAT ® School Day Implementation Overview November 21, 2013 Nancy Potter SAT School Day Program.
Feb. 13, 2002DØRAM Proposal DØCPB Meeting, Jae Yu 1 Proposal for a DØ Remote Analysis Model (DØRAM) IntroductionIntroduction Partial Workshop ResultsPartial.
DØRACE Workshop Agenda Feb. 11, 2002 (Morning – 1West) 8:30 Registration at High Rise next to 1 West Conference room 9:00 Welcome (John W.) - Session Chair:
DØRACE Workshop Agenda Feb. 11, 2002 (Morning – 1West) 8:30 Registration at High Rise next to 1 West Conference room 9:00 Welcome Womersley 9:10-9:30 DØRACE.
D Copyright © 2006, Oracle. All rights reserved. Further Training and Product Resources.
Apr. 25, 2002Why DØRAC? DØRAC FTFM, Jae Yu 1 What do we want DØ Regional Analysis Centers (DØRAC) do? Why do we need a DØRAC? What do we want a DØRAC do?
July 10, 2002DØRACE Status Report, Jae Yu DØ IB Meeting, OU Workshop 1 DØ RACE Status Report Introduction Software Distribution (DØRACE Setup) Hardware.
Page 1August 9, 2000Market Information Forum Market Information Forum ADS Phase 2 Update Presentation to Stakeholders Greg Ford and Kristen Kelley.
PROTO-GRID Status of Grid-enabled UTA McFarm software Tomasz Wlodek University of the Great State of Texas At Arlington.
DIT314 ~ Client Operating System & Administration
CyberPatriots 2016 Student Handbook.
Installation of the ALICE Software
Is 64 bit computing ready for the desktop?
UBUNTU INSTALLATION
Southwest Tier 2 Center Status Report
GeoPortal Training Workshop 1st Mar 2017
Software Version System Part1: Subversion at CERN
DLM Technical Training
Installing Analysis Software
BusinessObjects IN Cloud ……InfoSol’s story
UM D0RACE STATION Status Report Chunhui Han June 20, 2002
News p has no fetchpkgs.sh and fetchprod.sh shell script in the .../D0reltools/ These are missing due to the switch over to the new distribution.
DØRACE Workshop Summary
Update of D0 Linux Cluster at LaTech
Remote Analysis Coordination
DØ Internal Computing Review
SAM Offsite Coordination
News New Updated DØRACE setup instruction to reflect the download split available on the web Three new sites are at various stages Princeton: Phase IV.
Installing Analysis Software
Welcome to CBCS Custom Networks
WORKSHOP Establish a Communication and Training Plan
Division of Engineering Computing Services
Presentation transcript:

News & Action Items Automatic Release Ready notification system is in place and working (Thanks Alan!! ) Needs refinements!!! New Fermi RH CD-Rom released Monday Last week The CD Roms will be available for distribution at the workshop UTA and LTU ready at Phase 4 and 3 respectively Mark Sosebee Updated Setup Instruction for Phases I-III  Soon to be committed as a cvs package The instruction has been tested and refined up to Phases II by the BU  Meena was able to set up to Phase II within a day Simplified Phase IV Instruction is being prepared by Imperial College and UTA KSU (Tim Bolton) started to prepare DØGrid Web page linked from “DØ at Work”; Under computing as DØGrid  To be cross linked from DØRACE Use Cases being accumulated Need your participation Dec-20-2001 DØRACE, Dec. 20, 2001 J. Yu, News

DØRACE Strategy Must take a phased approach for remote analysis system set up Desk top only A modest analysis server Linux installation UPS/UPD Installation and deployment External package installation via UPS/UPD CERNLIB Kai-lib Root Download and Install a DØ release Tar-ball for ease of initial set up? Use of existing utilities for latest release download Installation of cvs Code development KAI C++ compiler SAM station setup Phase 0 Preparation Phase I Rootuple Analysis Phase II Executables Phase III Code Dev. Phase IV Data Delivery Dec-20-2001 DØRACE, Dec. 20, 2001 J. Yu, News

Good Progress!!! Progressive (39) (13) (0) (2) (0) Dec-20-2001 DØRACE, Dec. 20, 2001 J. Yu, News

Progressive (39) (13) (0) (2) Dec-20-2001 DØRACE, Dec. 20, 2001 J. Yu, News

Workshop Preparation First day of the workshop (Feb.11) will be dedicated to DØRACE set up and SAM shifter training Computing training center reserved (16 w/ computer + 16 additional accommodation for laptop) We will go through UPS/UPD installation External package installation (Phase I) Binary installation (Phase II) CVS implementation (Phase III) SAM Station set up (Phase IV) Experts will be around to help you The participating institutions need to be at Phase 0 Dec-20-2001 DØRACE, Dec. 20, 2001 J. Yu, News

Requested to prepare an analysis server with the following minimum: Pentium III or AMD faster than 1.GHz 0.5 GBytes/CPU RAM 40GB Free Disk Space 100MBit/sec network cards RH Linux installation (>=V7.1, kernel>= 2.4.16) Quite a few institutions answered that they will prepare for such a server Would like to have more than 50% at Phase II after Day 1 I am a bit worried about the UPS/UPD and the network capability to handle simultaneous download 2nd day will be devoted to DØGrid issue  Need to be ready for large scale data set within 2-3 years!! There will be coffee and snack Registration fee will be $15.00/day (Web page soon to be up) DØ Secretarial Support promised Dec-20-2001 DØRACE, Dec. 20, 2001 J. Yu, News