INFRASTRUCTURE RENEWAL AT NEW YORK PENN STATION

Slides:



Advertisements
Similar presentations
Levolors New Size-In-Store Blind Cutting Machine.
Advertisements

CURRENT WORK West Wing - Exterior: Masonry and shingles finished, fascia and soffit work ongoing - 1 st Floor: Final coat of paint, casework installed,
Infrastructure Projects 1 FHR6 Blockade Works 12th August 2013 Network Rail & Northern Rail Co-ordination Meeting.
NCSX Machine Platform FDR June 15, 2005 Erik D. Perry.
January 6. January 7 January 8 January 9 January 10.
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
A True Handcrafted Company
Installation Instructions. Delivery Light fixtures, mounting structures and electrical components ship together Poles ship on a separate truck.
Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014.
APRIL 2014 CPOC LIRR SANDY RESTORATION PROJECTS. Active LIRR Sandy Projects PROJECT EAC Traction Power Substations64.1M Long Beach Branch Systems 56.4M.
INTERCITY PASSENGER RAIL NORTHEAST UPDATE AASHTO – FEBRUARY 29,
New York Building Congress November 13, 2014 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM.
Sylvan Theater Column Restoration Project
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
January 6, REDIFIT Program Background  $5 million revolving loan fund established by the Idaho State Legislature in 2006  Transferred to ISDA.
1 Rehabilitation of the track formation layer with the RPM 2002 in Romania Using high-output track formation rehabilitation machine.
Introduction to a pit-less electronic scale “concrete deck” The scale to be shown is a B-Tek Side/Rail full electronic Platform is 70’x11’ on a slab design.
SKV welds - limitations Fatigue life only 50 % of Rail Skill of welder very important Quality control difficult Heating Tapping fusion The Age of weld.
Masonry Bracing Life Safety Considerations During Construction of Masonry Walls.
Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const.
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
Critical Thinking in Engineering Process
Broadway Street Viaduct Improvement, Pre-Load Testing and Geotech Report Workshop Consultant Presentation Iowa DOT 2 nd April 2007.
EDMS Nr /02/ tons, Platform – Q = daN, aprox. length to cover 4 m Cabling Groove – Q = 500 daN, aprox.
Carstairs S&C Sustainability Renewals & Enhancement Sean Malone Network Rail.
RLP Installation. RLP Approvals Most Servicing Railroads and ALL Class 1’s (excluding CSX) Require that the scale design, location and functionality be.
PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS.
1. 2 Civil Engineering Practice Introduction Instructor: Dr. Attaullah Shah Lecture # 1 Department of Civil Engineering Swedish College of Engineering.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
Slab Track System ÖBB–PORR Elastically Supported Track Base Plate
Introduction to a Flattop scale The scale to be shown is an Emery/Winslow Flattop Scale Platform is 40’x11’ with site rails. The foundation is a raft.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
On-line Sorting Technologies for CCA Treated Wood July 9, 2001.
Weighline Rail Scale Installation. Track prior to the scale installation.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
4/26/061 presents Project Crimson April 26, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
Impressed Current Zebra Cassette CorroDiscSurface Embedded Sacrificial Anode ZLA Roll Anode GSC Super Anode Clip On Anode Monitoring and Control Camur.
FAST TRACK TO SUCCESS SLAB TRACK SOLUTION OF STABIRAIL COMBINES ACCURACY AND DURABILITY.
INFRASTRUCTURE DEVELOPMENT CONSULTANTS Review of the East Africa Railways Master Plan Peter Kieran CPCS Transcom Limited March 11, 2010.
Modernization of Track for High Speeds. Modernization Transport more passengers/goods at high speed, safe, economic.
I-225 Rail Line Chuck Culig, Project Manager Tuesday, April 2, 2013 RTD Board of Directors Update.
Section 2 Safety, Tools and Equipment, Shop Practices Unit 6: Fasteners.
PORT OF TACOMA. Agreement Lincoln Avenue Grade Separation – Utility Relocation Request authorization for the Executive Director to Execute an Agreement.
Leads Institute of Technology & Engineering
Today´s Challenges of the Rail Infrastructure Industry
Foundation – jay Desai.
Presented by: 12/06/2016 Cover Slide
Inspection Davenport IA
Sustainable maintenance of high-speed lines with mixed traffic
High Bridge Re-Deck Project
Filter Rehabilitation and Seismic Upgrades – Construction Update
Basic Hydrology & Hydraulics: DES 601
Steve Barlow Pandrol Asia-Pacific
Escalator Installation
June 26, 2017.
MICE Partial Return Yoke Mechanical Design
Renovation of the 45-year old PS magnets
SPS activities during LS2 TE-EPC (Power Converter Group)
Basic Hydrology & Hydraulics: DES 601
Maintenance Strategies for Turnouts
Pinole-Hercules Water Pollution Control Plant Upgrade Project
Project Management 101 Business Management.
Wellborn Underpass Update
Student Name English IV 3A Teacher
CHAPTER THE TRACK.
ROYAL PELICAN Container Storage.
The Anschutz Health Sciences Building Construction Update 8 April 2019.
Polarized 3He target installation
Life Cycle Costing.
Presentation transcript:

INFRASTRUCTURE RENEWAL AT NEW YORK PENN STATION Program Milestone Report Replace Track 15: January 5 to February 26 Activity Status Remove old rail and third rail Complete  On Schedule Remove old block ties  Complete Remove old crossties and ballast Demolition of concrete track bed Install rebar and pour concrete track bed Install block ties, rail and third rail Install crossties, rail, third rail and ballast Surface ballasted track Install / test signal & power system Paint platform Rehabilitate Track 18: March 23 to May 14 Drill holes for new plates Remove embedded tie plates & grout Install new anchors & tie plates Install rail & third rail Replace #625 Turnout Complete Replace Additional Turnouts in "C" Interlocking Replace #641 Turnout March 2 to March 19 Replace #639 Turnout May 18 to May 28   Program Description Amtrak Engineering is continuing the program to perform critical infrastructure renewal to improve reliability and operations at Penn Station and along the Northeast Corridor. Phase II (Beginning January 5th) - For the Track 15 replacement (January 5th – February 26th) Amtrak forces must remove all rail, third rail, cables and signal system apparatus and begin demolition of the concrete roadbed. This requires the disposal of 350 tons of concrete. After removal of the concrete the new forms will be put in place and on-rail concrete trucks will be loaded outside of Penn Station and brought in through the “Empire Tunnel” to allow for the new concrete to be efficiently poured. This requires shutting down of the track and also the adjacent track where the trucks will sit. Once fresh concrete is poured with new forms and wood ties, the rail, third rail and all signal equipment will be replaced and tested. In addition to the replacement of the track in the concrete block tie section on Track 15, Engineering will be replacing the standard ballasted track from the end of the concrete to the west end of the platform. Once complete, all rail, ties, ballast, third rail and signal equipment will be removed and replaced in kind for the entire length of Track 15. For the Track 18 rehabilitation (March 23rd – May 14th) Amtrak forces will first pre-drill holes for the new tie plates with a rail-mounted drill on the existing track infrastructure. Once the holes are drilled into the concrete slab, the rail and third rail will be removed and the existing tie plates embedded in concrete will be extracted and replaced with grout. New tie plates will be installed and anchored into the concrete slab. New rail and third rail will be installed. During the outage on Track 18, Amtrak forces will extend their efforts east into “C” Interlocking to replace the #625 turnout. During this replacement, the full turnout (ties, rail, switch points, frog, guard rails and switch machine) will be removed from track and replaced with a new turnout panel. During a number of weekend outages between March 2nd – May 28th, Amtrak forces will work in “C” Interlocking again and replace the #639 and #641 turnouts. During these replacements, similar to the replacement of #625, the full turnout (ties, rail, switch points, frog, guard rails and switch machine) will be removed from track and replaced with a new turnout panel. From January 5th through May 28th, work tasks to be completed in New York Penn Station include: (Numbers correspond with locations where work occurred at track level. See map on next page.) 1. Replace Track 15 block tie and ballasted track 2. Rehabilitate Track 18 direct fixation track 3. Replace three (3) turnouts in “C” Interlocking Explanation of items / terminology can be found at Amtrak.com/nyprenewal.

INFRASTRUCTURE RENEWAL AT NEW YORK PENN STATION Program Milestone Report 3 2 1 Source: Amtrak