[Kara Akgulian] [Mission Ops]

Slides:



Advertisements
Similar presentations
 Falcon 9 Heavy › To carry crew capsule and propellant required to rendezvous with transit vehicle Image Credit:
Advertisements

M. R. Tetlow and C.J. Doolan School on Mechanical Engineering
Mission Design Requirements First priority is to deliver takeoff mass to aircraft team. Deliver 5kg item to ISS 24 hour launch lead time Vehicle must be.
Design Goals Saturn V Ariane 4 Pegasus Vanguard Bellerophon ? ? ?
AAE450 Spring 2009 Propellant Choice and Mass Estimates for the Translunar OTV Week 2 Presentation Thursday, Jan 22, 2009 Brad Appel Propulsion Group.
AAE450 Spring 2009 Hopper Trajectory February 26, 2009 [Alex Whiteman] [Mission Ops] [Lunar Descent] Page 1.
AAE450 Spring 2009 Brian Erson Attitude Control Systems Trans Lunar Phase Alternative Design Analysis Cold Xe Gas Thrusters [Brian Erson] [Attitude] 1.
AAE450 Spring 2009 Analysis of Trans-Lunar Spiral Trajectory [Levi Brown] [Mission Ops] February 12,
AAE450 Spring 2009 Final Sizing and Trajectory Design for 100 g/10kg Payloads [Levi Brown] [Mission Ops] March 12,
AAE450 Spring 2009 Propellant Requirements Attitude Control Thrusters with Low Thrust Orbit Trajectories [Josh Lukasak] [Attitude Group Lead]
AAE450 Spring 2009 LEO Atmospheric Drag Analysis and Lunar Orbit Circularization [Andrew Damon] [Mission Ops] February 19,
AAE450 Spring 2009 Descent Trajectory Hover Trajectory LD Code Integration John Aitchison March 5 th, 2009 [John Aitchison] [Mission Ops]
AAE450 Spring 2009 OTV Attitude Propulsion Thursday, January 22, 2009 Ryan Lehto, Propulsion.
AAE450 Spring 2009 Lunar Lander Preliminary propulsion system selection and design analysis Thursday, January 22, 2009 Thaddaeus Halsmer, Propulsion.
AAE450 Spring 2009 Translunar OTV (Orbital Transfer Vehicle) : Chemical Propulsion System Refined estimates: OTV WET Mass, Propellant Volume & Propellant.
AAE450 Spring 2009 Lunar Capture Altitude Mass to LLO for Arbitrary Time to Rotate Lander During Descent Camera/Dust Removal [Kara Akgulian] [Mission Ops]
AAE 450 Spring 2008 Brad Ferris 01/24/08 Trajectory Analyst Modeling Thrust Assistance Provided by Daniel Chua 1.
AAE450 Spring 2009 Launch Vehicle Performance Payload Cannon Zarinah Blockton Mission Ops~Group Earth to LEO~Phase Rover ~Phase February 19, 2009.
Spacecraft Propulsion Dr Andrew Ketsdever Lesson 13 MAE 5595.
A Comparison of Nuclear Thermal to Nuclear Electric Propulsion for Interplanetary Missions Mike Osenar Mentor: LtCol Lawrence.
Chapter 7 Impulse and Momentum.
Gravitational Potential Energy When we are close to the surface of the Earth we use the constant value of g. If we are at some altitude above the surface.
1 AAE 450 Spring 2008 Stephen Bluestone March 20, 2008 Propulsion Final Presentation Slides 1.
Rockets Tuesday: Rocketry Wednesday: Meet in my room 601: hydrogen demo and Quiz over rocketry. Thursday: Satellites and Orbital Mechanics Friday: Satellites,
Solving Energy problems.  A 0.1-kg baseball has 20 joules of kinetic energy as it passes over the plate. How fast is it moving?
Team 5 Moscow State University Department of Mechanics and Mathematics I.S. Grigoriev, M.P. Zapletin 3rd Global.
AAE450 Spring 2009 Preliminary Trans-Lunar Analysis [Levi Brown] [Mission Ops] January 29,
ARO309 - Astronautics and Spacecraft Design
MAE 4262: ROCKETS AND MISSION ANALYSIS
AAE450 Spring 2009 Low Thrust Spiral Transfer Maneuvers and Analysis [Andrew Damon] [Mission Ops] February 5,
AAE450 Spring 2009 Lunar Lander Main Engine Thaddaeus Halsmer Thursday, February 12, 2009 Thaddaeus Halsmer, Propulsion.
NOON UNO HIGH-MOBILITY MARS EXPLORATION SYSTEM DANIEL MCCAFFERY JEFF ROBINSON KYLE SMITH JASON TANG BRAD THOMPSON.
Proportionality between the velocity V and radius r
Category 2-Force, Motion, & Energy
Final Slides By: Kara Akgulian Mission Ops Locomotion Phase 1.
Project Bellerophon0 Backup Slides. Project Bellerophon1 Trajectory - Steering Law Function of time Defines the orientation of the launch vehicle bb
1AAE 450 Spring 2008 Scott Breitengross Mar 27, 2008 Trajectory group, Delta V, Saturn V, Feasability Determination, 1 kg Final Design Final Presentation.
AAE450 Spring 2009 Launch Vehicle Selection Zarinah Blockton Mission Ops~Group Earth to LEO~Phase March 5, 2009.
AAE450 Senior Spacecraft Design Goppert, 1 James Goppert Week 8: March 8 th, 2007 Aerodynamics: Reentry Optimization Dynamics and Control: Communication.
Impulse & Momentum Physics 11. Momentum  The product of a particle’s mass and velocity is called the momentum of the particle:  Momentum is a vector,
AAE 450 Spring 2008 Trajectory Code Validation Slides 04/12/08.
Newton’s thought experiment: orbital velocity. Surface escape velocities Planet V escape, ft/sec Mercury13,600 Venus33,600 Earth36,700 Moon7,800 Mars16,700.
AAE450 Spring 2009 Landing Site Topography Time in Earth and Moon Shadow During Transfer [Kara Akgulian] [Mission Ops] February 11,
Cost Comparison of Higher Parking Orbit Scale up for Arbitrary Payload
Stephan Shurn 28 February 2008 Propulsion Thrust Vector Control
Rocket Propulsion Contents: Review Types of Rockets Examples
[Cory Alban] [Mission Ops] [Locomotion]
[Andrew Damon] [Mission Ops]
Analysis of Rocket Propulsion
Week 6 Presentation Thursday, Feb 19, 2009
Attitude, Lunar Transfer Phase
Energy Transformation Flow Charts
Three-Body Trajectory Model and Spiral Transfer Matching
Lunar Lander Propulsion System
Lunar Descent Slide Suggestions & Questions
Lunar Descent Trajectory
Orbital Transfer Vehicle (OTV) Power Systems
Junichi (Jun) Kanehara 03/06/2008 Trajectory The Winner of the Balloon, 5[kg] case (LB-HA-DA-DA_v125) & New Version of Trajectory 3-D Plots AAE 450 Spring.
Potential Energy.
Lunar Descent Trajectory
Daniel Chua 31 January 2008 Trajectory Simulation Validation of Drag Loss Model – Constant Steering After First Stage Assisted by Amanda Briden, Elizabeth.
Alternative Locomotion Concept Feasibility Study
Lunar Descent Trajectory Optimization
MOMENTUM (p) is defined as the product of the mass and velocity -is based on Newton’s 2nd Law F = m a F = m Δv t F t = m Δv IMPULSE MOMENTUM.
Week 4 Presentation Thursday, Feb 5, 2009
Launch Vehicle Selection Spring Cannon Launch Vehicle Alternatives
Momentum and Impulse SPH4U.
1st language words & bits 2nd language words & bits
Final Slides Attitude Control System (ACS) – Lunar Transfer
Daniel Chua 28 February 2008 Trajectory Optimization Group (CAD Group) Balloon Launch Trajectories (*B-HA-DA-DA) (5kg angles found by Jun, 1kg angles.
Presentation transcript:

[Kara Akgulian] [Mission Ops] Lunar Orbit Circularization Toy Ball Materials Lunar Access with Ground Tracking February 26, 2009 [Kara Akgulian] [Mission Ops]

[Kara Akgulian] [Mission Ops] Impulse Thrust Solid Only Boost of: 10m/s, 25m/s, 50m/s, 100m/s, 200m/s Split Between: 1st Orbit, 1st and 2nd Orbits and 1st, 2nd and 3rd Orbits 3 Orbits: 1.) rp=1837.4 km ra=50000 km 2.) rp= 2737.4 km ra=525000 km 3.)rp= 2737.4 km ra=55000 km rp Δv Boost (km/s) mprop (kg)/Boost Launch Cost ($)/Boost Total Δv (km/s) mprop (kg) Total Launch Cost ($) Total Total TOF (Days) 1837.4 0.01 2.19 9,400 0.63 154.85 665,000.00 56.51 0.03 5.49 24,000 153.48 659,000.00 23.09 0.05 11.03 47,000 0.6 146.64 629,000.00 12.27 0.1 22.27 96,000 7.4 0.2 45.36 195,000 5.36 2737.4 0.5 119.92 515,000.00 67.31 27.42 14.51 8.54 0.4 94.16 404,000.00 5.83 3737.4 0.42 99.24 426,000.00 77.23 404,100.00 31 16.31 9.47 6.57 Chart shows only boost in first orbit Δv without boost is 0.38 m/s Isp= 280 s Mass of OTV=600 kg Launch Cost/kg=$4292 Cost’s are additional TOF= Time of Flight [Kara Akgulian] [Mission Ops]

[Kara Akgulian] [Mission Ops] Continuous Burn Electric Propulsion Solid Propulsion Assumptions: Constant Thrust at Optimum Level Working with Energy Equations Optimum Pointing Angle Costs are additional Total Δv (km/s) mprop (kg) Launch Cost ($) TOF(Days) Δv 0.63 21.99 94,000.00 45.45 Δv+25% 0.79 27.61 118,000.00 57.07 Δv-25% 0.48 16.42 70,000.00 33.93 Values Used: EP Isp= 1800 s Solid Isp= 280 s Mass of OTV=600 kg Launch Cost/kg=$4292 EP Mass Flow Rate=5.6x10-6 kg/s Solid mass Flow Rate=1.8 kg/s Total Δv (km/s) mprop (kg) Launch Cost ($) TOF(Min) Δv 0.63 156.22 670,000.00 1.45 Δv+25% 0.79 201.26 864,000.00 1.86 Δv-25% 0.48 113.72 488,000.72 1.05 [Kara Akgulian] [Mission Ops]

[Kara Akgulian] [Mission Ops] Backup Slides Δv split between the first two orbits rp Δv Boost (km/s) mprop (kg)/Boost Launch Cost ($)/Boost Total Δv (km/s) mprop (kg) Total Launch Cost ($) Total Total TOF (Days) 1837.4 0.01 1.09 5,000 0.64 156.23 671,000.00 112.8 0.03 2.74 12,000 0.63 153.48 659,000.00 45.26 0.05 5.49 24,000 23.09 0.1 11.03 47,000 0.6 146.64 629,000.00 12.27 0.2 22.27 96,000 7.4 2737.4 4,700 0.51 121.24 520,000.00 134.56 0.5 119.92 515,000.00 53.96 27.42 14.51 8.54 3737.4 4,600 0.42 99.24 426,000.00 154.1 0.41 97.33 418,000.00 61.6 0.4 94.16 404,000.00 31 16.31 9.47 [Kara Akgulian] [Mission Ops]

[Kara Akgulian] [Mission Ops] Δv split between the first three orbits rp Δv Boost (km/s) mprop (kg)/Boost Launch Cost ($)/Boost Total Δv (km/s) mprop (kg) Total Launch Cost ($) Total Total TOF (Days) 1837.4 0.01 0.73 3,000 0.63 155.77 669,000.00 169.01 0.03 1.82 7,800 67.79 0.05 3.66 16,000 34.21 0.1 7.33 31,000 17.7 0.2 14.76 63,000 0.6 146.64 629,000.00 9.76 2737.4 0.51 121.68 522,000.00 201.88 0.5 119.92 515,000.00 80.69 40.65 20.9 0.47 111.23 477,000.00 11.28 3737.4 3,100 0.42 99.24 426,000.00 231.04 98.39 422,000.00 92.4 46.5 0.4 94.16 404,000.00 23.58 12.8 [Kara Akgulian] [Mission Ops]