Accelerator Physics and Engineering Update Jan 6, 2010

Slides:



Advertisements
Similar presentations
Femtosecond Pump / Probe Operation and Plans at the LCLS
Advertisements

SLAC National Accelerator Center
RF / Laser Timing for 5/20/14 Frisch. Requirements, Jitter and Drift Looking for 100fs Pk-Pk measurements – 30fs RMS. (state of the art) Jitter:
TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
James Welch October 30, FEL Commissioning Plans J. Welch, et. al. FEL Commissioning Plans J. Welch, et. al. Accelerator.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
NanoBPM schedule California Institute of Technology Toyoko Orimoto Cornell University Robert Meller DESY Vladimir Vogel KEK Hitoshi Hayano, Yosuke Honda,
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Beam Diagnostics Collaboration Meeting March 18 th 2015 at Australian Synchrotron Mario Ferianis – Elettra.
IPBSM status and plan ATF project meeting M.Oroku.
IP-BSM Improvement Work N. Terunuma 2012/6/26 ATF2 Project Meeting.
1 A ccelerator P hysics and E ngineering Josef Frisch Tonee Smith Clive Field Alan Fisher Henrik Loos Jeff Rzepiela Mark Petree Steve Smith Jim Welch Glen.
SPPS, Beam stability and pulse-to-pulse jitter Patrick Krejcik For the SPPS collaboration Zeuthen Workshop on Start-to-End Simulations of X-ray FEL’s August.
ATF Instrumentation Status and Planning 3 December 2007 Juan Cruz, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, John Wray.
ATF1/2 laser-wires Stewart T. Boogert on behalf of UK Extraction line laserwire collaboration A. Aryshev, G. Blair, S. Boogert, A. Bosco, L. Corner, L.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
Transverse Profiling of an Intense FEL X-Ray Beam Using a Probe Electron Beam Patrick Krejcik SLAC National Accelerator Laboratory.
EO sampling technique for femtosecond beam characterization
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
1 Henrik Loos 1 13 Sep 2011 APE Meeting Recent Activities H. Loos 09/13/2011.
Compton Experiment at ATF Compton Meeting at LAL Orsey 2-Dec-2008 Tsunehiko OMORI (KEK) with many thanks to Compton collaborators.
Diagnostics Overview for the LCLS Presented by Josef Frisch For the LCLS ANL / LBNL / LLNL / SLAC.
NON-INTERCEPTING DIAGNOSTIC FOR HIGH BRIGHTNESS ELECTRON BEAMS USING OPTICAL DIFFRACTION RADIATION INTERFERENCE (ODRI) A. Cianchi #1,2, M. Castellano 3,
1 ATF 2 Nanobpm (Q BPM) Electronics. Mark Slater: Cambridge Yury Kolomensky, Toyoko Orimoto: UCB Stewart Boogert, Steve Malton, Alexi Liapine: UCL Mike.
IPBSM Operation 11th ATF2 Project Meeting Jan. 14, 2011 SLAC National Accelerator Laboratory Menlo Park, California Y. Yamaguchi, M.Oroku, Jacqueline Yan.
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
Taikan SUEHARA et al., LCWS2007 & DESY, 2007/06/01 R&D Status of ATF2 IP Beam Size Monitor (Shintake Monitor) Taikan SUEHARA, H.Yoda, M.Oroku,
Management Sunspots Quality Emittance IP3 Aberrations Grounding CSR APE Accelerator Physics and Engineering Providing a new paradigm for a forward-looking.
Lessons Learned From the First Operation of the LCLS for Users Presented by Josef Frisch For the LCLS March 14, 2010.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
What did we learn from TTF1 FEL? P. Castro (DESY).
XFEL Beam Dynamics Meeting Bolko Beutner, DESY First results of micro-bunching and COTR experiments at FLASH Bolko Beutner, Winfried Decking,
SL_THOMSON C. Vaccarezza on behalf of the SL_Thomson team.
Taikan SUEHARA, Joint Meeting of PRPPC in Honolulu, Hawaii, 2006/10/30 Laser Fringe Stabilization of 35nm IP Beam Size Monitor (Shintake monitor) for ATF2/ILC.
Operation and Upgrades of the LCLS J. Frisch 1,R. Akre 1, J. Arthur 1, R. Bionta 2, C. Bostedt 1, J. Bozek 1, A. Brachmann 1, P. Bucksbaum 1, R. Coffee.
LCLS Commissioning & Operations High Level Software
Bunch Length Monitor Development
LCLS_II High Rep Rate Operation and Femtosecond Timing
Emittance measurements for LI2FE electron beams
Slice Parameter Measurements at the SwissFEL Injector Test Facility
ILC Phase Reference Distribution R&D
Beam Size Monitor Model
ATF nanoBPM system - nanoGrid ATF2 Movers TTF HOM – dipole / monopole
Accelerator Physics and Engineering Update Jan 6, 2010
LCLS Commissioning & Operations High Level Software
Thermal emittance measurement Gun Spectrometer
Optical Design of a Broadband IR Spectrometer
What am I working on… H. Loos 08/02/2010.
Diagnostics overview and FB for the XFEL bunch compressors
Recent Activities H. Loos 02/15/2011.
LCLS Injector Diagnostics
X-Ray Transport, Optics, and Diagnostics WBS Alan J
High Level Physics Applications for LCLS Commissioning
Linac Diagnostics Patrick Krejcik, SLAC April 24, 2002
Breakout Sessions SC1/SC2 – Accelerator Physics
Transverse size and distribution of FEL x-ray radiation of the LCLS
First results of micro-bunching and COTR experiments at FLASH
Diagnostics RF and Feedback
Linac Diagnostics Commissioning Experience
Diagnostics overview Beam profile monitors Cherenkov radiators Summary
Injector Diagnostics Status
LCLS Longitudinal Feedback System and Bunch Length Monitor Juhao Wu Stanford Linear Accelerator Center LCLS DOE Review, February 08, 2006 LCLS longitudinal.
Enhanced Self-Amplified Spontaneous Emission
Injector Drive Laser Technical Status
Breakout Session SC3 – Undulator
APE Meeting 3-Way collaboration meeting, Spring 8 (Japan), Oct 31 to Nov 2. Accelerators: TCAV, SACLA operations Photons: Intensity measurement, temporal.
Presentation transcript:

Accelerator Physics and Engineering Update Jan 6, 2010 Josef Frisch Tonee Smith Clive Field Alan Fisher Henrik Loos Christopher Behrens (NEW!) Nate Lipkowitz (NEW!) Jeff Rzepiela Mark Petree Steve Smith Jim Welch Glen White Walter Wittmer Mark Woodley Gerald Yocky

APE: What we do Physics Engineering Operations Whatever it takes to make accelerators work Some long term planned projects Some kludges to get systems working E-beam optics Light optics X-rays Detectors Applications Modeling RF Electronics Acoustics Vacuum Mechanical PowerPoint

Beam Arrival Time Monitor Problem Phase cavity difference noise has been increasing since October Increase from 12 to ~50 femtoseconds RMS Difficult to debug: still smaller than raw beam jitter, no signal when beam is off. Not yet the dominant noise source, but will be soon! In addition to short term fix, need an independent check: 3rd phase cavity?

Future Timing Previous meeting mentioned using an optical / X-ray cross-correlator. X-rays Reflected optical beam measured on array sensor Laser GaAs or similar Tests at SXR (W. Schlotter et al) have demonstrated 60fs RMS single shot X-ray to laser optical timing measurement. Note that electronic timing will still be needed for “crude” 100fs timing

Cross Correlator (very preliminary) (SXR) M. Beye B. Schlotter W. Schlotter et al. (LCLS)

Materials Damage and Wavefront Distortion Tests Fused Silica damages Damage Speckle from Be attenuators led to search for alternate materials Damage and wave front distortion tests indicate that Al2O3, Diamond and SiC all are OK. 3D map of damage to SiO2 Sample

Be Lens to be Installed in LCLS X-ray diagnostics chamber Reduce divergence to (incorrect) design B. Lenegeler, J. Krzywinski, E. Kraft, et al. (Engineering, LCLS, APE, etc)

Broadband IR Spectrometer for Bunch Length Measurement Measure spectrum of OTR light from short bunches to estimate bunch length Need single shot, very broadband ~50:1 low resolution (25%) spectrometer Operating range ~0.8 –40 microns Optics design done, prototype parts on order Parabolic mirror Prism, KRS-5 Tilted image plane corrects aberrations OTR foil Christoph Behrens Henrik Loos Jennifer Loos Sasha Gilevich Pyroelectric Array detector Parabolic mirror

THz Emitted THz power GaAs z-scan THz system for LCLS now being commissioned. Working with Pulse, and Stanford have first demonstration experiments with THz Alan Fisher will discuss in detail in next talk. Emitted THz power GaAs z-scan D. Daranciang et. Al.

LHC Synchrotron Light Monitor Lead Ions at 2.3 TeV A. Fisher will discuss in next talk

ATF2 Recent Results 4 OTR screens now provide reproducible emittance measurements in less than a minute, rather than hours for the wire scanners (1.5 Hz beam). 25 Cavity BPMs now working at <50nm resolution Spot size monitor not working in high resolution mode (ATF2 group) Automated Dispersion Correction G. White, M. Woodley, S. Boogert, T. Smith

Other Projects 120Hz upgrades FACET bunch length monitors Time-slot aware feedbacks: Big project from Controls and APE. Accelerator now at 120Hz with good time-slot. FACET bunch length monitors (similar to LCLS) Diagnostics and control applications Ongoing efforts to automate machine operations Thermal-acoustic X-ray calorimeter Passed Vacuum check Install in late January.