HMA Warranties Seminar for CALTRANS Lee Gallivan FHWA Indiana Division April 3 rd, 2003.
Advertisements

Managing a Statewide Network An overview of the CDOT Pavement Management Program Eric Chavez Stephen Henry
Pavement Rehabilitation Method
Comparative Analysis of Emulsion and Hot Asphalt Cement Chip Seal Performance Douglas D. Gransberg, P.E., C.C.E. University of Oklahoma.
HMA Design (Surface) The surface course is the layer in contact with traffic loads and normally contains the highest quality materials. It provides characteristics.
CONINFRA º TRANSPORTATION INFRASTRUCTURE CONFERENCE São Paulo – July 29th – 31th, 2009 CONINFRA º TRANSPORTATION INFRASTRUCTURE CONFERENCE.
Michigan Department of Transportation Perpetual Pavement Rep. Rick Olson’s 2012 Best Practices Conference on Road and Bridge Maintenance Curtis Bleech.
Perpetual Pavements Concept and History Iowa Open House
Full-Depth Reclamation Using a Cement Slurry Spreader Attached to a Ready Mixed Concrete Truck W. Spencer Guthrie, Ph.D., Associate Professor Charles A.
Cold In Place Recycling City of Charlotte September, 2011 Amy E. Schoonover, PE Director of Public Works.
Guide for Mechanistic-Empirical Design of New and Rehabilitation Pavement Structures By Matt Mason.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
HMA Pavement Recycling and Reconstruction
Example 3: Determination of M r = 3/8. Example 4: Pavement Thickness Given M r = 10,000 psi (69 MPa) and ESAL = 10 6, design the thickness of a pavement.
Pavement Maintenance II
Composite Pavements National Pooled Fund TPF-5(149) Task 1 Update Mihai Marasteanu.
NETWORK LEVEL EXAMPLES OF PMS İNŞ.YÜK. MÜH. VEYSEL ARLI.
Influence of Pavement Condition on Project Selection
Research Findings from the NCAT Test Track APAI Winter Conference Indianapolis, December 14, 2010.
Perpetual Pavement Design John D’Angelo Federal Highway Administration Washington, DC Canadian User Producer Group for Asphalt Saskatoon, Saskatchewan.
MICHIGAN EXPERIENCE WITH WARRANTY WORK. Warranty Program History Why Warranties ? Warranty Specifications Experience & Lessons Learned.
A Guidance, Parameters & Recommendations for Rubblized Pavements July 2006.
HBP Warranties – The Cost Benefit Evaluation Begins By: Jay Goldbaum, P.E. Colorado Department of Transportation Pavement Management and Design Program.
PERFORMANCE MODELS. Understand use of performance models Identify common modeling approaches Understand methods for evaluating reliability Describe requirements.
1 Hot-Mix Asphalt and Flexible Pavement Design: the MEPDG Kevin D. Hall, Ph.D., P.E. Professor and Head, Dept. of Civil Engineering University of Arkansas.
Addressing Localized Roughness at the Project Level by Gary Higgins.
BUSINESS SENSITIVE 1 Pavement Health Track Analysis Tool for Determining the Health of Pavement Networks Sponsored by FHWA Contractor: Battelle/ARA Team.
2003 Warranty Presentations Caltrans WARRANTED HMA PAVEMENTS PAVEMENTS.
Session 4 Preventive Maintenance Treatments. Learning Objectives 1.Identify typical preventive maintenance techniques used on HMA and PCC pavements 2.Identify.
Ultra Thin Bonded Wearing Coarse Sponsored by: Minnesota LTAP Center Presented by: Michael Marti, P.E. SRF Consulting Group, Inc. Dan Wegman, P.E. SemMaterials.
DISSIPATED ENERGY STUDY OF FATIGUE IN AIRPORT PAVEMENTS PHD Candidate: Shihui Shen Advisor: Prof. S. H. Carpenter FAA Project Review Nov. 9, 2005.
Using Reflective Crack Interlayer-
2011 S URFACE T REATMENT R EPORT FOR THE T RANSPORTATION C OMMISSION W ORKSHOP Presented by: Stephen Henry Pavement Management Program September
HMA Warranties The Wisconsin Experience Presentation to the California Department of Transportation.
Chip Seal Best Practices by: Larry Galehouse, P.E., P.S., Director National Center for Pavement Preservation.
Russian Engineers Training March 2011
Presented to: REDAC By: Navneet Garg, Ph.D. Date: March 15, 2016 Federal Aviation Administration RPA P2: National Airport Pavement & Materials Research.
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
Presented to: REDAC By: Navneet Garg, Ph.D. Date: March 15, 2016 Date: March 15, 2016 Federal Aviation Administration Full-Scale Testing – Perpetual Pavement.
Alabama Asphalt Pavement Association
European Asphalt Pavement Warranties Scan
Village of Woodridge 2011 Pavement Analysis
Thin Hot Mix Asphalt Overlays PennDOT Research Findings
Haritha Musty and Mustaque Hossain Kansas State University MATERIALS
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Barriers to Implementation of In-Place Recycling
Research Implementation WHRP Flexible Group
Presenters: Sumon Roy1 and Badrul Ahsan1
Pavement condition index calculation
Update on the current APT Project in Texas
ALDOT Pavement Preservation Policy
Barry Paye, PE Chief Materials & Pavement Engineer Wisconsin DOT
Implementation of pavement preservation treatments
Pavement Design  A pavement consists of a number of layers of different materials 4 Pavement Design Methods –AASHTO Method –The Asphalt Institute Method.
Introduction to Pavement Design
2018 Pavement Workshop May 23-24, 2018
Pavement Preservation
Performance Assessment of 100% Recycled Hot Mix Asphalt
Development of An Advance Overlay Design System Incorporating Both Rutting and Reflection Cracking Requirements Rick Collins TxDOT.
Considerations FOR more durable hma pavements
AASHTOWare Pavement-ME Design Software: Materials Library
Deterioration and Failure Mechanisms
What’s New In Pavement Design
Field Performance of Foaming Warm Mix Asphalt Pavement
Pavement Structural Analysis
Pavement Overlay Design
Polynomial and Linear Factors
NRRA Recycling Economic & Environmental Benefits
NRRA Pavement Workshop 2019
Superpave5 Superpave Design at Five Percent Air Voids
Presentation transcript:

Colorado State University Performance of Three Popular Rehabilitation Strategies for HMA Pavements Scott Shuler, Ph. D., P. E. Colorado State University

Project Selection Criteria 10-year design life, ½ mile minimum length Constructed 1997 to 2001. The following 175 projects met this criteria.

Projects Studied Type of Treatment Number of Projects Two to Four Inch Overlay 73 Cold planing and overlay 57 Heater Scarification and Overlay 19 Full depth reclamation and overlay 6 Heater remix and overlay Stone matrix asphalt overlay 5 Cold recycle and overlay Heater repaving and overlay 4 Total 175

Performance Based on: Smoothness (IRI) Rutting Cracking As a function of: Asphalt binder Traffic NHS Gradation CDOT Region Environment

Data Analysis Criteria Distress increases with time Correlation Coefficient > 0.50 Three projects.

Summary

Smoothness

Rutting

Fatigue

Transverse Cracking

Longitudinal Cracking

Conclusions Cold planing with an overlay outperforms the simple overlay Cold planing with an overlay and the simple overlay tend to outperform heater scarification Pavement condition where heater scarification and overlay was the rehabilitation method tended to be poorer than the other two rehabilitation methods. A greater positive effect on performance occurred when polymer modified asphalt was used with heater scarification compared with cold planing. Pavement condition tended to be below the Zero Remaining Service Life Threshold (ZRSL) for all performance indicators except fatigue cracking. The condition of the pavements where cold planing and heater scarification were utilized exceeded the ZRSL threshold.

Conclusions, continued Rehabilitation would have been warranted earlier in the life of the pavements which reached ZRSL at the time of rehabilitation. As a result, the expected life of the rehabilitation strategies utilized on these pavements may have been shorter than could be expected had rehabilitation been done before distress reached this high level. Although a linear regression was used to compare the rates of change of distress through time for the first six years’ service for this research, it is likely a non-linear model would be needed to predict performance beyond this time.

Questions ?