Has Rate of Changed for Southeast Alabama Medical Center?

Slides:



Advertisements
Similar presentations
Understanding Your Habit: Flow Charts & Lists of Routines Farrokh Alemi Ph.D.
Advertisements

Tutorial on Tukey Charts Farrokh Alemi, Ph.D. Sunday, 11/25/2007.
Working With Excel Coin Density. Calculate Density We are going to select the data you need to use. – From the data table, copy and paste the lines that.
Time Between Charts Farrokh Alemi, Ph.D.. Steps in construction of time in between charts 1. Verify the chart assumptions 2. Select to draw time to success.
Tutorial on Risk Adjusted P-chart Farrokh Alemi, Ph.D.
Rev. 09/06/01SJSU Bus David Bentley1 Chapter 10 – Quality Control Control process, statistical process control (SPC): X-bar, R, p, c, process capability.
X AND R CHART EXAMPLE IN-CLASS EXERCISE The following collection of data represents samples of the amount of force applied in a gluing process: Determine.
Using Excel to Plot Farrokh Alemi, Ph.D.. Objectives Given a set of data plot a control chart using Excel software.
XmR Chart Farrokh Alemi, Ph.D.. Purpose of Control Chart  Real or random.  Tell a story of changes in outcomes of the process.
EXAMPLE 1 Describe the correlation of data Describe the correlation of the data graphed in the scatter plot. a. The scatter plot shows a positive correlation.
Statistics 300: Introduction to Probability and Statistics Section 2-2.
PAIRED TEST Farrokh Alemi Ph.D.. Framework for Hypothesis Testing.
STATISTICAL GRAPHS.
Go to Index Analysis of Means Farrokh Alemi, Ph.D. Kashif Haqqi M.D.
Introduction to Control Charts: XmR Chart
VARIANCE & STANDARD DEVIATION By Farrokh Alemi, Ph.D. This lecture is organized by Dr. Alemi and narrated by Yara Alemi. The lecture is based on the OpenIntro.
Thursday, February 6, 2014MAT 312. Thursday, February 6, 2014MAT 312.
Mass s Tailored to Individuals Farrokh Alemi, Ph.D.
Tuesday, February 11, 2014MAT 312. Tuesday, February 11, 2014MAT 312.
Thursday, February 13, 2014MAT 312. Thursday, February 13, 2014MAT 312.
HYPOTHESIS TESTING FRAMEWORK Farrokh Alemi Ph.D..
Analyses using SPSS version 19
Measures of Center vs Measures of Spread
Frequency Distribution ScoresFrequency Classes/Intervals – Determined after finding range of data. Class width is the range of each class/interval. Rule.
0 Calculation of Return on Investments Farrokh Alemi, Ph.D.
Quality Improvement Tools CHAPTER SIX SUPPLEMENT McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Math 310 Section 8.1 & 8.2 Statistics. Centers and Spread A goal in statistics is to determine how data is centered and spread. There are many different.
Task on Entry The number of siblings of students in a class is shown in the frequency table below. Draw a bar chart to represent the data. Number of SiblingsFrequency.
INFERENCE Farrokh Alemi Ph.D.. Point Estimates Point Estimates Vary.
Time To Missed Exercise Farrokh Alemi, Ph.D.. Why do it? You need to distinguish between random days of missed exercise from real changes in underlying.
Box and Whisker Plots Example: Comparing two samples.
Risk Adjusted X-bar Chart Farrokh Alemi, Ph.D. Based on Work of Eric Eisenstein and Charles Bethea, The use of patient mix-adjusted control charts to compare.
Process Control Charts By: Brian Murphy. Control Charts are an on-line process- monitoring technique. Used to determine if a process is capable or out.
The reading is 7.38 mm. The reading is 7.72 mm.
Date of download: 11/12/2016 Copyright © ASME. All rights reserved. From: Machine Tool Condition Monitoring Based on an Adaptive Gaussian Mixture Model.
October 20, 2016 Farrokh Alemi, PhD.
Support for English, maths and ESOL Module 7: Developing the personal maths skills of teachers and assessors Master class 4: Handling data.

Date of download: 12/22/2017 Copyright © ASME. All rights reserved.
X AND R CHART EXAMPLE IN-CLASS EXERCISE
Calculation of Present Value
Has Payment, for AMI, to above National Average Hospitals, Increased?
Merge Data & Calculate Average
P-Chart Farrokh Alemi, Ph.D..
F - Ratio Table Degrees of Freedom for the Factor
SQL for Cleaning Data Farrokh Alemi, Ph.D.
Farrokh Alemi, PhD Sunday, January 29, 2017
Comparison of Rates Question 1
Farrokh Alemi, Ph.D. Revised by Akhil Anto
Has Rate of Hospitals Exceeding National Payment for AMI Changed?
Dead Patients Visiting
Causal Control Chart Farrokh Alemi, Ph.D..
Comparing Data Displays in Box Plots
Analysis of Observed & Expected Infections
Box Plots.
P-Chart Farrokh Alemi, Ph.D. This lecture was organized by Dr. Alemi.
Statistics 2 Lesson 2.7 Standard Deviation 2.
MCC6.SP.5c, MCC9-12.S.ID.1, MCC9-12.S.1D.2 and MCC9-12.S.ID.3
Xbar Chart By Farrokh Alemi Ph.D
C.2.10 Sample Questions.
How to join the HK Speech Festival
C.2.8 Sample Questions.
Time between Control Chart: When Is Harm Reduction Drug Use?
Thing / Person:____________________ Dates:_________________
C.2.8 Sample Questions.
Limits from Pre- or Post-Intervention
Exponential Distribution Ends Up Normal
Categorical Data By Farrokh Alemi, Ph.D.
Pps Download Center ©
Tukey Control Chart Farrokh Alemi, Ph.D.
Presentation transcript:

Has Rate of Changed for Southeast Alabama Medical Center? Farrokh Alemi, Ph.D.

Download, Unzip, Rename Data To H-YYYY-MM

Import Tables into New Database From 2015 01 Database From 2015 04 Database From 2015 05 Database From 2015 07 Database From 2015 10 Database From 2015 12 Database From 2016 05 Database From 2016 08 Database From 2016 11 Database

Select Hospital & Measure ID for 2013-2014 Provider ID Measure Start Date Measure End Date Score Sample SCIP_INF_3 010001 04/01/2013 03/31/2014 98 324 Select Measure Data & Database Dates Differ Select Provider

Repeat for All Time Periods Measure ID Provider ID Measure Start Date Measure End Date Score Sample SCIP_INF_3 010001 04/01/2013 03/31/2014 98 324 07/01/2013 06/30/2014 330 10/01/2013 09/30/2014 329 01/01/2014 12/31/2014 332 04/01/2014 03/31/2015 99 337 07/01/2014 06/30/2015 340 10/01/2014 09/30/2015 100 256 01/01/2015 170 Ignore Duplicated Data Time Period

Calculate Control Limits Midway Point Rate of Overuse Upper Limit Lower Limit 9/30/2013 0.302 0.377 0.275 12/30/2013 0.297 0.276 4/1/2014 0.298 7/2/2014 0.295 9/30/2014 0.294 0.376 12/30/2014 0.291 4/1/2015 0.391 0.384 0.269 5/17/2015 0.582 0.397 0.256 Midway Point = DATE(YEAR(start), MONTH(start), DAY(start)+(start-end)/2) Grand Rate = SUM(Score)/SUM(Sample) Upper Limit =Grand Rate + 1.96*SQRT((Grand Rate*(1-Grand Rate))/Sample)

Plot the Control Chart Limits spread wider, due to small sample Make each line as separate scatter plot; then copy into a single plot

Overuse of Prophylactic Antibiotics in Southeast Alabama Medical Center