Monday 08:30 – 11:00 Access for: LBDS beam 2 problems: TSU unit changed RQTD.A67B1: controller for the current lead heater changed RQS.A67B1 power converter.

Slides:



Advertisements
Similar presentations
Mystery unable to inject: timing, BIS, SIS… 8:15 to 12: 30 Injection/LBDS studies  Fine delay adjustment of injection kickers  Synchronization of MKI.
Advertisements

Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
PGC tests Test procedure and acceptance criteria for the Powering of Group of Circuits EDMS No
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Wednesday 5 th December until this morning 06:59 Stable beams fill #3375, L ~ 6.8e33 cm-2s-1. 10:40 Beam dump, trip of RD2.R5. Integrated L 72 pb-1 in.
LHC status Friday 11 th September 2015 Coordination: Mike Lamont, Jorg Wenninger.
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 3rd October - morning
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Wednesday September 14th
Summary Friday h38: Ramp down and pre-cycle.
Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.
Summary of week 7 Hardware Commissioning:
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
A/N 26 16:00 Access finished problem with the BLM test. one crate is failing the beam permit test. Fixed. Access required in sector 78 for QPS to fix a.
Monday 11/07: Recovery Plenty of accesses.
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Status of LHC Operations
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Monday 6th August & night
LHC Morning Meeting - G. Arduini
Summary of week 22 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Wednesday 31 October: Morning
Summary of Week 13 G. Arduini, B. Holzer
Summary of Week 16 G. Arduini, J. Wenninger
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Scrubbing progress - 09/12/2012
Friday 31st August & night
Friday March 4th 08h32: Access for beam dump system.
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Tuesday 20 March 2012.
Friday 14th December - morning
Monday Morning – recovery from cryo.
Monday February 28th 8h00: Injection
Thursday :00: Physics fill from the night shift
Yesterday Power back around lunchtime Access until 12:30
Friday Morning 7:30 injection for fill 2908
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
LHC Morning Meeting - G. Arduini
Tuesday morning 08:30-09:00 Squeeze with probe.
Thursday 26th July 13:21 Fill 2880 beam dumped
07/08/2010 Fill #1264 dump at 02:14:38.
Thursday 22 September 2011.
Saturday :42 stable beams fill 3541
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
LHC Morning Meeting - G. Arduini
Wednesday 23/2 Thanks CRYO!!!.
LHC Status Fro Morning 9-Sep
Mon 2/4 08:00-13:00: Access for: Experiments Power converters BBQ
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Another Immortal Fill….
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
31/3/2010 Difficult day… but at the end stable beams.
15/12/2009 Vacuum interlock in sector 78 understood  out-gassing of a Penning gauge ignited as a result of ionization or dust arcing In conclusion: NO.
Wednesday 6.10 Morning: Quench test at 450 GeV
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Presentation transcript:

Monday 08:30 – 11:00 Access for: LBDS beam 2 problems: TSU unit changed RQTD.A67B1: controller for the current lead heater changed RQS.A67B1 power converter replaced and tested 12:00 – 13:30 Machine protection tests without beam 13:40 by trip of RD1.R5 until 19:40 (temperature of the building?) In the shadow: Heat run for Sector 12 and 23 Quench heater power supply (dipole) A13.R1 discharging – access to repair it loaded new compensation coefficients for Main Bend QPS in Sector 12  we should have more margin now to pulse TI2 without problems Test of faster ramp-down of Q4.R2 (presently the slowest)  reduction by >15 mins in the ramp down RQT13.L7B1 back in use (limited to 50 A) as well as RCBCV10.R5B1 (it was out of the SOC) HWC of RCBVY5.L4B2

Monday 20:00 – 21:30 Communication problem with Injection BIC 21:30 Finally injecting 23:20: 3.5 TeV with beam 00:40 – 02:00 Squeeze to 1.5 m 02:00 – 07:00 Ramp down and BIC/Timing problem 07:00 Injecting

Ramp down speed-up Q4.R2: slowest element in the ramp down Before Now with power converter in open loop during ramp-down (to be implemented in the ramp down sequence). >15 mins shorter

Ramp – only static part of b3 model

Ramp – only static part of b3 model The Q' estimates are clamped above 30 units and below -15 Decay of about 7 units on flat-top plateau nicely visible. R. Steinhagen

Ramp The values of the Q-trims on the attached plot are not correct and should be divided by 3500/450. For some reason the OFC didn't get the correct energy. R. Steinhagen

BEAM 1 beam sizes (mm) F. Roncarolo Real blow-up, correlated to losses at the beginning of the ramp ramp (all other ‘steps’ = BSRT setting up) F. Roncarolo

BEAM 2 beam sizes (mm) F. Roncarolo Real blow-up, correlated to losses at the beginning of the ramp ramp (all other ‘steps’ = BSRT setting up) F. Roncarolo

Squeeze – b*=7m Tune and coupling correction S. Redaelli, M. Lamont

Squeeze – b*=3.5 m Tune and coupling correction S. Redaelli, M. Lamont

Squeeze – b*=2 m Tune and coupling correction. Beam 2 lost during coupling compensation S. Redaelli, M. Lamont

Squeeze – b*=1.5 m Tune and coupling correction. S. Redaelli, M. Lamont

Plan Tue AM MPS tests + Access/LBDS link check (DSO) – no beam Tue PM Test ramp + Test squeeze (Beta beating measurements) Tue Night Test dumps on the ramp (1.4 and 2.4 TeV) + pre-cycle and decay measurement Wed AM Cryo intervention in point 2 8:30 meeting

Access Cryo intervention in Point 2 scheduled for Wednesday 23/2 Access requests: DFBAA-LCM pressure controllers RCBV11.R8B1 – 60 A power converter RSS.A78B1 – power converter problem UPS problem in US45 Power converter RD1.R5. Issue with the temperature of the building