Simulation Update S. Margetis.

Slides:



Advertisements
Similar presentations
Analysis BNL J.Bouchet, J.Joseph 1. Cuts Used in MuKpi macro pure D0 : 950 MuDst files (400 possible D0s per file) - |Zvertex| < 20 cm - NTpcHits.
Advertisements

W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
1 Using the pHE data to measure the beam e ’s from  + decay David Jaffe and Pedro Ochoa March 13 th 2007  Introduction  Antineutrino selection  Feasibility.
LMD study Anselmo Cervera Villanueva Université de Genève ISS teleconference 8/12/2005.
Chris Rogers, MICE CM16 Wednesday Plenary Progress in Cooling Channel Simulation.
Algorithms and Methods for Particle Identification with ALICE TOF Detector at Very High Particle Multiplicity TOF simulation group B.Zagreev ACAT2002,
Topological D-meson Reconstruction with STAR Using the Silicon Vertex Tracker (SVT) Sarah LaPointe Wayne State University SVT review, BNL, July 7 th /8.
Slow Neutron Background Simulation " Long-lived neutrons created, diffuse around collision hall " They get captured by nuclei, emitting a photon " Compton.
1 G4MICE Analysis of KEK Test Beam Aron Fish Malcolm Ellis CM15 10th June 2006.
1 N. Davidson Calibration with low energy single pions Tau Working Group Meeting 23 rd July 2007.
Responsibility on Next Beam Test Jianchun Wang Syracuse University BTeV meeting 06/27/01.
New MC set summary Old MC set summary 400k events generated for each set in STARlight Radius adjusted for matching exponential slope of t-spectrum Fully.
Chris Rogers, Analysis Parallel, MICE CM17 Progress in Cooling Channel Simulation.
1 G4MICE TOF Reconstruction & KEK Test Beam Analysis Update Aron Fish Tracker Phone Conference May 25, 2006.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
PPR meeting - January 23, 2003 Andrea Dainese 1 TPC tracking parameterization: a useful tool for simulation studies with large statistics Motivation Implementation.
Jim Thomas - LBL 1 HFT Performance & Simulation Studies Experience Gained by Simulating One Track at a Time Jim Thomas Lawrence Berkeley National Laboratory.
CBM Collaboration Meeting 1 Simulation Status V. Friese.
Simulation issue Y. Akiba. Main goals stated in LOI Measurement of charm and beauty using DCA in barrel –c  e + X –D  K , K , etc –b  e + X –B 
NSW background studies Max Bellomo, Nektarios Benekos, Niels van Eldik, Andrew Haas, Peter Kluit, Jochen Meyer, Felix Rauscher 1.
Charmonium feasibility study F. Guber, E. Karpechev, A.Kurepin, A. Maevskaia Institute for Nuclear Research RAS, Moscow CBM collaboration meeting 11 February.
Impact parameter resolution study for ILC detector Tomoaki Fujikawa (Tohoku university) ACFA Workshop in Taipei Nov
TOF, Status of the Code F. Pierella, Bologna University and INFN TOF Offline Group ALICE Offline Week, June 2002.
November 2013 Review Talks Morning Plenary Talk – CLAS12 Software Overview and Progress ( ) Current Status with Emphasis on Past Year’s Progress:
Y.Fisyak, BNL - STAR Upgrade workshop, 12/2/ Integrated Tracker – STAR tracking framework of the future update on  status and  perspective IT(TF)
Simulation of the energy response of  rays in CsI crystal arrays Thomas ZERGUERRAS EXL-R3B Collaboration Meeting, Orsay (France), 02/02/ /03/2006.
1 Behaviour of the Silicon Strip Detector modules for the Alice experiment: simulation and test with minimum ionizing particles Federica Benedosso Utrecht,
Simulation of GOSSIP/GridPix Nominal Detector, and GOSSIP in ATLAS.
HFT-prototype BUR considerations for Run-13 The main goal of the HFT engineering run will be system verification and correction; this includes the study.
1 Simulation Update S. Margetis. 2 Issues Since in August most people were gone the action items are the still the same as listed in Jim’s slide for the.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
HFT-prototype BUR considerations (Quantitative) What physics is possible in Run-13 assuming some (prototype) sectors are there? Relates to how long would.
Overview of a Plan for Simulating a Tracking Trigger (Fermilab) Overview of a Plan for Simulating a Tracking Trigger Harry Cheung (Fermilab)
10/25/11update BFC with pixl patch1 Update on the simulation with pixl patches BFC chain was working with TPC+full PiXL but crashes when I used patches.
STAR J/  Trigger in dA Manuel Calderon for the Heavy-Flavor Group Trigger Workshop at BNL October 21, 2002.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
D 0 reconstruction: 15 AGeV – 25 AGeV – 35 AGeV M.Deveaux, C.Dritsa, F.Rami IPHC Strasbourg / GSI Darmstadt Outline Motivation Simulation Tools Results.
Software Tools for Layout Optimization (Fermilab) Software Tools for Layout Optimization Harry Cheung (Fermilab) For the Tracker Upgrade Simulations Working.
1 NCC Task Force Richard Seto NCC Task Force Meeting Jan 8, 2007 BNL.
Working group on photon vetoes Meeting on June 7 th : 1.Status of Geant4 simulations 2.Discussion on LAV structure 3.Discussion on readout 4.News on Spaghetti.
1 Performance of a Magnetised Scintillating Detector for a Neutrino Factory Scoping Study Meeting U.C. Irvine Monday 21 st August 2006 M. Ellis & A. Bross.
1 Geometrical efficiencies of a patch Pixel detector via GEANT J. Joseph, S. Margetis and J. Vanfossen Original note based on a MathCAD simulation by H.Wieman.
Progress Report on GEANT Study of Containerized Detectors R. Ray 7/11/03 What’s New Since Last Time?  More detailed container description in GEANT o Slightly.
David Silvermyr Lund University for the PHENIX Collaboration Early global event results using the PHENIX Pad Chambers at RHIC.
1 A Study On Photonic Electrons In The Endcap EMC  Purity of electrons from MC simulation & real data  Reconstructed photonic electrons Naresh Subba,KSU.
By: Daniel Coelho Matthew Szydagis Robert Svoboda Improving Electron / Gamma Separation LBNE Software Fermilab, ILFebruary 1, 2013.
ΜTPC Reconstruction Status Report (…mostly a late night / weekend project … ) D. A. Jensen March 1, 2007.
Brunel University London Field-off LiH Energy Loss Rhys Gardener CM45 – July 28th.
Feasibility of the detection of D 0 mesons in the NA61/SHINE experiment: Vertex detector for NA61/SHINE P. Staszel and Yasir Ali Jagiellonian University.
Yet another approach to the ToF-based PID at PANDA
Technical Specifications
gamma ray polarisation measurement
Software Overview S. Margetis Kent State University HFT CD0 Review.
Measurement of track length and time-of-flight hypothesis
Event “zero-time” determination with TOF detector
Muon stopping target optimization
Physics with the HFT prototype?
Track Finding.
Global PID MICE CM43 29/10/15 Celeste Pidcott University of Warwick
HARPO Analysis.
A New Measurement of |Vus| from KTeV
PIXEL patch efficiency
G0 Beam Polarization T. Horn, D. Gaskell Jefferson Lab
Progress in angular acceptance study
NKS2 Meeting with Bydzovsky NKS2 Experiment / Analysis Status
Background rejection in P326 (NA48/3)
The TOTEM T2 Telescope based on triple-GEM chambers
August 19th 2013 Alexandre Camsonne
Presentation transcript:

Simulation Update S. Margetis

Issues Since in August most people were gone the action items are the still the same as listed in Jim’s slide for the BNL meeting (next slide) Inclusion of ‘PileUp’ in full simulations Jim’s hand calculations show small effect (slide 4) Full simulation of IST-less configuration Some progress in understanding difference between hand and full D0 reconstruction efficiencies AOB, ie increase statistics for detail GEANT ‘Patch’ studies

Pileup – critical to selling the proposal A modest proposal Proposal geometry and configuration (TPC+SSD+IST2+IST2+PXL2+PXL1) with pileup without Reduced configuration with standard geometries (TPC+SSD+PXL2+PXL1) Does Pileup Matter? Does the configuration matter?

A Prediction – pileup doesn’t matter for a 200 sec detector Proposal configuration with pileup and UPC electrons Proposal configuration without pileup and without UPC electrons

Inlusion of PileUp in GEANT simulations - our current scheme Three sources Out of time events, UPC e, Beam background Out of time events are introduced as correlated background from parametrized minbias and zvertex shapes. Infinite momentum (straight line is assumed) UPC e and Beam background as white noise. Spiraling can be accounted but not as correlated noise. We need guidance about actual numbers here. Compromises are mostly seconf order effects and due to schedule

In full simulation we used realistic TPC (dead sectors/padrows etc) [perhaps not a good idea] Unassigned hits on tracks All hits

In full simulation Kaons decay properly. Now things are coming together Proposal plot Hand with Kaon decay

Summary Pile-up work has began We have a agreed upon scheme Handshake between Hand/GEANT seems feasible Tight but possible schedule for End-November review