Constructing WMATA’s Enterprise GIS: Strategy, Action, Issues

Slides:



Advertisements
Similar presentations
© Copyright 2007 Exempler Telecom Test Automation System Exempler - We pride ourselves with providing lightweight robust engineering solutions.
Advertisements

Polycom Unified Collaboration for IBM Lotus Sametime and IBM Lotus Notes January 2010.
Data Architecture at CIA Dave Roberts Chief Technical Officer Application Services, CIO CIA
Govern the Flow of Data: Moving from Chaos to Control
IT Asset Management Status Update 02/15/ Agenda What is Asset Management and What It Is Not Scope of Asset Management Status of Key Efforts Associated.
Jeremy Siviter, IBI Group, Project Manager May 18th, 2011
KEYS TO SUCCESS DATA PREPARATION AND ORGANIZATION
Distributed Data Processing
Hosted Exchange 2007 Enterprise Grade and Collaboration Solutions for Small and Medium Businesses.
DELIVERING SHAREPOINT AS A SERVICE
Enterprise Architecture Rapid Assessment
Presentation by Priyanka Sawarkar
How to commence the IT Modernization Process?
Global Congress Global Leadership Vision for Project Management.
XProtect ® Professional Efficient solutions for mid-sized installations.
© CGI Group Inc. CONFIDENTIAL Reference case : Real time passenger counting Virtual train: combine all information on assets 9 januari 2013Riccardo Becker.
1 Chapter 11: Data Centre Administration Objectives Data Centre Structure Data Centre Structure Data Centre Administration Data Centre Administration Data.
XProtect ® Express Integration made easy. With support for up to 48 cameras, XProtect Express is easy and affordable IP video surveillance software with.
GIS-Based Rail Line Asset Viewer
STRATEGIES FOR ORGANIZATION, VALIDATION AND DISTRIBUTION OF TRANSIT GEOGRAPHIC INFORMATION SYSTEMS DATA Jonathan Wade Manager, Service Development Support.
A Java Architecture for the Internet of Things Noel Poore, Architect Pete St. Pierre, Product Manager Java Platform Group, Internet of Things September.
Multiple-operator Transit Traveler Information New York State Department of Transportation From TRIPS123 to 511 NY.
Network Management Overview IACT 918 July 2004 Gene Awyzio SITACS University of Wollongong.
© 2008 Eventure Events. All rights reserved. Waterworks’ SAP-GIS Integration Charlene Sevier and Marietta Washington Newport News Waterworks.
Enterprise Architecture The Arkansas Approach. Key Areas What is enterprise architecture? Why is it important? How you can participate Current status.
Components and Architecture CS 543 – Data Warehousing.
Presentation Title: Utilizing Business Process Management (BPM) and Enterprise Architecture (EA) to Achieve and Maintain a Competitive Advantage Presented.
1 Alternate Title Slide: Presentation Name Goes Here Presenter’s Name Infrastructure Solutions Division Date GIS Perfct Ltd. Autodesk Value Added Reseller.
EGEMS A Dedicated Web Based System for Ground Water Data Processing Analysis and Storage.
Geoinfosys Technologies New Delhi 9 th February 2012 Development of ‘Geographical Information System’ (GIS) based “Decision Support System for Transport”
Center for Urban Transportation Research | University of South Florida Technology Session: 21 st Annual Transportation Disadvantaged Best Practices and.
GIS in King County Government ‘UW Civil Engineering’ November 15, 2010 Dennis Higgins, King County GIS Center Client Services Manager.
Dynamics AX Technical Overview Application Architecture Dynamics AX Technical Overview.
© Copyright High Performance Concepts, Inc. 12 Criteria for Software Vendor Selection July 14, 2014 prepared by: Brian Savoie Vice President HIGH.
0 0 The SaaS Model Software as a Service (SaaS) is a software delivery model, in which software function is delivered over the internet, managed by a vendor,
Learning with a Purpose: Learning Management Systems Patti Holub, Director District Initiatives and Special Projects Miguel Guhlin, Director Instructional.
ArcGIS Workflow Manager An Introduction
Web Development Process Description
Cube Enterprise Database Solution presented to MTF GIS Committee presented by Minhua Wang Citilabs, Inc. November 20, 2008.
Implementing Geodatabase Technology
The Utilization of GIS Technology at Northeastern REMC Presented By: Steven Weber, GISP Northeastern REMC (260)
Technical Workshops | Esri International User Conference San Diego, California Esri Maps for IBM Cognos Dave Kerr Darren Nelson July 2012.
This presentation is the property of Paradigm Information Systems It is confidential to the intended recipient for the purpose of evaluating FMS Any other.
CALIFORNIA DEPARTMENT OF WATER RESOURCES GEOSPATIAL TECHNICAL SUPPORT MODULE 2 ARCHITECTURE OVERVIEW AND DATA PROMOTION FEBRUARY 20, 2013.
Multi-Operator Transit Information for Operations and Planning Transit Service Information Portal (TSIP)
Enhancing Situational Awareness through Visualization of Interior Spaces Seth Peery, Sr. GIS Architect Enterprise GIS CTSSR Tech Showcase :: September.
A Summary of State DOT GIS Activities Presented at the 2004 AASHTO GIS-T Symposium Rapid City, SD.
Enterprise GIS Benchmark Update Presented by David James, Business Technology Services EGIS Committee Meeting7 th July 2011 Enterprise GIS Steering Committee.
Lucity GIS and IT Services. Lucity IT Services.
 Chapter 6 Architecture 1. What is Architecture?  Overall Structure of system  First Stage in Design process 2.
Geospatial Technical Support Module 2 California Department of Water Resources Geospatial Technical Support Module 2 Architecture overview and Data Promotion.
ArcGIS Data Reviewer: An Introduction
Metro’s Capital Improvement Needs Presented to the National Capital Region Transportation Planning Board By Tom Harrington, Director of Long Range Planning.
Geospatial Systems Architecture Todd Bacastow. Views of a System Architecture Enterprise Information Computational Engineering Technology.
Esri UC 2014 | Technical Workshop | ArcGIS Online: An Introduction and Overview Ray Bunn Andrew Hendrickson Tim Oliver, Horry County Paul Ross.
Enterprise Service-Oriented Architecture and GIS
ArcGIS Workflow Manager Introduction
CASE (Computer-Aided Software Engineering) Tools Software that is used to support software process activities. Provides software process support by:- –
Workforce Scheduling Release 5.0 for Windows Implementation Overview OWS Development Team.
Managing Enterprise GIS Geodatabases
Making Friends with Your Public Works Department Using GIS Sherry Coatney Intergraph Corporation
1 Acquisition Automation – Challenges and Pitfalls Breakout Session # E11 Name: Jim Hargrove and Allen Edgar Date: Tuesday, July 31, 2012 Time: 2:30 pm-3:45.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Building a Transportation Database WMATA Rail Station Mapping Project 3/18/2014.
Using GIS to Enhance the Collaboration, Creation and Management of Assigning Addresses and New Roads in Island County Becca Blackman GIS Coordinator/Administrator.
Washington Metropolitan Area Transit Authority
Washington Metropolitan Area Transit Authority
Presentation transcript:

Constructing WMATA’s Enterprise GIS: Strategy, Action, Issues Washington Metropolitan Area Transit Authority Constructing WMATA’s Enterprise GIS: Strategy, Action, Issues Ed Wells, GIS Manager Anurag Mehta, GIS Architect GIS in Public Transportation Conference October 13, 2011

Present WMATA case study in implementing an enterprise transit GIS Purpose Present WMATA case study in implementing an enterprise transit GIS Setting strategy Reengineering business processes Building on legacy data assets Delivering and maintaining GIS in a dispersed agency Integrating GIS with other IT applications

WMATA: Scope and Scale of Services Provides passenger transit rail, bus and paratransit services for DC and surrounding areas of MD and VA (1,500 sq mi). Rail: 103 mi track; 86 stations; 850 railcars; 217M annual ridership Bus: 350 routes; 1,480 buses; 124M annual ridership Paratransit: 600 vehicles; 2.4M annual ridership Police force; planning; real estate; environmental responsibilities

WMATA GIS Purpose and Role Purpose: Enterprise GIS integrates mapping and databases to support consistent information across the enterprise, efficient operations, and informed stakeholders. Role: GIS is a service, not an application. GIS owns few business processes and supports many: Geographic data base display Geographic analysis Geographic data capture Data integrity testing Data integration GIS

IT Span of GIS Software – ESRI ArcGIS 9.3.1 (upgrading to 10 this year) Hardware Production, staging, dev environments; education and map production environments Managed storage (SAN and NAS) Applications Data Integration – Maximo and Trapeze in progress Web services – Agency-wide intranet viewer Business processes User support

GIS Current Role Enterprise system System of record and data maintenance All mapping data Bus stop and route attributes System integration driver Data integration driver Geographic and RDBMS data integrity enforcement driver Data display and analysis tool

GIS Viewer: Key Points Web viewers vs. ArcGIS client software Scale: Entire service area to engineering detail Core Data All mainline and yard track Rail station platforms and entrances Bus stops and routes Compact jurisdiction boundaries Base maps and imagery Basic functionality: Search, identify, measure, print Web service links: Public services: Google StreetView, Bing imagery WMATA internal: Maximo, other applications Document retrieval Sketch tools

GIS Development Chronology 2007-2011 FY08 Strategic plan FY09 Enterprise Architecture Enterprise GIS software installation; as-is data loading FY10 WebADF GIS web viewer and core data FY11 Flex GIS web viewer Integrated bus stop and route database Bus stop and route data posted to public web site Rail linear referencing system for mainline track Began integrating GIS with asset/work order management system (Maximo)

Rail, Bus, Van, Road Network Setting Strategy: A Portfolio Approach Strategic Portfolio of GIS Parcel Facility Amenity Rail, Bus, Van, Road Network 40% Fixed Asset Management 40% Transit Operations Stops, time points, chain markers, waypoints Patterns, routes, lines, transfers Performance (vehicles, trips, blocks) 20% Support Operations MTPD, Plan, Real Estate; Environmental, IT

Building Alliances Across Departments Principles IT is a support department Keep the domain expert in charge of information decisions Keep IT in charge of data and system architecture decisions Lessons Do not start applications unless the data is compiled Do not compile data you are not prepared to maintain What is the business process? What is the IT process? Make it easy for the domain expert to feed information to the GIS staff Use the maintenance process to drive business process reengineering

Business Process Reengineering Business Process Reengineering: The Payoff Use the maintenance process to drive business process reengineering Work incrementally: Add GIS to the existing data flow at first Let GIS become the source for authoritative data Then build GIS data maintenance into a revised workflow Use the interim process to define more automated interfaces and applications

Legacy Data Assets Legacy Data Are An Asset Choices Keep what is good Compile new Convert one existing data source Convert multiple sources, cross-check, and reconcile the discrepancies Keep what is good Use geography to cross-check legacy data and reconcile multiple data sets Break down the silos Aim toward consistent information across the enterprise

Enterprise GIS Architecture: Business Considerations Key Business Needs Serve available data CAD data, documents, GIS data Add geographic value Make simple apps available Desktop software, web viewers, dashboards, reports Define and set standards/practice/key datasets Metadata, QA tests, common base layers, remove duplication Enable mobile architecture Hand-held devices, versioning

Enterprise GIS Architecture: Operational Considerations Key Enterprise Needs Low level integration Calls from Oracle-based apps: SQL functions High level integration Interface to interface: Web map call to Maximo service Systems/Data integration Data exchange, maintenance, overnight updates, Oracle jobs: AVL, Asset Mgmt.; Document repository Enterprise environment Automated deployments, patch management, license management Nimble application development Architecture, development/staging/training environments

Five Components of Enterprise Architecture Design Architecture Strategy and Design What are the information flows and standards Infrastructure and Systems Architecture How will physical realization occur, how will users interact Data Architecture What data will be stored, reported Process Architecture How will data be maintained and standards enforced Applications Architecture How will information be used, how will value addition occur

WMATA Enterprise GIS Architecture Architecture Design Services Oriented Architecture SOAP compliant web services Integrate with Enterprise Services via Enterprise Bus Support nimble Applications Arch.: Mashups, API overlays Flexible presentation layer – lots can happen at interface level Eg: Track Signal (Asset) and GIS

GIS Service Tier Architecture

WMATA Enterprise GIS Architecture Infrastructure and Systems Architecture Separate Data and Application Nodes Data node: support for spatial functions and SQLnet calls Data node supports Application node via SQLnet service App node: hosts web services and web applications Both nodes expose APIs Illustration of a SQL function call: SELECT bt.bus_id from bustable bt, counties ct where bt.avltime=(SELECT CURRENT_TIMESTAMP from DUAL) and ct.name = ‘Arlington’ and sde.st_within (bt, ct) = 1;

GIS Design Architecture 19

GIS Data Flow Architecture

GIS Deployment Architecture

Delivering GIS Across the Enterprise Web services and Web APIs to make the GIS accessible to non-users agency-wide Deploying and administering client ArGIS software for power users The center of the enterprise: Servers Storage Redundancy Security

Application Integration Key Integration Points Rail, Asset Management: Plant, Elevator/Escalator, Power, ATCS, AFCS, Track and Structure Maintenance, IT-Communications Applications: Maximo, AutoCAD Bus: Bus Planning, Scheduling, Bus Technology Applications: Maximo, Trapeze, Clever, Trip Planner, Farebox Support: MTPD Applications: Dispatch, Crime Records

Application Integration Choices Levels of Integration Data Software Business process Methods of Integration Web services Data synchronization

Program / Project Overview Major FY12 Task Groups TG1: ArcGIS 10 – Oracle 11g – Windows 2008 upgrade; CTF failover TG2: GIS-MMMS integration: design, software implementation; data TG3: Transit route network: software tools; construction TG4: Intranet: AVL, APIs, integration services TG5: Public website enhancements: bus stops and routes TG6: Building interior mapping: floor plans, 3-D TG7: User support, metadata, and training TG8: Mobile GIS

TG 1: ArcGIS 10 Upgrade Goal: Conform to IT standards by upgrading GIS software to ArcGIS 10, Oracle 11, and Windows 2008. Add failover servers at CTF Benefits: Supports Maximo 7.5 upgrade (incompatible with ArcGIS 9.3.1); failover provides continuity of operations even if JGB is offline Cost: $378,971 Deliverables/Timeline: 7/11: ArcGIS 10 dev environment in operation 3/12: CTF failover for production environment in operation 6/12: ArcGIS 10 production environment in operation Risks/Mitigation: If Maximo 7.5 upgrade is delayed, ArcGIS 10 upgrade will be too. Mitigation: Continue using 9.3.1 during the interim Key tools may have different upgrade schedules. Mitigation: Plan to maintain two versions with redundancy for several months

TG 2: GIS-MMMS Integration Goal: Ensure consistent asset inventories between GIS and MMMS; provide mapping capabilities to MMMS. Benefits: Safety: what is near an emergency that must be protected? Efficiency: Improved deployment and reduced travel time Deliverables/Timeline: 8/11 – Geodatabase design implemented; data conversion plan defined 12/11 – Maximo Spatial in development environment 6/12 – Key asset classes mapped Risks/Mitigation: Maximo Spatial has few large installations; none under 7.5; and none for transit. Mitigation: Retain good consultants that can resolve unexpected problems Legacy data may be inconsistent/incomplete> Mitigation: Cross-check all data sets; resolve inconsistencies

TG 3: Transit Route Network Goal: From stop and route data, create a routable network of WMATA bus and rail services Benefits: Supports integrated maintenance and QC of WMATA stop, timepoint, pattern, and route data Deliverables/Timeline: 10/11 – Evaluate/procure available software tools 12/11 – Linear referencing added to bus routes 3/12 – Transfer segments added to bus and rail routes 6/12 – Network topology added to bus and rail routes Risks/Mitigation: Linear reference networks are complex to build and require specialized software tools to manage. Only one GIS-based vendor is known. Timing of vendor upgrade to ArcGIS 10 is not known. Mitigation: Be prepared to create tools in house if the product is unsatisfactory or too expensive.

TG 4: Intranet Improvements Goal: Add functionality and data to GIS viewer. Support Silverlight and Flex APIs. Create web services for application data integration Benefits: Increased use of GIS viewer within WMATA. Provision of GIS views and map controls to other applications. Consistent data across applications. Deliverables/Timeline: 9/11 – Bus AVL and train location data shown displayed in web viewer. 9/11 – Silverlight GIS API is available to other applications 12/11 – GIS – Trapeze data exchange web service defined and tested Risks/Mitigation: Trapeze data exchange capability is untested. Mitigation: Include QC and verification of data exchange.

TG 5: Public Website Enhancements Goal: Add bus stop and route maps to wmata.com website. Benefits: Bus system becomes more familiar to the public. Bus stop data is accessible to MetroAccess customers. Deliverables/Timeline: 9/11 - Application available internally 12/11 – External security and design complete 3/12 – Internal testing of public application 6/12 – Application available publicly Risks/Mitigation: Public interface testing/marketing approval process is not known. Mitigation: Ascertain the approval process. Hold schedule for technical development, but adjust as needed to accommodate approval process.

TG 6: Building Interior Mapping Goal: Georeference rail station floor plans and site plans and add to GIS. Create 3-D imagery and floor plans of bus garages (no plans exist now). Benefits: Provides a base for in-station infrastructure mapping. Supports more intelligent crime mapping. Supports better Deliverables/Timeline: 3/12 – Rail station georeferencing procured and completed. 6/30 – Bus garage mapping procured and completed. Risks/Mitigation: AutoCAD files for rail station plans have not been reviewed. Mitigation: if data is incomplete, determine how best to create or update it. 3-D mapping is new technology. Mitigation: one pilot test has been done. 3-D data requires a custom data viewing add-on. Upgrade plans to ArcGIS 10 are not known. Mitigation: Defer action until WMATA and vendor upgrade plans are known.

TG 7: User Support Goal: Support GIS use in WMATA departments via tech support, creation of map publications, metadata, and training courses. Benefits: Use justifies WMATA’s investments Deliverables/Timeline: 12/11 – Bus route map series completed 3/12 – Training course offered in WMATA GIS resources and use 6/12 – Training course offered in basic GIS concepts 6/12 – Complete metadata compiled for all feature classes shown in the web viewer Risks/Mitigation: Hiring restrictions preclude adding FTEs. Mitigation: Use contract services, and/or adjust goals to fit reduced capacity.

Questions and Discussion Washington (DC) Metropolitan Area Transit Authority Ed Wells, ewells@wmata.com Anurag Mehta, amehta@wmata.com