CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules

Slides:



Advertisements
Similar presentations
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Power Supplies Monitoring and control.
Advertisements

Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
Niels Tuning (1/9) LV status. Outline 1)Preventive maintenance  Fan replacement 2)Power supplies:  Clogged cooling water circuit  Water damage 3)Next.
Power supply planning for upgrade OT  Scintillating Fibre Wilco Vink On behalf of the SciFi group 19 May 2014.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
Berkeley Lab, May Bertrand H.J. Biritz1/16 Outline RHIC and STAR STAR Time of Flight (TOF) High and Low Voltage Power Supply Control Interface Daya.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
FP420 Low and high voltage supply INFN/Univ. of Torino July A presentation intended to stimulate the discussion on which.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
ISEG HV power supplies for NA62 R. Fantechi 6/4/2011.
21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
RPC Trigger Electronics Review Subjects: Link System Low Voltage Link System Upgrade Krzysztof Doroba, University of Warsaw Krzysztof Doroba, RPC TRigger.
Preparation of chamber training g. passaleva. Gaps to be trained We have O (100) gaps that have tripped at least once since June At a quick glance they.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
Wiener Maraton & Turbines Pascal Perret LPC Clermont 16 April 2008.
8-May-2010 LV Workshop1 Alignment LV: quick’n dirty HW review Alignment uses CAEN low voltage –No HV –Low power consumption electronics: under kW.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
23MAY07Xvc - Calo ECS Working Group1 Calo FSM hierarchy and structure Xvc.
TRT HV System status and plans for LS1 LPI Moscow, K. Zhukov.
PIXEL CAEN Installation Status
AM system Status & Racks/crates issues
T1 Electronic status Conclusions Electronics Cards:
EMU Slice Test Run Plan a working document.
Electronics for RPC Upscope
CSC - HV, LV - Present Status and Future Plans Toward Phase 2
Hardware Needs (Near Term)
Operations/Failure Analysis
B904 Status Report by Fred B.
UXC55 ME Muon Endcap On Detector Layout
Fred’s Input to Rice Workshop

Operations/Failure Analysis
Operations/Failure Analysis
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Operations/Failure Analysis
US Rod Burn-in Readiness DAQ Hardware/Power Supplies
Equipment Status ARCS equipment status DAQ equipment status
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
YE+3 Changes YE+3 X4A51 S4F04 Additions for TS ME+4/2/x chambers
Equipment Management DB Rack Wizard USC55 Underground Counting Room
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
TTC Fiber Distribution
Prepared for CSC by Fred Borcherding FNAL
CSC Electronics Installation and Commissioning Oct ‘06
CSC Status Report Status reports;
B904 Status Report by Fred B.
CSC DSS Status Report by Fred B.
19-April-05 CSC ME1/1 Meeting
Needed for Team A on -End
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
ME I&C -- PC Electronics
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
CSC Shift Training and Operation + B904 Status
Presentation transcript:

CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules 19-April-05 CSC Hot Spares LV Modules (24 units needed) Wiener PFC module spares 4 new + (2 old lower power) 1 on hand 1 with ECAL for special testing 1 failed yesterday 1 in repair Wiener Maraton Crates 4 units 4 on hand HV Modules ME1/1 CAEN system FU custom system > 40 master brds, 270 distribution brds 20% spares at CERN Custom Modules FED Crates – 4 crates 1 spare crate with PS – being shipped to CERN 1 spare on order 1 PS failed last week – using spare from CERN POOL Pcrates – 20% spares of all crates and boards at CERN On-chamber – 20% spares at CERN 17-Jan-19 CSC Hot Spares