Customer Overview Pack – September 2018

Slides:



Advertisements
Similar presentations
Simultaneous PSTN and Broadband Provision Process Incorporating Broadband Movers Issue 5.
Advertisements

Individual Electoral Registration (IER) Electoral Matters Committee
1 Project Smart Metering Portfolio Foundation Updates June 2013.
COR1000 Telecoms Project UK Link Committee Update September 2012.
Xoserve sense checks & validation Reasonable Endeavours Claims.
How to do business guide. Fixed, Data and Hosted Solutions by Mandy Fazelynia Latest update – 11/11/2013 Operations Director.
Shipperless & Unregistered site working group Recommendations to address the Unregistered Sites Collectively establish & execute activities to correct.
Ophthalmic Payments National User Group Meeting 2 nd July 2009.
Annie Griffith & Chris Fears September 2007 UK Link Technology Refresh.
Infrastructure Solutions Flexible Adaptable Dependable Reputable.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
COR1000 Telecoms Project UK Link Committee Update May 2013.
1 June 2012 COR1000 Telecoms Project UK Link Committee.
Mobile & Mobile Broadband
Local Points of Contact Webinar
Practice Match for 2018 placements
Administration of a FIDIC Contract - Project Control
Principal Evaluation Process
Warranty procedure Index Overview
ESB Networks AIP Programme
UK Link Technology Refresh
Inviting Applicants to Interviews/EVENTs
Customer Overview Pack – September 2018
HSCN- TACO Programme 26th April 2018.
Customer Overview Pack – August 2018
SmartMeterTM Steering Committee Update – September 2012
Placing an order for Etherway Fibre and Etherflow Connected
Business zone Ethernet – Ordering a Radio Survey
Project Funding and Spending Controls Implementation
Placing an order for Etherway Copper
Market Trials ChMC 8th August 2018.
A Managers Guide to Parental Leave
Goulden Rule Driving School LLC
DSC Delivery Sub-Group
The transition to the new teachers and principals award connects with several areas of reform, and;
TransformUs Programme
Must Read Process Guide For Shippers
Medical and school externships
Xoserve IX Refresh Update
Change Management Committee – June 2019 Update
Important information about your assessment in 2017/18
Xoserve IX Refresh Customer Update 12/02/2019.
DSC ChMC CSS update 8th August 2018
Customer Overview Pack – July 2018
Approach to Market Cutover - Draft for Discussion
Xoserve IX Refresh Customer Update 30/10/2018.
Customer Overview Pack – July 2018
Xoserve IX Refresh Customer Update 03/01/2019.
Medical and school externships
Xoserve IX Refresh Customer Update 04/04/2019.
Goulden Rule Driving School LLC
DSC ChMC CSS Consequential Update 13th March 2019
TransformUs Programme
ESB Networks AIP Programme Update to IGG, June 22nd 2006
COR1000 Telecoms Project UK Link Committee Update
GRP Progress & Plans The GRP project was established to deliver an updated design utilising fully supported hardware and software for Gemini. GRP is replacing.
COR1000 Telecoms Project UK Link Committee
Xoserve IX Refresh Customer Update 05/03/2019.
Scheme for Growth Pilot
Xoserve IX Refresh Customer Update 04/04/2019.
Raising a Customer Controlled SFI (CCSFI) fault Version 1
Pay progression Employee briefing pack
Xoserve IX Refresh Customer Update 01/05/2019.
Xoserve IX Refresh Customer Update 30/07/2019.
Xoserve IX Refresh Customer Update 30/07/2019.
Contents What’s in this User Guide? p3 – Version Control
Industry briefing Request for Tender for the Provision of Functions Catering Services DFAT RFT- 247 Thanks for attending Introductions – Tender Manager,
Financing a Fairfield Education Orientation 2019
DSC ChMC Switching Programme Update 9th October 2019
Xoserve IX Refresh Customer Update 09/10/2019.
Presentation transcript:

Customer Overview Pack – September 2018 Xoserve IX Refresh Customer Overview Pack – September 2018

IX Site Survey Survey Responses Pilot Site We have issued site surveys to all customers in May and have been actively working with you over these past few months to obtain your site information. As of the 30th August we have received a fantastic 151 completed responses (out of 171), giving us a 88% completion rate, an increase of 4% from last month - thank you to all who have responded. We have now made contact with 100% of customers with the remaining surveys now being in progress. If you would like to check whether your survey has been submitted or have any further questions please contact us at box.xoserve.IXEnquiries@xoserve.com or call 0121 623 2552 Pilot Site The pilot site have had their PSTN circuits installed and have been tested successfully. The next step will be to have the router installed at a date to be confirmed.

Hardware Installations – Circuits Progress on Circuit Installations 17 sites now have PSTN circuits fully installed from the initial group of customers. Gamma is continuing to liaise with the outstanding customers to arrange their appointments. Statistics for these appointments (successful, failed, follow up appointments needed, etc.) will be available as we progress through the plan. Appointment Communications Xoserve is preparing the 2nd group of customers who have returned their site survey and these will be provided to Gamma over the coming weeks. Appointments will follow towards the end of September/ beginning of October and these customers will receive a pre- appointment notification from Xoserve with a confirmation appointment from Gamma (GNS Project Provisioning) to follow. Please accept the appointment date if you are able to grant access to the BT OpenReach engineer on that day, otherwise, you will need to reject the appointment with a reason and confirm suitable dates for your circuit installation.

Next Steps Sept Continue to liaise with customers to receive outstanding site surveys. Continue to install 1st batch of circuit installations and connectivity testing. Prepare 2nd batch of customers for circuit installations. Carry out service provider’s server / hardware baselining activities. Carry out service provider’s network connectivity activities. Oct Installation of 2nd batch of circuits Further planning and checking of site access requirements Continue to carry out service provider’s server / hardware baselining activities. Continue to carry out service provider’s network connectivity activities. Install routers and servers, and execute IX service for the Pilot customer.

Appendix A: IX Service Line Options Xoserve are replacing your IX kit on a ‘like for like’ basis, therefore your replacement IX service option and contract will match the IX option you currently have, which will be one of the following: Option 1 - Primary ADSL and Back-Up ADSL connection Option 2 - Primary EFM and Back-Up ADSL connection Option 3 - EFM Primary and EFM Back-Up connection Option 4 - Primary Fibre/ Ethernet and Back-Up ADSL connection The following slide displays the on-site installation process; the number of site visits that are required is dependant upon your IX service line option complexity.

Appendix B: Your Customer Journey The number of days required to complete the activity will be dependant upon your IX Service option Day 1 IX Survey Response A number of remote off-site activities also take place to assess your site’s requirements and to set-up and test connections and configure hardware Comms Circuit Installations Up to 4 Hours Service Interruption Comms Router Installation Your survey responses are being used to define the roll-out plan Comms Server Installation Xoserve and Gamma will communicate with you directly to agree your installation dates Comms Legacy Kit Decommissioning Engineer(s) will visit your site to install new circuits; the number of site visits and the access method will vary according to your IX service option and site complexity The Router Installation will take place in one site visit Key: Site Visits The new server will be installed with the existing Vodafone server still in situ to enable a fall-back position. Where rack space concerns exist, we will address this on a case by case basis Comms Notes Your old service will be removed and wiped by Vodafone and disposed of in accordance with regulations