FSR 06 — plant & EQUIPMENT isolations & lockouts

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

Introduction to Safe Management of Plant
Basic safety rules and procedures for controlling hazardous energy
2 3 There are two basic areas where there is a need to have resources available. Internal:  Financial  Personnel  Assets  Time External  Consultants.
Workplace Health and Safety Queensland New WHS Legislation Key aspects for the passenger transport industry Karen Bow, Principal Advisor Transport Strategy.
Lock Out/Tag Out Training Lock-Out/Tag-Out OSHA Definition. Lockout/Tagout (LOTO) refers to specific practices and procedures to safeguard employees.
The Control of Hazardous Energy
Lockout/Tagout (LOTO):
LOCKOUT/TAGOUT.
Workplace rules that will save your life
Lock-Out/Tag-out.  What is lock-out/tag-out (LOTO)?  The proper procedure for installing locks and tags.  The proper procedure for removing locks and.
Isolation of Hazardous Energy Understanding the Requirement of Lockout Tagout 29 CFR
Controlling Hazardous Energy
Lockout/Tag-out Procedures
Lockout Tag out Training2009. Control of Hazardous Energy Policy Personal locks & keys will be issued to employees by their Safety/Training Coordinator.
Evolution Industries Jan A Lockout/Tagout (LOTO) program ensures that energized equipment or machines are not started or used while they are being.
Personal Protective Equipment (PPE) Awareness Training S afety A wareness F or E veryone from Cove Risk Services.
OHS Risk Management - Overview Risk management is a system that allows workplaces to identify OHS issues and to methodically control them by the best means.
Hazard Identification
Lockout/tagout Authorized employees
Lockout/Tagout Affected Employees. © Business & Legal Reports, Inc Session Objectives You will be able to: Recognize hazardous energy sources Carry.
LOCKOUT TAGOUT (LOTO) Awareness Training Program 1 Updated 6/29/04 by SN.
Control of Hazardous Energy Lockout/Tagout 29 CFR
Control of Hazardous Energy (Lockout/Tagout) 29 CFR
Striving For Safety Excellence HunterDouglas Corporate Environmental, Safety, Risk Management LOTO – Authorized May 2011.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
RISK ASSESSMENT AND MANAGEMENT
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Electricity Compressed Air Steam Hydraulic Pressure Gas Lines etc.
A procedure for controlling risks 1 st step – to eliminate and identify hazards 2 nd step – to rank the risk associated with the hazards 3 rd step – to.
Two of the most important pieces of the health and safety legislation affecting educational establishments across the UK are the Health and Safety at.
Health and Safety Executive Shattered Lives Campaign 2008 Building and Plant Maintenance.
BEST PRACTICE COMMUNICATING THE WAY: LOTOV
© Module 4—Hazard Prevention and Control Safety Management Worksite Analysis Management Commitment and Employee Involvement Hazard Prevention and.
Health and Safety Refresher Training
An introduction to… Lockout Tagout. Aim Every year thousands of workers get killed or injured while performing repairs or maintenance on industrial equipment.
Development, Validation, Implementation and Enhancement for a Voluntary Protection Programs Center of Excellence (VPP CX) Capability for the Department.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
1 Lockout/Tagout “The Control of Hazardous Energy” LOTO Lockout Tagout.
Striving For Safety Excellence HunterDouglas Corporate Environmental, Safety, Risk Management Lock Out Tag Out Affected Employees.
Lockout Tagout Procedures Why? MoManufacturingWINs Precision Machining Technology ME 100 – Measurement, Materials & Safety.
1OHS Training 2003Induction OHS Training Job Safety Analysis and Hazard management UEENEEE037B.
LOCKOOUT/TAGOUT THE ULTIMATE GOAL IS: To implement policies and procedures to prevent, as necessary, the release of hazardous energy from power sources--or.
Lock Out Tag Out (LOTO).
LOCKOUT/TAGOUT/VERIFY
Lockout/Tagout Standard
Start the program by pressing “enter”.
Personal Protective Equipment (PPE) Awareness Training
Lock Out & Tag Out.
Energy Control (Lockout/Tagout)
CONTROL OF HAZARDOUS ENERGIES (LOCKOUT / TAGOUT)
Behavioural Safety Use Of Work Equipment.
Better to Lockout/Tagout Than to Luck Out!
Control of Hazardous Energy Lockout/Tagout 29 CFR
OVERVIEW Control Of Hazardous Energy.
hazardous energy (lockout/tagout).
Personal Protective Equipment (PPE) Awareness Training
Understanding your Workplace Specific Critical Controls
Understanding your Workplace Specific Critical Controls
Control of Hazardous Energy
Understanding your Workplace Specific Critical Controls
Understanding your Workplace Specific Critical Controls
Understanding your Workplace Specific Critical Controls
Understanding your Workplace Specific Critical Controls
LOTO AWARENESS NOTES: 1. This symbol ▼ indicates you need to click the mouse before reading the next line or slide. 2. Statements in Italics are meant.
Work Equipment Module 12.
Presentation transcript:

FSR 06 — plant & EQUIPMENT isolations & lockouts Understanding your Workplace Specific Critical Controls Instructions: The images in this presentation should depict the specific controls you have agreed at your workplace. Substitute these images for the actual controls you will be using and expect to see implemented.

FSR 06 – plant & EQUIPMENT isolations & lockouts INTENT: To eliminate or minimise the risks of fatalities, injuries and events arising from energised plant at installation, testing, commissioning and decommissioning phases of operation What are the supporting documents you should refer: Primary Standards PS Plant & Equipment Isolations & Lockouts PS General Electrical Safety PS Permits to Work Related Forms E-T-8-0987 Service Isolation Permit E-T-8-0963 Authority to Remove Tag and Lock

Critical Control 1 ALL POTENTIAL HARMFUL ENERGY SOURCES REQUIRING ISOLATION AND APPROPRIATE ISOLATION METHODS ARE IDENTIFIED BY COMPETENT PERSONS

Critical Control 2 ISOLATION (LOTO) TRAINING AND COMPETENCY SYSTEM IN PLACE

Critical Control 3 ISOLATION PROCEDURES ARE SPECIFIC TO THE NEEDS OF THE WORKSITE, AS DETERMINED BY THE RISK ASSESSMENT

Critical Control 4 ROLES ARE APPOINTED – AUTHORISED ISOLATOR, PERMIT ISSUER AND PERMIT HOLDER

Critical Control 5 UNLESS TESTED FOR DEAD, ALL WIRES AND EQUIPMENT ARE CONSIDERED AND TREATED AS LIVE

Critical Control 6 ISOLATION PERMITS ARE IN PLACE

Critical Control 7 ISOLATION INTEGRITY INCLUDES PHYSICAL TRY TEST (CHECK FOR DEAD)

Critical Control 8 RESTRICTED ACCESS CONTROLS IS IN PLACE WHERE EQUIPMENT CANNOT BE FULLY ISOLATED TO ZERO ENERGY

Critical Control 9 ISOLATIONS ARE IN PLACE FOR SERVICING AND MAINTENANCE WORK

KNOWLEDGE DISCUSSION After today’s session, what will you do differently when participating in your next FSR? How do you think this will benefit you? Who do you think you can share this knowledge with? How do you think we can improve the controls?

CRITICAL CONTROLS INCREASING OUR UNDERSTANDING QUESTIONS?