GDOT-Office of Planning Update GAMPO Conference Athens, Georgia Matthew Fowler, PTP Assistant Planning Administrator November 30, 2010.

Slides:



Advertisements
Similar presentations
York Viva Bus Rapid Transit (BRT) Concept image along Davis Drive.
Advertisements

County of Fairfax, Virginia Department of Transportation 1 Transportation Funding and Improving Roadway Services Delivery Transportation Advisory Commission.
Tysons Tysons Corner Circulator Study Board Transportation Committee June 12, 2012.
I-95 Transit & TDM Plan I-95 Transit and TDM Plan Summary of Recommendations Slide 1.
General Update March Background As the region grows, increased travel demand on our aging Metro Highway System will continue to create additional.
21 st Century Task Force Recommendation Go OHIO Transportation Futures Plan will deliver a detailed blueprint for transforming Ohios vast road, rail,
March 2012 Ports and Cities Conference Newcastle Dorte Ekelund, Executive Director Major Cities Unit Department of Infrastructure and Transport
Traffic Analysis Toolbox & Highway Capacity Manual Transition
Alternatives Analysis Orange County OUTBoard September 19 th, 2012.
SCATTER workshop, Milan, 24 October 2003 Testing selected solutions to control urban sprawl The Brussels case city.
Freight, Goods and Services Plan & Economic Impact on Central Florida.
EFFICIENT TRANSPORTATION SOLUTIONS IN MINNESOTA A JOINT PRESENTATION TO THE Transportation Funding Advisory Committee September 14, 2012.
Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
Freight in the Southeast Conference Bob Romig State Transportation Development Administrator Florida Department of Transportation February 9, 2011 Florida’s.
Florida’s Future Transportation Corridors Florida’s Future Transportation Corridors Presented to: Florida Redevelopment Association Presented by: Bob Romig.
Operations / ITS Provisions in SAFETEA-LU What’s in There and What’s Not Jeff Lindley Operations / ITS Discipline Meeting August 16, 2005.
Statewide Freight and Logistics Plan GAMPO Annual Work Session Tom McQueen, AICP GDOT Office of Planning June 25, 2010.
California Freight Advisory Committee May 14, 2014.
Comprehensive Freight Movement Plan Pennsylvania Rail Freight Seminar May 22, 2013 Pennsylvania Long Range Transportation Plan Pennsylvania Long Range.
Intercity Person, Passenger Car and Truck Travel Patterns Daily Highway Volumes on State Highways and Interstates Ability to Evaluate Major Changes in.
Transportation Data Palooza Washington, DC May 9, 2013 Steve Mortensen Federal Transit Administration Data for Integrated Corridor Management (ICM) Analysis,
21 st Century Committee Report Recommendations NC 73 Council of Planning Annual Meeting January 22, 2009.
2015 Interregional Transportation Strategic Plan Active Transportation and Livable Communities August 21, 2014 Scott Sauer.
Framework for Model Development General Model Design Highway Network/Traffic Analysis Zones (TAZs) Development of Synthetic Trip Tables Development of.
1 Multi-Sector Approach to Reducing Greenhouse Gas Emissions in the Metropolitan Washington Region Land Use and Transportation Strategies Prepared for:
October 6, :30 – 11:00. MPM Team Agenda Review of MPM program and team MAP-21 and other updates Mobility performance measures reporting On-going.
Improving Your World. RS&H tradition began in 1941 Employee-owned company Six programs of client-focused services Multi-disciplined team of planners,
U.S Department of Transportation Federal Highway Administration Federal Transit Administration MAP-21 Moving Ahead with Progress in the 21 st Century Linking.
Moving Ahead for Progress in the 21 st Century Act of 2011 Potential Freight Implications FHWA Talking Freight December 2011 Tony Furst, Director FHWA.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Meeting Agenda Stakeholder Participation Panel July 14, 2003 Welcome/Introductions Study Overview Tasks/Products/Schedule Traffic Patterns Break Key Project.
Integrated Corridor Analysis Tool (ICAT) William W. Stoeckert I-95 Corridor Coalition.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
1 The Technical Decision for Transportation Management System The Technical Decision for Transportation Management System by KUANG YANG KOU ASSOCIATE PROFESSOR.
Freight Issues in the Report of the National Surface Transportation Policy and Revenue Study Commission Transportation for Tomorrow.
A Case Study of Promoting Metropolitan Freight Collaboration: The Twin Cities Experience Performance Management Framework Minnesota Department of Transportation.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
Multimodal Corridor System Management – Incorporating Analysis of Transit, Demand Management Programs and Operational Strategies Presented by Bill Loudon,
Transportation leadership you can trust. presented to 11 th TRB Transportation Planning Applications Conference, May 2007, Daytona Beach presented by Robert.
Connectivity & Mobility
Urban Road Pricing: US DOT Congestion Initiative and Urban Partnerships 14 th World Congress on ITS IBEC Special Session October 10, 2007 Beijing Exhibition.
Jennifer Murray Traffic Forecasting Section Chief, WisDOT Metropolitan Planning Organization Quarterly Meeting July 28 th, 2015.
North Central Texas Council of Governments Transportation Department Summary Presentation January 2004 MOBILITY 2025: THE METROPOLITAN.
California Department of Transportation Transportation Management Systems (TMS) and their role in addressing congestion Discussion Materials Lake Arrowhead.
December 2006 Study Update We’ve been busy since our last round of advisory committee and task force meetings were held in the summer and fall. Our next.
November 30, 2012 Beverly Davis, AICP Ron Ratliff, AICP.
Client Name Here - In Title Master Slide Data Requirements to Support Road Pricing Analyses Johanna Zmud, Ph.D. NuStats Partners, LP Expert Forum on Road.
Managed Lanes CE 550: Advanced Highway Design Damion Pregitzer.
Interstate 95 Corridor Improvement Program June 20, 2012.
ITS Standards Program Strategic Plan Summary June 16, 2009 Blake Christie Principal Engineer, Noblis for Steve Sill Project Manager, ITS Standards Program.
Ohio Department of Transportation Steering Committee Meeting #3 Steering Committee Meeting #1May 30, 2012 Steering Committee Meeting #1 WELCOME Steering.
PROJECT UPDATE PUBLIC OPEN HOUSE #3 OCTOBER 17 4:30 PM – 6:30 PM Dakota County Northern Service Center.
Comprehensive Plan Update Kevin O’Neill Seattle Bicycle Advisory Board September 2, 2015.
Greening Freight & Transportation Corridors Commission for Environmental Cooperation Mapping the road to a sustainable future.
Transportation Investment Act of 2010 AASHTO/MTAP Conference December 6-9, 2010 Savannah, Georgia Steve Kish, Transit Program Manager Georgia Department.
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
SAFETEA-LU System Management and Operations Key Provisions Jeff Lindley Office of Operations Federal Highway Administration U.S. Department of Transportation.
Bicycle Advisory Board September 2, 2015 Freight Master Plan.
Company LOGO Georgia Truck Lane Needs Identification Study Talking Freight Seminar March 19, 2008 Matthew Fowler, P.T.P Assistant State Planning Administrator.
1 USDOT Congestion Initiative Baltimore – Washington Regional Traffic Signal Forum Maritime Institute Linthicum, MD March 14, 2007 Regina McElroy Director,
Freight Transportation Plan Savannah, GA AMPO Conference - October 23, 2014.
0 Freight Activities: Year in Review Dec. 12 th 2015.
Planning Commission Ian Macek May 26, 2016 Freight Master Plan.
MAP 21 Freight Talking Freight December 14, 2011 Leo Penne AASHTO.
Oregon State Rail Plan Update
Freight Transportation Plan Savannah, GA
NGTA Halton Planning and Public Works Committee
“efficient movement of goods across the entire state of Oregon”
Presentation transcript:

GDOT-Office of Planning Update GAMPO Conference Athens, Georgia Matthew Fowler, PTP Assistant Planning Administrator November 30, 2010

A GENDA Atlanta Region Managed Lane System Plan I-85 HOV to HOT Conversion Statewide Freight & Logistics Plan Statewide Model Upcoming Studies

Atlanta Region Managed Lane System Plan Managed Lanes are an innovative solution to managing congestion through value pricing and providing a mobility option. Will utilize and expand the current HOV system footprint. The first system-wide evaluation of urban area managed lanes performed in the United States. Evaluated Metro Atlanta freeways Considered: – Benefits – Costs – Constructability – Financeability – Environmental/Community Impacts 3

Adopted by State Transportation Board December 2009 Recommends five project tiers Est. full build out cost : $16B Est. private participation (P3): $9B Est. Funding Gap: $7B 4 Managed Lane System Plan SAVES THE REGION $47B IN REDUCED TRAFFIC DELAY, OVER 35 YEARS

I-85 North HOV to HOT Conversion Convert 15 miles of existing HOV lanes (1 lane each direction) on I-85 from Chamblee-Tucker Road (DeKalb County) to Old Peachtree Road (Gwinnett County) Access policy: – HOV 3+ no charge – HOV 2 and SOV access based on value pricing GDOT overseeing construction, SRTA operates toll, GRTA operates commuter buses 5

I-85 North HOV to HOT Conversion $147 Million demonstration project ($110 million from USDOT, $37 million matching state and local funds) – Construct 2 new park and ride facilities, providing 1,900 additional parking spaces – Purchase 36 new buses, supporting 7 transit routes – Expanded HERO services – Installation of overhead tolling gantries and other ITS features Under construction now, open to traffic summer

S TATEWIDE F REIGHT & L OGISTICS P LAN Develop a Statewide Freight and Logistics Plan that: Builds on the Commission for a New Georgias Freight and Logistics Task Force and the Statewide Strategic Transportation Plan (SSTP) Builds on the Commission for a New Georgias Freight and Logistics Task Force and the Statewide Strategic Transportation Plan (SSTP) Identifies projects and funding that advance freight programs Identifies projects and funding that advance freight programs Maximizes the economic development potential of freight Maximizes the economic development potential of freight

S TATEWIDE F REIGHT AND L OGISTICS P LAN : W ORK T ASKS 8 Plan Development Advisory Committee and Stakeholder Outreach ( Task 1 ) Make business case for investing in F&L Analyze freight- related projects identified in previous studies Make business case for investing in F&L Analyze freight- related projects identified in previous studies Freight Supply/ Demand Analysis Identify strategic freight network Identify deficiencies Freight Supply/ Demand Analysis Identify strategic freight network Identify deficiencies Relate freight to economy Refine forecasts with private sector Describe economic value of freight investment Relate freight to economy Refine forecasts with private sector Describe economic value of freight investment Long-list of potential solutions Enhance PrPP Tool using IT3 Prioritize projects and packages Long-list of potential solutions Enhance PrPP Tool using IT3 Prioritize projects and packages Link F&L Plan to SSTP ( Task 2 ) Strategic Freight and Logistics Framework ( Task 3 ) Economic Evaluation and Projection ( Task 4 ) Recommendations and Project Evaluation ( Task 5 ) We Are Here

Freight Plans/Studies: – Albany Regional Freight Plan, 2007 – Atlanta Regional Freight Mobility Plan, 2008 and Atlanta Strategic Truck Route Master Plan, 2010 – Augusta Regional Transportation Study Freight Plan, 2009 – Savannah/Chatham Co Intermodal Freight Study, 1998 – Chattanooga VW Plant Freight Impact Study, 2010 – Valdosta-Lowndes MPO Freight Movement Study, 2010 – Other existing, updated or proposed studies? LRTPs will be reviewed for MPOs not listed above S TATEWIDE F REIGHT & L OGISTICS P LAN

Task 1.Stakeholder Outreach 2.Link Freight and Logistics Plan to SSTP 3.Existing and Future Freight Conditions 4.Economic Evaluation and Projection 5.Project Evaluation and Recommendations Task Performance S TATEWIDE F REIGHT AND L OGISTICS P LAN P ROJECT T IMELINE 10 Draft ReportFinal Report Month MAMJJASONDJFM A MJJ ASO

S TATEWIDE F REIGHT & L OGISTICS P LAN N EXT S TEPS Fall 2010/early Winter 2011 Project Identification and Evaluation: identify potential solutions and prioritization scenarios Winter 2011 Outreach Coordination and Regional Meetings

S TATEWIDE M ODEL G OALS 12 Develop analysis tools that have the capability to analyze the impact of the following: Modal diversion between people and goods Major changes in land use and economic policies Alternate modes of person travel (auto, bus, rail and air) Provide analysis of impacts of future transportation infrastructure investments and strategies Develop and maintain appropriate databases to support the statewide model

S TATEWIDE M ODEL 13 Will Provide: Intercity Person, Passenger Car and Truck Travel Patterns Daily Volumes on highway network Ability to Evaluate Major Changes in Land Use and Economic Policies on Person, Truck and Goods Movements Ability to Evaluate Major Highway and Interstate Improvements outside of MPO areas Provide General Intercity Intermodal Freight Movements Evaluate Shift of Freight Traffic between Highway and Rail Evaluate General Impact of New Intermodal Facilities (Rail-Truck) Will NOT Provide: Detailed Personal and Vehicle Travel Patterns and Demands within MPO areas Identification of Future Bottlenecks within MPO areas Detailed Intermodal Freight Movements within MPO areas Hourly volumes on highway network

S TATEWIDE M ODEL H IGHWAY NETWORK 14 Georgia Roadway Facilities ( all State Routes included) Inside MPO areas o Interstates o Principal Arterial o Most Minor Arterials Outside MPO areas o Interstates o Principal Arterial o Minor Arterials o Most Major Collectors Surrounding States o Interstates o Principal Arterials o Some Minor Arterials in areas adjacent to Georgia Remaining States o Interstates

S TATEWIDE M ODEL B ASE Y EAR H IGHWAY N ETWORK 15 Legend Interstates Principal Arterials Minor Arterials Collectors Locals

S TATEWIDE M ODEL S CHEDULE 16 Draft Model has been Calibrated and Validated Performing Sensitivity Testing Evaluating Various Scenarios (combinations of Land-Use Assumptions and Transportation Improvements) Identification of Evaluation Measures Preparation of Model Documentation Estimated Submittal to GDOT: December 25, 2010

I-75 Corridor Study: North Metro Atlanta to Chattanooga – Evaluate long and short term transportation needs within the corridor-including capacity and operational needs I-75 Corridor Study: South Metro Atlanta to Perry – Evaluate long and short term transportation needs within the corridor-including capacity and operational needs Columbus-Macon-Augusta Freeway/Corridor Needs Analysis – SSTP/IT3 suggested upgrading Fall Line Freeway to a limited-access route would have benefits – Study will consider upgrading limited-access and consider other needed transportation improvements (capacity/operational) 17 U PCOMING S TUDIES

Atlanta to Athens via I-20, US 78, etc. Connectivity Study – Evaluate options to improve access between Metro Atlanta and Athens Interstate System Risk Assessment – Focus on maintenance/asset management needs – Consider which sections of Interstate need improvements and weigh against travel needs/impacts of not upgrading infrastructure – Potential future tool for guiding maintenance funding levels for Interstates 18 U PCOMING S TUDIES

Livability/Sustainability Factors – Explore what livability/sustainability means for Georgias transportation network – Consider ways to integrate livability/sustainability factors with Project Prioritization Tool Statewide Strategic Transportation Plan (SSTP) – SB 200 (passed during 2009 General Assembly Session) requires that the SSTP be developed every other year. Next update 2012 – 2012 SSTP will also satisfy federal requirements for a Statewide Transportation Plan 19 U PCOMING S TUDIES

Q UESTIONS ?