Friday Morning 7:30 injection for fill 2908

Slides:



Advertisements
Similar presentations
Wednesday 5 th December until this morning 06:59 Stable beams fill #3375, L ~ 6.8e33 cm-2s-1. 10:40 Beam dump, trip of RD2.R5. Integrated L 72 pb-1 in.
Advertisements

Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
LHC Status Tue Morning 22-Aug
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Wednesday September 14th
Wednesday 21 March 2012.
Monday :00 Stable beams 9_6_6_6 13:40 Access.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Coordination: G. Arduini, E.B. Holzer
Tue :25 Beams dumped due to RF vacuum interlock
Saturday 12:00 Fill 1992 in stable beams.
Monday 6th August & night
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Monday – recovery from MKI flashover
Wednesday 31 October: Morning
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Friday 31st August & night
Thursday 10th May - morning
Wednesday 8th August & night
LHC Status Sun Morning 20-Mai
LHC Morning Meeting - G. Arduini
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Monday Morning – recovery from cryo.
Chromaticity can make a difference…
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Thursday :00: Physics fill from the night shift
Wire almost entirely through beam before BLM triggers dump
Saturday – Morning 7:36 beams dumped
Not the most productive 24 hours on record
Sunday
Wednesday 03/11 – The Plan Finish electron-cloud program:
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Monday – Morning Fill 3265 stable beams since 1:31
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 14:00 beam dump Access:
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Saturday 3rd November - morning
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Thursday 26th July 13:21 Fill 2880 beam dumped
Friday 07:00 Fill 1729 dumped. Movement device allowed flag switching to FALSE. From the logs, it seems the energy went to FFFF/7860 GeV. To be confirmed.
Thursday – Morning Energy matching at injection with H CODs
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
LHC Status Tue Morning 22-Aug
Sat morning Until 12:40: Loss maps at injection
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Thursday 22 September 2011.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Tuesday In the morning test cycle with probe for Q’ measurement.
Sat 15/10 New record bunch population profiting of the scrubbing period on Friday. Nb~1.42x1011p/bunch  110 MJ at 3.5 TeV. Filling slowed down by ZS sparking.
Thursday
Saturday 24 September 2011.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Another Immortal Fill….
Monday 27th August & night
Wednesday 26 October 2011.
Wednesday morning / afternoon
Saturday 6th October 05:38 STABLE BEAMS # :06 OP dump
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Saturday 26 November 2011.
Tuesday
Presentation transcript:

Friday 3.8. - Morning 7:30 injection for fill 2908 Average bunch intensity 1.53E11 Still rather large emittances, especially B2 Losses at the end of the ramp in IP7 (up to 32% of BLM threshold); ~6% of B2 lost during the ramp Losses during squeeze (around 1.5m and at the end of the squeeze), up to 36% of BLM threshold 9:17 stable beams Initial L ~6.0E33 cm-2s-1 ~10 hours in stable beams Integrated lumi: ~134 pb-1

LHCb reached 1 fb-1 in 2012

Evening 19:12 dump after PC trip: RCBXV1.R5 Changes for the next fill:  access to replace a power converter sub-module in UJ56 Changes for the next fill: Add empty LHC cycle in PS and PSB before the active LHC cycles Switch off chirping B2 H after 2 TeV (and switch feed-back off if it locks on a spurious line) 21:35 intervention on RCBXV1.R5 power module finished 21:45 RD.34.LR3 tripping repeatedly while going to STANDBY 23:11 piquet re-set the fault, start pre-cycling 23:54 start injecting 0:45 dump during filling: ALICE dipole tripped (piquet checking) 1:30 ALICE dipole re-set, injecting again

Night Emittance of the 4 PS batches look rather similar now 1:56 dump during filling: LBDS self-trigger (MKD B2 kicker in fault) Access needed: AUE reset by piquet 4:00 pre-cycle 4:41 SPS main power converters down (earth fault) 5:11 CMS detector partly down 5:50 SPS back and CMS ready for injection – re-injecting for fill 2911

Morning Fill 2911: Average bunch intensity 1.53E11 Prepare ramp: The incorporation and regeneration tasks take very long time Losses during ramp down again to 2-2.5% B2 losses during squeeze

Recovery of life-time by shift crew! life time very bad for both beams at the end of squeeze. (50% loss level on BLM TCTH point 5). 7h38:52: Before going in collisions (had another 50% loss level!), we sent a trim of +3 units chroma both planes both beams (in step of 1 unit). life time stabilized but still very low. 7h39:53 We then sent again + 1 unit only beam 2 and removed it (seem to be worse). 7h40:32 We then send a trim of +0.003 on tune beam 2 H (steps of 0.001): very little improvement on life time. We tried a trim of +0.001 on tune beam 2 V. 7h48:03 Add +2 more units to chroma beam 2 both planes: finally life time recovered. Finally removed the tune trim on beam 2 V.

Morning 7:59 stable beams fills 2911

PS emittance – slides from R. Steernberg

PS emittance – slides from R. Steernberg

PS emittance – slides from R. Steernberg Emittance H [mm mrad] Emittance V [mm mrad]

PS emittance – slides from R. Steernberg Emittance H [mm mrad] Emittance V [mm mrad]

PS emittance – slides from R. Steernberg