Hall C – this week Time Period Plans 10/24-10/27 Target cool down

Slides:



Advertisements
Similar presentations
Extraction of G E n at Q 2 =1 (GeV/c) 2 by Measurements of May 1, 2011 Ge Jin University of Virginia.
Advertisements

Lead ( 208 Pb) Radius Experiment : PREX E = 1 GeV, Elastic Scattering Parity-Violating Asymmetry PREX : precise measurement of the density -dependence.
Lead ( 208 Pb) Radius Experiment : PREX E = 1 GeV, Elastic Scattering Parity-Violating Asymmetry PREX : density -dependence of the symmetry energy. Nuclear.
Y. R. Roblin, G2P review, 1/17/ HALLA G2P readiness review Yves Roblin, CASA.
R. Michaels PVDIS at Nov 2009 Beam Requirements for PVDIS Property ValueRun-Avg Hel. Correl. 1-Day Hel. Correl. Energy 6 and 4.8 GeVdE/E < 1 ppm < 5 ppm.
Pair Spectrometer Design Optimization Pair Spectrometer Design Optimization A. Somov, Jefferson Lab GlueX Collaboration Meeting September
Accelerator hall of the S- DALINAC – electron energies from 2 to 130 MeV available – cw and pulsed beam operation possible – source for polarized electron.
Prepare DORIS for particle physics again F.Brinker, DESY, March 31 st 2008 Injector chain to Doris and Petra Situation at the IP-region Beam optic Work.
V.N. Litvinenko, ElC Collaboration Meeting, Hampton University, May, 2008 Staging of eRHIC Increased Reach in c.m. Energy and Luminosity Vladimir.
Bubble Chamber Planning Meeting 04 September
PN12 Workshop JLab, Nov 2004 R. Michaels Jefferson Lab Parity Violating Neutron Densities Z of Weak Interaction : Clean Probe Couples Mainly to Neutrons.
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
Improved beam line for Hall A layouts, present and proposed optics in altered region benefits of proposed layout costs of proposed layout conclusions.
Mitglied der Helmholtz-Gemeinschaft Petersburg Nuclear Physics Institute, Russia Storage cells for internal experiments with Atomic Beam Source at the.
Experiment beam line installation (9/4/2014) SystemThus FarTo Do Vacuum~ Torr, IP’s on, Vac interlock checkNone Fast valveValve + CCG installed,
G2p/GEp Beamline Tim Michalski Project Lead. Beamline Overview Slow Raster Tungsten Calorimeter Upside Down Girder (correctors, BCM, superharp) FZ1 Magnet.
Thia Keppel 9/24/12. Accelerator schedule excerpts (Arne Freyberger) Accelerator Run II: Beam in hall 3/2014, or maybe as early as 1/2014 (?) > 1.1 GeV/pass,
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
Yi Qiang May 11,  The last week of E and E  Finished the productions with 3-pass and 2- pass beam with abundant statistics.  BigBite.
Preparation for E Pi0 Collaboration Meeting Tuesday Feb R.Lindgren.
Analysis of the Ammonia Target Polarization Kangkang L. Kovacs, Physics Department, University of Virginia, Charlottesville, VA
March running preparation Alexandre Camsonne Hall A meeting February 28 th 2014.
June 17, 2004 / Collab Meeting Strategy to reduce uncertainty on a  to < 0.25 ppm David Hertzog University of Illinois at Urbana-Champaign n Present data.
1 G9a -FROST. 2 Experiments FROST New generation of CLAS photoproduction experiments with FROzen Spin Polarized Target (FROST) E02-112: γp→KY (K + Λ,
Linac Status June 16, 2015 Time Meeting D. Raparia.
ERHIC design status V.Ptitsyn for the eRHIC design team.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
Status of MAMI C Hans-Jürgen Arends CB-Meeting, Basel October 4-6, 2006.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
Material and thickness for pi0 Y.Sudo Univ. of Tsukuba 2008/07/18.
K0 meeting 2007/10/17 Taito Kawasaki. ~ 10/8 (Mon) : Prepare for experiment 10/9 (Tue) : Beam on (1.0 GeV mode) | 9 days, 18 shifts | Normal run : 31.
E & E status report Maxime DEFURNE CEA-Saclay/Irfu/SPhN 1.
Slide 1 The Heavy Ion Fusion Science Virtual National Laboratory Why heavy ions? Target requires: 3.5 – 6 MJ in ~ 10 ns  500 TW Range ~ 0.02 – 0.20 g/cm.
Y. R. Roblin Hall A beamline and accelerator status.
Møller Polarimeter Status Update 1.Møller hardware status (detectors and targets) 2.Systematics for SANE 3.Plan Dave Gaskell SANE Collaboration Meeting.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
Run Coordnator Report 2012/04/ /04/10 Jixie Zhang
Run Coordinator Report February 5 to 8 Stepan Stepanyan JLAB 1.
1 Updated Run Plans. K.Tilley, MICO, 07/02/08 - pre-commissioning - Target, - beamline functionality - detectors, particle production - decay solenoid.
G 0 Project Coordinator Report Joe Grames “Big Picture” Schedule Preparations Polarized Source Injector Accelerator Hall C Accelerator Plans for 687 MeV.
Analysis of    production ► Data taking ► Reaction identification ► Results for double polarization observable F ► Summary Based on data taken in the.
Hall A Update Thia Keppel User Group Board of Directors January 2015.
Hall A Collab. Mtg, 6/ 2010R. Michaels, JLAB Lead ( 208 Pb) Radius Experiment : PREX E = 1 GeV, Elastic Scattering Parity-Violating Asymmetry PREX : precise.
Status of Polarimeters and Polarized Targets: what are the plans for development of polarized targets to meet the needs of the Day 1 and future experimental.
G2p/GEp Beamline Status Tim Michalski Project Lead.
Bubble Chamber Schedule – 2017
Spin Precession At CEBAF
Test of Optical Stochastic Cooling in CESR
Prototype production and test
G0 Backward Angle Accelerator Preparations
G0 Accelerator Planning Meeting (11/1/05)
Accelerator Issues Raised in Hall A Parity Collaboration Meeting, April B-Team Meeting April 29, 2009.
PEPPo Experiment Readiness Review
Preparation of the CLAS12 First Experiment Status and Time-Line
Bubble Chamber – Beam Requirements
Parasitic Run Physics Simulations
G0 Beam Polarization T. Horn, D. Gaskell Jefferson Lab
Injector Studies Using Superlattice Photocathode
SANE – the last few days Time Period Activities 10/24-10/25
Gep/SANE this week – quick overview
Hall C Beamline Upgrade
Bubble Chamber Experiments at UITF
Hall C Dump Status Beam Resuscitation Review
Run Coordinator Report for PVDIS (E08-011)
Compton Run Liping Gan June 18, 2004.
Electron Ring IP Region Optics
HALLA APEL REPORT Yves Roblin Hall A colllaboration Meeting
Isotope Readiness Review Run Plans
Presentation transcript:

Hall C – this week Time Period Plans 10/24-10/27 Target cool down Restricted access Lockup by swing shift Radcon checklist Complete ion chamber calibration Detector checkout (5 pass) 10/27 Energy change Optics checkout (2 pass) 10/30 Start production data taking Ebeam=2.528 GeV (5 pass) Need combined optics (Moller quads ON)

Hall C – Beam Requirements Type Requirement Positions (Δx, Δy) < 0.2mm Energy < 5 x 10-4 ΔE/E < 10-4 Beam size 100 x 100 μm Raster 2 x 2 mm FW Polarization As high as possible Beam currents Up to 80 μA Beam Polarization will be measured using Hall C Moller

Hall C – special tasks BCM calibration Moller commissioning during Ebeam=2.528 GeV (after 10/30) First energy measurement and BCM calibrations during Ebeam=4 GeV (800 MeV) running (11/6?)