Isabella Pagano & Roberto Ragazzoni -

Slides:



Advertisements
Similar presentations
Christine Pasquire, Nick Blismas, Alistair Gibb
Advertisements

A Joint Code of Practice Objectives and Summary Presentation
Welcome & Introduction
Isabella Pagano PLATO TOUs PM Padova, 1 Feb 20101System &TOUs Team Meeting Organization of the TOU team PLATO System & TOUs.
Information Technology Project Management – Third Edition
Catania 28 Feb – 01 Mar 2011 V.Viotto (INAF - Osservatorio Astronomico di Padova) TOU Breadboard Status and Test.
Program Management Office (PMO) Design
Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity.
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Isabella Pagano Milano, 14 Dec 20101PLATO TOUs An update on PLATO TOUs PLATO System & TOU Teams meeting Milano, Dec.
Telescope Optical Units (TOUs)
PLATO PLATO TOU KO MEETING ‎ H. Rauer (DLR PF) H. Kinter/A. Salado (Kayser-Threde)
Session 321 An Implementation Strategy: Identifies who is responsible for which actions Identifies what funding mechanisms and other resources are available.
1 Belene NPP Project Configuration Management Presented by Alexey Matveev Varna, May
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
What is a project? Project Management Institute definition
Software Engineering General Project Management Software Requirements
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
Systems Engineering Management
Development plan and quality plan for your Project
Enterprise Architecture
Roberto Ragazzoni INAF – Astronomical Observatory of Padova Feasibility of the aspheric lens Catania, June On behalf.
The BIM Project Execution Planning Procedure
PLATO Telescope Optical Units Meeting in Bern March 12 th 2010.
Module 8: Risk Management, Monitoring and Project Control We would like to acknowledge the support of the Project Management Institute and the International.
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
Developing an IS/IT Strategy
MGT 461 Lecture # 19 Project Initiation Phase (I OF II)
ISO 9000 & TOTAL QUALITY ISO 9000 refers to a group of quality assurance standards established by the International Organization for Standardization.This.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
VST: dome THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS Ing. Davide Fierro THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS.
Greening Government Operations Green Procurement Implementation Tools & Resources Canadian Public Procurement Forum October 1 st, 2007.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Standards and Interoperability Framework Primer of S&I Phases, Procedures, and Functions.
Initiation and Planning for Success Sridhar Seshagiri Rao, PMP Innova Solutions Inc. Santa Clara, CA. April 9 th 2004.
Roberto Ragazzoni INAF – Astronomical Observatory of Padova PLATO: the TOUs (Telescope Optical Units) Kick Off Meeting KOM-Paris,
Telescope Optical Units (TOUs) Isabella Pagano (TOU PM) TOU Team Meeting Catania 11 June 2014.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation ERCOT Board Of Directors – August 15, 2006 TPTF Meeting August.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Scope of PCP Phase 1: Solution Design of Q4 First-of-a-kind prototype QUACO Bid Conference, CERN, 07 th July 2016 Arnaud Foussat, CERN TE MSC-LMF Helene.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Project Management PTM721S
Camera PDR/CD1 Planning 19 September 2008
Sample Fit-Gap Kick-off
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
The Project Infrastructure
PLATO Mission: TOU Phase B/C1 preliminary KO meeting:Technical Issues
Business System Development
Project Management Lifecycle Phases
Business System Development
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Outcome TFCS-11// February Washington DC
PM 584 Competitive Success/snaptutorial.com
PM 584 Education for Service/snaptutorial.com
HSE Case: Risk Based Approach.
Lockheed Martin Canada’s SMB Mentoring Program
Verification Concepts for SysmL v2
Cybersecurity ATD technical
Definition of Project and Project Cycle
Information Technology Project Management
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Principal Investigator ESTCP Selection Meeting
Verification Concepts for SysmL v2
Principal Investigator ESTCP Selection Meeting
East Hall under construction
Presentation transcript:

Isabella Pagano & Roberto Ragazzoni - N-TOU and F-TOU Development Plan PLATO TOU Team meeting Catania, 28 Feb – 01 Mar 2011

Catania, 01 Mar 2011PLATO TOUs2 TOU organization of the Implementation Phase

Preparatory Activity during the Definition Phase A number of studies have been committed by the TOU team to a number of European industries: to assess procurement issues, to assess manufacturing, assembly and testing procedures, to highlight critical aspects, planning constraints and costs. The industries consulted are among those having potentiality to serve as prime contractors and/or sub-contractors. Catania, 01 Mar 2011PLATO TOUs3

Identification of procurement plan for lenses Selex Galileo (both spherical and aspherical lenses) Industrial plan for the procurement of material and manufacturing of 34 set of lenses. The study will include an analysis on the sharing of risks and responsibilities for the eventual involvement of subcontractors for providing part of the components (e.g., sharing the number or the type of optical components among different subcontractors). Delivery of the study is planned for April Catania, 01 Mar 2011PLATO TOUs4

Identification of procurement plan for lenses Seso (spherical lenses) An industrial contract has been given to SESO to produce a set of 6 lenses for the TOU Breadboard (TOU-BB), whose assembly is planned in the framework of the demonstration activities performed by the PMC Payload team. The procurement and manufacturing experience will allow to highlight critical aspects if any ifor the analogous activity to be performed during the implementation phase. Delivery is planned for end Mar Catania, 01 Mar 2011PLATO TOUs5

Identification of procurement plan for lenses Medialario/SAGEM-REOSC (aspherical lenses) Industrial plan for the procurement of material and manufacturing of 34 set of lenses. Identification of critical items, risk identification and mitigation plan. The activity will be performed jointly between MLT and REOSC (SAGEM) with the aim to provide a wider coverage of the technology options for polishing of this glass. Delivery of the study is planned for May Catania, 01 Mar 2011PLATO TOUs6

Identification of procurement plan for lenses Swiss industry (aspherical lenses) The University of Bern has issued a Statement of Work with the subject Assessment of the procurement of aspheric lenses. Goal: Assessment of production chain, schedule, risks, costs Additional (small) contract to investigate lens mounts options. The University of Bern has received one offer from RSSZ. Kick-off meeting in CW 7. The final report of this study is due on April 29, Catania, 01 Mar 2011PLATO TOUs7

Identification of procurement plan for the mechanical structure Swiss industry The University of Bern has issued a Statement of Work with the subject Assessment of the procurement of AlBeMet structures. The University of Bern has received several offers from Swiss industry, and has selected the offer from APCO. Goal: Assessment of production chain, schedule, risks, costs Kick-off meeting on CW 7. The final report of this study is due on April 29, Catania, 01 Mar 2011PLATO TOUs8

Identification of N-TOU AIV industrial plan Selex Galileo Study on the PLATO Telescope Optical Units AIV industrial procedures. The deliverable is the description of the AIV procedures, addressing the portability of the adopted procedures in the industrial contest, including risk assessment, development plan, and cost. Delivery of the study is planned for April Catania, 01 Mar 2011PLATO TOUs9

Identification of F-TOU AIV industrial plan Lenses and structure for both TOU types are mostly identical. Only difference is the coating of the window in F- TOU. Therefore, baseline integration procedure will be based on the AIV procedure of the N-TOUs, Based on the outcome of the AIV assessment for the N- TOUs, which is performed in Italy, the required infrastructure and procedures will be developed, procured and implemented at University of Bern. Currently, no prominent industrial involvement other than the delivery of components is considered. The University of Bern has experience with the AIV of optical instruments. The required facilities are partly available, but need to be adopted and extended for the F-TOUs. Catania, 01 Mar 2011PLATO TOUs10

Question from the System Team Is the equipment production during implementation phase under industrial responsibility? If the responsibility is under industry: If the laboratory was in charge of the design during the definition phase: Had some industry been associated to the definition in view of taking over the responsibility during the implementation phase? If YES we have to exhibit a list of the industrial contractors involved and we shall describe what were the tasks it have taken over during the definition. How is organized, at which date, the responsibility transfer to industry? What is the list of potential contractors, the contractual approach (ITT, AO …)? Catania, 01 Mar 2011PLATO TOUs11 N-TOU

Question from the System Team Is the equipment production during implementation phase under industrial responsibility? If the responsibility is NOT under industrial responsibility (i.e., it is under laboratory responsibility), we have to: describe how the design has been validated and secured during the definition phase, precise what will be the organization permitting to insure the equipment production (with or without industrial support) during the implementation phase, precise what will be the organization permitting to realize the integration and tests tasks (with or without industrial support), detail on which elements we can rely to consolidate the planning. Catania, 01 Mar 2011PLATO TOUs12 F-TOU

TOU Delivery Schedule Catania, 01 Mar 2011PLATO TOUs13 Preliminary results of Selex Galileo study confirm the possibility to follow the proposed schedule.

SAGEM input to schedule…