University of Wisconsin-Madison

Slides:



Advertisements
Similar presentations
R. Lee CMS EMU Alignment: 28 Feb, COCOA Simulation and Study of the EMU Alignment System Robert Lee CMS Endcap Alignment Muon EDR 28 February 2002.
Advertisements

1 James N. Bellinger 4-Feb-2009 ME+1 status and Endcap Z James N. Bellinger University of Wisconsin at Madison 4-Feb-2009.
Skeleton: Hardware Alignment for EMU meeting James N Bellinger 15-Mar-2009.
Steven Blusk, Syracuse University -- 1 Update on Global Alignment Steven Blusk Syracuse University.
Ms. Neal Geometry. In order to write an equation of a line, you will need two points: 1) Label each point (x 1,y 1 ), (x 2,y 2 ) 2) Substitute the information.
Kaori Maeshima (FNAL), Muon Alignment EDR: FEB. 28, Endcap Alignment EMU Alignment DAQ Muon Alignment EDR Feb. 28, 2002 Outline: 1.Components to.
1 Advanced Endplate - mechanics: Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
Draw Tools and Object. Array tool The product have repetitive feature.You don’t need to draw one by one. Use array tool is easy to finish these features.
Goal : Setup and monitor “chambers” with resolution of  < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line (2 Laser Redundancy) 1 Transfer.
First Reconstruction Results on the Alignment of Muon Endcap Chambers in the CMS Experiment at CERN S. Guragain, G. Baksay, M. Hohlmann Florida Tech 74.
Hand Crosscheck HSLM1. Position of REF DCOPS CENTER MAB Target DM distance DMdowel to DCOPS dowel DCOPS dowel to center.
1 Photogrammetry of TT7. 2 Front view Distribution of all targets All the plots are in the magnet reference system.
Alignment Software from the ME perspective Marcus Hohlmann Florida Tech Muon Alignment meeting during CMS week - CERN, March 15, 2005.
1 James N. Bellinger University of Wisconsin-Madison 27-November-2009 Status of Transfer Line Reconstruction James N. Bellinger 27-November-2009.
Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, Endcap Alignment Status of Offline Software Alignment CERN 17, 18 May 2001.
November 11 SESAPS 2006 Samir Guragain 1 Calibration, Installation & Commissioning of Sensors for the Alignment of Muon Endcap Chambers in the CMS Experiment.
Chamber Alignment Pins Δy = y PG – y nom. vs. Δx = x PG – x nom. M. Hohlmann 1, G. Baksay 1, S. Guragain 1, J. Bellinger 2, D. Carlsmith 2, F. Feyzi 2,
Alignment Meeting, CERN, Sept 19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field.
1 James N. Bellinger University of Wisconsin-Madison 2-February-2011 Status and Plans for Endcap Hardware Alignment James N. Bellinger 2-February-2011.
1 James N. Bellinger University of Wisconsin-Madison 13 February 2008 Cocoa Plans.
1 James N. Bellinger University of Wisconsin-Madison 13-August-2010 Endcap Processing Notes James N. Bellinger 13-Aug-2010.
EMU Meeting, CERN, Sept 18-19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field up.
1 James N. Bellinger University of Wisconsin-Madison 25-February-2011 Z-sensor News James N. Bellinger 25-February-2011 Good news this time!
1 James N. Bellinger University of Wisconsin-Madison 15-March-2009 Hardware Alignment.
1 James N. Bellinger Robert Handler University of Wisconsin-Madison 11-Monday-2009 Laser fan non-linearity James N. Bellinger 20-March-2009.
Week 2 This week we will discover our surroundings now we are stranded in the rainforest.
1 James N. Bellinger University of Wisconsin-Madison 19-Feb-2010 Status of Transfer Line Reconstruction James N. Bellinger 19-February-2010.
Motion Constraints Specialized Assembly Constraints that enable the assembly to be animated.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
James Bellinger, December CMS Week Muon Alignment James N. Bellinger University of Wisconsin at Madison 5-December-2006 DCOPS Data from MTCC2.
University of Wisconsin at Madison
HOW LONG DO STUDENTS IN MS. MATHEW’S CLASS PREPARE FOR A MATH TEST?
EMU Alignment DAQ Endcap Alignment Muon Alignment EDR Feb. 28, 2002
ORTHOGRAPHIC PROJECTION
HPS Collaboration meeting, JLAB, Nov 16, 2016
University of Wisconsin-Madison
University of Wisconsin-Madison
Status of Transfer Line Reconstruction University of Wisconsin-Madison
Status and Plans for Endcap Hardware Alignment
Transfer Line and CSC Rφ Reconstruction
Plus Endcap Transfer Lines
Status of Transfer Line Reconstruction University of Wisconsin-Madison
DCOPS Readout before and during MTCC
IB BIOLOGY INTERNAL ASSESSMENT
ORTHOGRAPHIC PROJECTION
University of Wisconsin at Madison
University of Wisconsin-Madison
Validating Transfer Line Fit University of Wisconsin-Madison
Starting from the Basics
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
Drawing From Observation
Sampling Distributions
University of Wisconsin-Madison
University of Wisconsin-Madison
Comparing Laser Fit to Barrel Fit University of Wisconsin-Madison
University of Wisconsin-Madison
Status of Transfer Line Reconstruction University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
Inductive Reasoning Drawing a conclusion based upon repeated observations.
CMS Week Muon Alignment
Transfer Line Calculations
University of Wisconsin at Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
Physics 122B Electricity and Magnetism
Presentation transcript:

University of Wisconsin-Madison DCOPS Update James N. Bellinger University of Wisconsin-Madison 13-October-2009 James N. Bellinger 13-October-2009

External Validation PG exists for pre-field endcap disks PG exists for 8 transfer plates after CRAFT As of Monday night, no other relevant PG is available. The 8 transfer plates are supposed to be ready in CMS space later this week Recalculating the transfer plate positions gives tighter fit vs PG spreads James N. Bellinger 13-October-2009

Internal Validation of Z Z studies based on drawings and MAB fits strongly suggest that something is amiss in the Plus Endcap at transfer line 5. Omit this and estimate the endcap rotations using only un-PG-corrected transfer plate Z estimates (comparison shown later) James N. Bellinger 13-October-2009

Internal Validation of X/Y Consider the slice through the detector along the SLM2/Z plane Motion of the disks along the SLM line will appear in the L/R DCOPS measurements, in opposite directions on each side Lasers from each side should give the same pattern of center deviations from a line drawn from ME+4 center to ME-4 center PG measurements of TP positions should do the same, but with opposite sign James N. Bellinger 13-October-2009

Example TP 1 and 4 Animated GIF Will not display in PDF Laser diffs (black) agree well with each other within a single line Cocoa fit includes other constraints No PG for MAB Large excursions in central region James N. Bellinger 13-October-2009

Internal vs External Combining before and after PG (unwarranted and inaccurate) gives me deviations from the internal estimates of 4 transfer plates: 11.5, 3.4, 13.3 and 4.8mm Rotation estimates from Z are not fully consistent with (inappropriate) PG rotX fit (mrad) rotY fit (mrad) OLD PG rotX OLD PG rotY YE+1 -0.44 -0.07 -0.26 -0.23 YE+2/ME2 -0.60 0.10 0.23 -0.13 YE+2/ME3 -0.55 -0.08 YE+3 -0.73 -0.21 -0.54 -0.24 James N. Bellinger 13-October-2009

Pre-CRAFT Hack I used the CMS-SG-UR-0140 pre-CRAFT survey numbers in a Plus Endcap model together with my Transfer Plate PG numbers I don’t have Link data for this period I did not attempt to predict what the positions would be after the disks pulled together James N. Bellinger 13-October-2009

Example results: ME+1/3 Center Z (mm) Floating/fixed Tilt (in-out) (mrad) ME+1/3/03 6872.78/6874.04 2.19 ME+1/3/09 6871.37/6872.22 3.53 ME+1/3/14 6870.51/6871.54 3.43 ME+1/3/20 6870.50/6873.62 0.24 ME+1/3/27 6875.73/6874.49 6.60 ME+1/3/33 6876.74/6876.84 4.13 Dubious about slopes here: need better Link coordination!

Conclusions? Correcting Dave’s PG numbers for the relative positions of the transfer plates helps noticeably. I still have nothing to compare Z estimates from the Z-sensors to, or PG useful for aligning the SLMs. All we have is pre field- on. It could use some tweaking. Numbers for ME4 are supposed to be ready this week James N. Bellinger 13-October-2009

BACKUP “I've been working for five days without any sleep to finish this report. At first I had a mental block. But on the fourth day I was visited by an Incan monkey god who told me what to write. Now I just have to find somebody who can translate his simple but beautiful language.” Scott Adams James N. Bellinger 13-October-2009