“Configure the Right Concept, Know How to Deliver It”

Slides:



Advertisements
Similar presentations
Enterprise Systems Engineering One Systems Engineer's View Stephen J. Sutton, P.E. Enterprise Systems Engineering (ESE) Panel Presentation & Discussion.
Advertisements

Air Transport System JTI CLEAN SKY
PRIMA © PRIMA Consortium All Rights Reserved 1 PRIMA Project Project funded by the EC under the Information Society Technology /2002 News ways of.
Supporting Manufacturing in the South West 8 th November 2012 Brian Fowler Semta Operations – South West.
The System Development Life Cycle
The Challenge of Implementing an ERP System in a Small and Medium Enterprise Andrew C. Stephens 9/19/2012.
December 1 st, SharePoint Lifecycle management With Project Server 2010.
Winning Ways for Oral Competitions 2014 Mid-Atlantic Conference & Expo Sheraton Premiere Tysons Corner Lawrence Tracy, David Taylor, and Dan Shyti.
All rights reserved © 2002, Alcatel — 2 Day 2: Wednesday 5 June :00am Session II Broadband: The Demand Side Broadband and The Borderless Enterprise.
Unclassified. Program Management Empowerment and Accountability Mr. David Ahern Director, Portfolio Systems Acquisition AT&L(A&T) 14 April 2009 The Acquisition.
Jeff Sestokas November 10, 2009 ARA Project Manager Course Introduction Project Management for ARA Engineers and Scientists.
Industrial Engineering Primary Responsibilities within the Service Industry Institute of Industrial Engineering Industry Advisory Board Business Planning.
ITS Software A TxDOT Statewide Perspective Charlie Farnham ITS Configuration Manager ITS America June 6, 2007.
1 South Limestone Street | Springfield, Ohio | | ren-services.com Renaissance Services: Capabilities, Experience, and Solutions November.
PTC Product Overview.
Data On Call: Strategic Plan Deanna Lynch. Introduction  Background  Long Term Objectives  Vision, Mission, and Values  Internal and External Analyses.
ETICS2 All Hands Meeting VEGA GmbH INFSOM-RI Uwe Mueller-Wilm Palermo, Oct ETICS Service Management Framework Business Objectives and “Best.
THE VALUE OF BREADTH Christopher Oster Lockheed Martin SERC Fellow Copyright Christopher Oster © 2012 All Rights Reserved.
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
ECM in SaaS mode to maximize information sharing in a globalized world Business case: bwin.
The Borregaard Way Corporate Culture and Core Values June 2014.
NETE Computer Network Analysis and DesignSlide 1 Documenting Network Design NETE-4635 Computer Network Analysis and Design.
-concepts - Functions - Features - challenges. Some definitions…  Human resource management (HRM), or staffing, is the management function devoted to.
IT Challenge Tutorial. What is the IT Challenge Business strategy IT Know-How Creativity Application of skills Industry, customer and problem analysis.
Repurpose, Compose, Profit— Next Generation SOA Infrastructure William Cox Cox Software Architects LLC Copyright 2008.
Federal Acquisition Service U.S. General Services Administration Karl Krumbholz Director, Network Services Programs Integrated Technology Services Federal.
18/02/2016 Oakey Enterprises Limited Copyright 01/08/2011 Design Phases for Project Delivery A presentation by MARK HALL CEO OAKEY ENTERPRISES LIMITED.
© Copyright 2004 Frost & Sullivan. All Rights Reserved. Product Lifecycle Management (PLM) Markets for Life Sciences Product Document Management (PDM)
Cyber Security ⃝ Managing risk is at the forefront of every financial professional’s mind. CFMA Southern Ontario invites you to join in the discussion.
Industry Relation Report Reza Dizaji VP Industry Relation Jan
The System Development Life Cycle
Upturn Consulting 27, March 2017.
Instructional slide to Partner: REMOVE BEFORE PRESENTING TO CUSTOMER
Lecture 20 Revision class.
“TRIZ: The Theory of Inventive Problem Solving”
Introduction to Project Management
INVENTORY REDUCTION WORKSHOP
Corporate presentation
DoD Lifecycle Changes that affect you!
Insurance Business Group, Dubai
2017 Corporate Overview.
“You’ll know him by his dedication”
Resiliency – an Emerging “ility”
Service Catalog Versus Request Portal
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Introduction to Tech Communication & Project Management Arthur C.M. Chen , Rm
Tuition Reimbursement Cap Waiver Proposal
Name of the speaker Company/University/Organization name
Solution About Challenge
All Content © Ecomass, Ecomass. Boeing to Use Parts Made From Thermoplastic Composite Materials Boeing recently awarded a multiyear contract.
Employcoder - Indian Company For Offshore Software Development Services
Messaging: A New Approach for Executive Conversations:
The System Development Life Cycle
© 2016, 2017 Change Healthcare Solutions, LLC. All Rights Reserved.
The MasterCard Foundation – Prophix story
Dassault Systèmes and The Global Grand Challenges
NAE Global Challenge Scholars Program Annual Meeting on October 30.
Managing Technology at Plantronics
The Brix Group – Prophix story
Monday 9th April – Friday 13th April 2018
The role and value of the pre-sales person in the sales cycle
Methodologies for Understanding Behavior of System of Systems
The Digital/Physical Interface Transformation
WPX Delivery Solutions Scheduled Courier
Magnolia Hospitality Group – Prophix partner story
Product Stewardship Institute Advisory Council Meeting The Lenox Hotel – Boston, MA September 14, 2012.
Project delivery RIBA stages Define design deliver Key Objectives 1 2
Registered Investment Advisors BARIA Aaron Baker, Managing Director
Accenture Federal Services (AFS) Class Presentation
Sodales Enterprise Health and Safety | Business Transformation Study | Public Sector Healthcare North America’s Leading Healthcare Provider Enables Worker’s.
Presentation transcript:

“Configure the Right Concept, Know How to Deliver It” April 2016 Meeting “Configure the Right Concept, Know How to Deliver It” Speaker: Brian Christensen Dassault Systèmes Date: 28 April 2016 Time: Lunch 11:00 a.m., Presentation: 11:30 a.m.-12:30 p.m. Location: 28 April 2016, Boeing Building 270.E15, Conf Rm 550 Abstract: In today’s competitive aerospace and defense (A&D) markets, companies must have efficient processes to develop and propose system configurations that can be delivered on time, are responsive to the RFP, technically feasible, and competitively priced. Brian Christensen from Dassault Systèmes will present how companies use the "Winning Program" software solution to empower employees with secure access to full-program data, enhanced trade studies management, and the ability to define and manage proposed system configurations. Speaker bio: Brian Christensen is an Aerospace & Defense Solution Experience Director for Dassault Systèmes. In this role, Christensen provides leadership and strategic direction for the company’s Aerospace and Defense solutions. Specifically, working with the global customer base, Brian focuses on addressing customers’ challenges in the early phases of a program/contract, concentrating on proposal management and system selection. From 2009 to 2011 Brian managed the deployment of Dassault Systèmes Product Lifecycle Management solutions at the Boeing Company. The primary focus was on the definition and deployment of systems to support the 787 program. Brian has over 20 years of experience in business development and project management for the aerospace industry. Brian earned a Bachelor of Science and Master of Science in Mechanical Engineering from Brigham Young University and Texas A&M respectively. RSVP: Reservations not required. Non-Boeing visitors must contact Lou Pape (louis.e.pape-ii@boeing.com) or Jake Hertenstein by 26 April to request a Boeing visitors badge. Cost: Free for INCOSE members, donation requested from non-members