Building Information Modelling - UK Transition to ISO standards

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

Hussey Fraser Solicitors
Government Construction Strategy (for England)
GReening business through the Enterprise Europe Network EN Giovanni FRANCO European Commission Enterprise and Industry EN
Design research base in Scotland value circa: £30,000,000 in externally funded research
The BIM Project Execution Planning Procedure
The BIM Toolkit Stephen Hamil – March 2015 – v2.0.
Green Paper on National Strategic Planning The Presidency November 2009.
Information Assurance Market Research June Executive Summary Small response rate (n=43) General low awareness of information security controls and.
Last Updated 1/17/02 1 Business Drivers Guiding Portal Evolution Portals Integrate web-based systems to increase productivity and reduce.
D2N2 LEP Skills for a Productive Workforce Construction University of Derby, Enterprise Centre 24 th July 2015.
Driving Innovation Concept to Commercialisation A strategy for business innovation, David Bott Director of Innovation Programmes Mark Glover.
Working Groups Updates Challenges for the housing industry in the Digital Economy BIM - Building Information Modelling.
ITCILO/ACTRAV COURSE A Capacity Building for Members of Youth Committees on the Youth Employment Crisis in Africa 26 to 30 August 2013 ILO Instruments.
Raj Chawla Chief Technology Officer and Projects Director at NUNELAH, Executive Member of UK BIM Alliance, Chair BIM4SME.
Richard Petrie CEO buildingSMART.
Commission of Inquiry into achieving best value in the procurement of construction. Andrew Smith Chair of NIEP Board National Improvement and Efficiency.
Phase-1: Prepare for the Change Why stepping back and preparing for the change is so important to successful adoption: Uniform and effective change adoption.
UNCLASSIFIED Lift the living standards and wellbeing of all Victorians by sustainably growing Victoria’s economy and employment and by working with the.
Integration of BIM in Lithuania
NATIONAL e-STRATEGY Presentation to the Portfolio Committee on Telecommunications & Postal Services DG: ROBERT NKUNA AUGUST 2017 Building a better life.
Implementing SMS in Civil Aviation: the Canadian Perspective
So what’s OGC’s role? Understanding where to find useful information
BIM2, BIM3 and technical information connections
Integrated Management Systems
OACCA Residential Transformation Conference
Performance Management System
MAINSTREAMING OF WOMEN, CHILDREN AND PEOPLE WITH DISABILITIES’ CONSIDERATIONS IN RELATION TO THE ENERGY SECTOR Presentation to the Joint Meeting of the.
Measuring Efficiencies In Construction
Aim of Economic Development
VisitEngland – Responding to a new environment
Perspectives of BIM Implementation in Romania
Victoria Australia (BUGVA).
Department of Myanmar Education Research
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
KEYNOTE STAGE SPONSOR.
1. Define a Vision & Identify Business Scenarios
Standards for success in city IT and construction projects
Building Information Modelling - UK Transition to ISO standards
Vision Facilitation Template
National Cyber Strategy Preparedness: 8 Preparatory Questions
Historical problems Tasks being done; just not coordinated and effective. No clear line of sight to client (Highways England) objectives. No defined asset.
Agenda What is a standard, who uses standards and what are they for?
Building Information Modelling - UK Transition to ISO standards
QUALITY MATTERS - OVERVIEW OF ISO QUALITY MANAGEMENT SYSTEM
THE REVISED ANNUAL PERFORMANCE PLAN
Building Information Modelling - UK Transition to ISO standards
Continuity Guidance Circular Webinar
CP6 and Growing the supply chain
Michelle Papayannakos
Strategic Boards Toolkit
Delivering a World Class Heartland:
Scotland’s Digital Health and Care Strategy
Digital Innovation Hubs – An overview Parallel session in Agri-Food Working Committee Bilbao, 28 November 2018 Annita Kalpaka, Policy Analyst JRC Unit.
Teams What is a team? Maintaining Focus
Simplification Meeting 10
For a European Industrial Renaissance
Building Information Modelling - UK Transition to ISO standards
Employee engagement Delivery guide
Portfolio, Programme and Project
Thematic workshop 2 – Smart Energy Systems Brussels, 8 November 2013
Key Cities and the Industrial Strategy
Smarter, Faster, Together
A Risk Management Approach to Business Continuity
Investing in Data Management Capabilities
Biodiversity, Natura 2000 & Green Infrastructure in the Regional Policy Mathieu Fichter European Commission, DG Regio Team leader "sustainable.
Folkestone & Hythe District Council
‘Regional Policy contributing to Sustainable Growth in EU 2020’
Industrial Value Chain: A Bridge Towards a Carbon Neutral Europe
Special Meeting of the Innovative Canadian Enterprises Advisory Committee June 10, 2013 Karna Gupta President and CEO, ITAC.
Presentation transcript:

Building Information Modelling - UK Transition to ISO standards

“ ” ISO STANDARDS BASED UPON USING BIM LEVEL 2 WRAPPER Why the transition? 1 “ BIM LEVEL 2 WRAPPER The working group recognises that at this early stage in the international maturity of BIM there is an opportunity for significant synergies in combined international effort in developing BIM policy, implementation and mobilisation strategies… A report for the Government Construction Client Group 2011 BASED UPON USING   ISO STANDARDS ”

Timeline Mobilisation of HM Govt Depts. for L2 BIM Lord Francis Maude Government Construction Strategy Level 2 BIM Mandate Departments have a clear capability and road map to Level 2 BAU Formation of BIM Task Group Making BIM Level 2 ‘Business As Usual’ 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Supporting standards BS EN ISO 19650-1 + National Foreword BS 1192: 2007 PAS 1192-2 PAS 1192-3 PAS 1192-5 PAS 1192-6 Bim-level2.org Low Carbon Construction Report BS EN ISO 19650-2 + National Annex BIM Strategy Paper Formation of Home Nations Working Group BS 1192-4 BS 8536-1 BS 8536-2 PD 19650-0 Guide to BS EN ISO 19650 Formation of CDBB Formation of UKBIMA DBB L3 Strategy Plan

ISO Standards International standards UK standards Q1 2019 BS EN ISO 19650-1: 2018 Organization of information about construction works — Information management using building information modelling — Part 1: Concepts and principles PD 19650-0 Guide to BS EN ISO 19650 BS 1192 BS EN ISO 19650-1 + National Foreword Organization of information about construction works — Information management using building information modelling – Part 0: Guide to BS EN ISO 19650:2018 PD 19650-0:2018 Organization of information about construction works — Information management using building information modelling – Part 0: Guide to BS EN ISO 19650:2018 BS EN ISO 19650-2: 2018 Organization of information about construction works — Information management using building information modelling — Part 2: Delivery phase of the assets BS EN ISO 19650-2 + National Annex PAS 1192-2

+ ISO Standards Q1 2019 International standards UK standards PD 19650-0 Guide to BS EN ISO 19650 BS EN ISO 19650-1: 2018 Organization of information about construction works — Information management using building information modelling — Part 1: Concepts and principles BS EN ISO 19650-1 + National Foreword Organization of information about construction works — Information management using building information modelling – Part 0: Guide to BS EN ISO 19650:2018 PD 19650-0:2018 + Organization of information about construction works — Information management using building information modelling – Part 0: Guide to BS EN ISO 19650:2018 PAS 1192-3:2014 BS 1192-4:2014 BS EN ISO 19650-2: 2018 Organization of information about construction works — Information management using building information modelling — Part 2: Delivery phase of the assets BS EN ISO 19650-2 + National Annex PAS 1192-5:2015 BS 8536-1&2

International BIM standardisation Committee: ISO/TC 59/SC13 Construction works information ISO 19650-1 BIM Concepts and principles (based on BS 1192) (Jan 2019) ISO 19650-2 BIM Delivery phase of assets (based on PAS 1192-2) (Jan 2019) ISO 19650-3 Operational phase of assets (based on PAS 1192-3) (2020) ISO 19650-5 Security-minded approach to information management (based on PAS 1192-5) (2020) Committee: CEN/TC 442 Building Information Modelling Adopts ISO/IECs i.e. all of the above Develops ENs to complement ISO/IEC Product data templates, data dictionaries and smart CE Marking Committee: B/555 Construction design, modelling and data exchange Coordinates UK input into CEN an ISO Adopts ENs and ISOs as British Standards Develops BS and inputs into PAS

FAQ’s 6 BS EN ISO 19650-1 and 2 are founded on UK’s standards for information Management using BIM as per BS 1192:2007+A2:2016 and PAS 1192-2:2013. The principles remain as per these standards with terminology changes explained via UK annex. Will the overall principles of BIM L2 stay the same? Principles of BIM L2 remain the same following ISO publication. It is not thought there will be any policy changes. However, the Home Nation Working Group will be working with BSI and the ISO Convenor to understand the need for any changes to their programmes around standards, terminologies, BIM L2 templates and the like. Any changes to current BIM policy of Home Nation countries? BS EN ISO 19650 is an internationalisation of the UK’s BIM L2 & contains all the same principles and high-level requirements with specific UK content contained in our National Annex. ISO documents do look different, particularly in terminology they use (such as ‘’appointing party’’ instead of employer’’) Main changes between BIM L2 and its ISO equivalent Any new roles or responsibilities that ISO introduces? No. Roles are called ‘’functions’’ in the ISO, and this should help avoid the often-held view that new job-titles and team members are required, which was never intended to be the case.

Joint statement ‘’ We are committed to a co-ordinated approach to creating and communicating an international wrapper for UK BIM and ensuring a smooth transition in the integration of BS EN ISO 19650-1 and 2 within our suite. Collectively we will develop and champion one single set of guidance in a clear and concise manner to support industry understanding and message how to make the shift without confusion BSI, CDBB, UKBIMA

About Us BSI is the business standards company that enables organizations to turn standards of best practice into habits of excellence. For over a century BSI has championed what good looks like and driven best practice in organizations around the world; helping clients improve performance, manage risk, grow sustainably and ultimately be more resilient.   The Centre for Digital Built Britain is a partnership between the Department of Business, Energy & Industrial Strategy and the University of Cambridge to deliver a smart digital economy for infrastructure and construction for the future and transform the UK construction industry’s approach to the way we plan, build, maintain and use our social and economic infrastructure. The UK BIM Alliance represents and works with and for the Built Industry, facilitating the drive to digitally transform the Industry through education, leadership and focus. In an industry of over 4M people, where 95% work in SMEs or micro-SME’, our mission is to ensure BIM becomes business as usual whilst at the same time, transforming and future proofing the way the industry works. .