Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010.

Slides:



Advertisements
Similar presentations
I-95/Route 630 Interchange, Alternative E FUNDING (Cumulative) SCHEDULE JULY 2007 JULY 2008 JULY 2009 JULY 2010 JULY 2011 JULY 2012 JULY 2013 JULY 2007.
Advertisements

Replacement of the Queens Approach Bronx-Whitestone Bridge
Mentoring New Educators
Internalizing Stormwater Requirements Between TBR and Facilities Construction Projects and Permanent Stormwater Treatment Mgmt. Steve Casey, PE, CPESC.
Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010.
Roles and Responsibilities. A good ITCP program may involve a number of key people: Safety Professional Inspectors/Quality Control Superintendent/ Project.
TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
MMIS Re-Bid Project Human Services Department August 24,
Essentials of project management Lecture 8. Targets of Lecture Introduction to project management –Understanding the target process in typical projects.
Audrey Desjarlais, Signetwork Coordinator Survey Findings SPDG Initiative Goals SPDG Initiative Outcomes.
Wireless Inspections Project Regulation and Licensing Department Implementation Certification Meeting April 27, 2011 Lori Hewig, IT Director David Martinez,
Digital Highways Digital Highways What are they? Why do we need them? How do we get there? Ron Singh, PLS Chief of Surveys/Geometronics Manager Oregon.
FLY Teacher Induction. Purpose of Teacher Induction Develop and continue lifelong learning for both the new teachers and mentor teachers to improve student.
The CSO Abatement Project Presented by: Paul Nordstrom Director of Operations and Engineering.
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
OTIA III State Bridge Delivery Program CEI Tool Ron Reisdorf, PE Senior Construction Engineer Oregon Department of Transportation April 9, 2008.
17 AND 18 AUGUST, 2010 EUGENE, OREGON RON SINGH CHIEF OF SURVEYS /GEOMETRONICS MANAGER OREGON DEPARTMENT OF TRANSPORTATION Design to Dozer.
1 Automated Machine Guidance: Electronic Files and Design Data AASHTO Subcommittee on Construction Meeting August 18, 2010 – Burlington, VT Mark Taylor.
Working with 3D Models in Design & Construction Panel Discussion 1.
PIONEER HIGH SCHOOL WEST STADIUM PHASE 1. EXECUTIVE SUMMARY Erickson Hall (EHCC) was the awarded the Pioneer High School Phase 1 Construction Contract.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
FIDIC CONFERENCE 2005, BEIJING Workshop 13 Design & Build - Role of Consulting Engineers in the Tender Process Tse Yau Shing.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
Safety Project Request received by TDOT Safety Project Request sent to RSAR Coordinator Safety Planning Office completes Letter of Findings for internal.
GEAR UP Instructional Technology Cohort. Introductions Kim Gardner GEAR UP Professional Development Coordinator Responsible for administration and effective.
Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Roadway Conference 13 April, 2010.
BP, OQ & You. 2 Why do we have OQ? Walnut Creek 3 Bellingham Washington.
AASHTO Subcommittee on Construction 2010 Annual Meeting Summary of C&T Section Work Plan Surveys August 16–20, 2010 Summary of C&T Section Work Plan Surveys.
Pen testing to ensure your security
Construction Work Packaging
Testing Web to Wireless …and Back March 2001 Presenter: Shirley DeLewis, CQA, CSTE, CPSA.
NC Region Speakers:. Now What?  EBS  Pothole  Vac Truck  T & M  Force Account  Con Mod/Change Order  LCS  QMP (QC, QV, IA)  QC  QV  IA Excavation.
TH 2 – Wilton Bridge Replacement Design-Build Project S.P March 5, 2009 Todd Vonasek, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
Western Regional Gas Conference August 24, 2010 Distribution Integrity Management Programs (DIMP) Rule.
Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc Ohio GIS Conference.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Specification & Quantities Estimating
RBM and Asset Strategy.
Chapter 2 Introduction to Construction Procedures
Divisional Managers Commitment to the Diagnostic and Unit Rate Study Consultancy Services for Monitoring of Contractors/Consultants Performance And Establishment.
Report on the Challenges in the Planning and Procurement of Services for the Ceres and van Rhynsdorp Correctional Facilities Portfolio Committee on Correctional.
Matt Eitrem GIS Coordinator City of Ashland Wisconsin.
Douglas Townes FHWA Resource Center 3D Engineered Models for Construction - Implementation March 14, 2013 | Washington, DC TRB Committee on Intelligent.
Distribution Project/Program Management Don Stanton, PMP SWEDE Conference May 10, 2007.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
SAFE 543 Construction Safety Week One Chat Session Review of Syllabus Review of Case Studies Format for Preplanning Guide Chat Session Guidelines Case.
Systems Analysis and Design in a Changing World, 6th Edition
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 Implementing a Model Based Approach to Design at Wisconsin.
Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.
Matthew Johnson Harris County Matthew Johnson Harris County.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
Construction Inspection for Field Office Activities Welcome by SCE Introductions Name Position (SCT, SC, DC, CET, ETC) Location Instructors 1.
Civil Engineering Surveying Roy Frank. Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’
SYSE 802 John D. McGregor Module 0 Session 3 Systems Engineering QuickView.
2014 – 2015 EVALUATION PERIOD KCTCS ePerformance Training.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.
Construction Work Packaging
Existing Facilities Construction Safety & Performance Evaluations
Team Organization.
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
CONTROL OF BUILDING SITES
CONTROL OF BUILDING SITES
Department Of Energy Review Linac Coherent Light Source Project
Ward Park Restroom Timeline
Presentation transcript:

Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010

2 Construction Automation Plan Design to Dozer – Ron Singh

3 Introduction The overall Construction Automation Plan (as envisioned today) could be developed and accomplished in (3) 2 year phases, beginning in 2009 and being fully implemented by We fully expect that technologies will change over time, and the plan will be adjusted as necessary to adapt to those changes. Design to Dozer – Ron Singh

Digitally signed Contract Plans and related documents Continued 2½D design data – standardized and formatted to support this periods machine control and survey stakeout goals Digital Engineering Data available to contractor in stages as needed Machine Control focused on roadway excavation and grading, and trench excavation for pipe installation Continue the concept of Contract Plans as Primary and Engineering Data Packet as Secondary Design to Dozer – Ron Singh

(contd) Construction surveyors available for high precision positioning checks, stakeout, and Post Construction Surveys Inspectors utilizing hand held devices to manage construction documentation – they would not have access to high precision positioning tools. Post Construction Surveys (short list) Designers, Drafters, Surveyors, and Inspectors trained to accomplish these goals Design to Dozer – Ron Singh

True 3D design data (short list) Design data should be on the new low distortion Oregon Coordinate Reference System Digital Engineering Data Packet available to contractors upon Bid Notice (short list) Redefine Engineering Data Packet as Primary and Contract Plans as Secondary Post Construction Surveys (complete) Designers, Drafters, Surveyors, and Inspectors trained to accomplish these goals Design to Dozer – Ron Singh

D design data (3D design coupled with construction schedule) Digital Engineering Data Packet to include all elements of construction Inspectors utilizing hand held high precision positioning tools with onboard design data for field verification Project Connected Site – Wireless data hub Designers, Drafters, Surveyors, and Inspectors trained to accomplish these goals Design to Dozer – Ron Singh

8 Stay Tuned… Design to Dozer – Ron Singh