Global Post Mortem Event Event Timestamp: 15/06/12 15:54:

Slides:



Advertisements
Similar presentations
6 th April 2010 MP3 weekly summary – issues and follow-up 0v1 M. Zerlauth for the MP3-CCC shift crew.
Advertisements

LHC Beam Operation WorkshopM. ZerlauthDecember 2010 Thanks to : CERN Machine Protection Panel, EICs, et al 1v0 Do we understand everything about MP system.
12/03/2013MPP Workshop Annecy Update on Beam Failure Scenarios Jan Uythoven Thanks to: T.Baer, R.Schmidt, J.Wenninger, D.Wollmann, M.Zerlauth, other MPP.
PIC configuration (maskable/unmaskable circuits) I. Romera MPP meeting –
Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
LHC Status Sat Morning 18-June Bernhard Holzer, Gianluigi Arduini et al Tentative Planning: Luminosity 1092 x 1092 Access: installing low pass filter at.
Premature Dumps in 2011 Acknowledgements: A.Macpherson, G.Papotti, M.Zerlauth M.Albert LHC Beam Operation Workshop December 2011.
UTC-Timing problem P.Charrue for the BE/CO/Timing team 1.
Interlock and Protection Systems for SC Accelerators: Machine Protection System for the LHC l The Risks l The Challenge l The LHC Layout l The Systems.
LHC BLM Software revue June BLM Software components Handled by BI Software section –Expert GUIs  Not discussed today –Real-Time software  Topic.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Friday morning Dump fill due to the trip of the RQF.A78  intervention had been just planned for the morning on the circuit Access, interventions:  RQF.A56/78,
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
1 Will We Ever Get The Green Light For Beam Operation? J. Uythoven & R. Filippini For the Reliability Working Group Sub Working Group of the MPWG.
ESS Timing System Prototype 2012 Miha Reščič, ICS
BCT’s for beam protection L. Søby On behalf of D. Belohrad, L. Jensen and P. Odier 6/12/15Internal workshop ON MPP readiness for MJ beams 1.
Post Mortem Workshop Session 4 Data Providers, Volume and Type of Analysis Beam Instrumentation Stéphane Bart Pedersen January 2007.
PM System Architecture Front-Ends, Servers, Triggering Ingredients Workshop on LHC Post Mortem Session 1 – What exists - PM System, Logging, Alarms Robin.
1v2 LHC Availability Tracking: Past and Future B. Todd, A. Apollonio, L. Ponce on behalf of the LHC AWG.
07:30 – 10:30 Asynchronous dump test with Beam 2. No issue found. FIDEL update. Now chromaticity decay corrected. 12:13 Beam dump due to problem in the.
Interfacing the FMCM for additional protection in the LHC and the SPS- LHC/CNGS Transfer Lines to the CERN controls system Cristina Gabriel Casado, Interlock.
LHC machine protection close-out 1 Close-out. LHC machine protection close-out 2 Introduction The problem is obvious: –Magnetic field increase only a.
MPE Workshop 14/12/2010 Post Mortem Project Status and Plans Arkadiusz Gorzawski (on behalf of the PMA team)
Failure Analysis Tools at DESY. M. Bieler, T. Lensch, M. Werner, DESY ARW 2013, Melbourne,
The LHCb Online Framework for Global Operational Control and Experiment Protection F. Alessio, R. Jacobsson, CERN, Switzerland S. Schleich, TU Dortmund,
Machine Protection Review, Markus Zerlauth, 12 th April Magnet powering system and beam dump requests Markus Zerlauth, AB-CO-IN.
Introduction; Machine protection, experience and challenges: Review of existing solutions and challenges faced by future installations Purpose of machine.
LHC Beam Commissioning Meeting V. Kain & R. Alemany
The TV Beam Observation system - BTV
LHC General Machine Timing (GMT)
DRY RUNS 2015 Status and program of the Dry Runs in 2015
2007 IEEE Nuclear Science Symposium (NSS)
BEAM LOSS MONITORING SYSTEM
Dependability Requirements of the LBDS and their Design Implications
MD2036: UFO dynamics studies and UFO fast detection
J. Uythoven for the MPE-MI & MS Teams
Fast losses at collimators during 16L2 dumps
Automatic Generation of the Radiation Level Weekly Reports Update 18
Monday 21st January & night
Beam dump on LHC beams dumped on 08:20:04 by SIS, following a failing BLM HV check in IR7.
Monday 14th March Second fill with pilot + 3 nominal bunches
Wednesday 17th August Rocky, short fills, initial luminosities are good LHCb polarity change to negative seems ok 18/08/2011 LHC 8:30 meeting.
CNGS Proton Beam: Introduction
BEAM LOSS MONITORING SYSTEM
Initial Experience with the Machine Protection System for LHC
LHC Morning Meeting - G. Arduini
Fri 15th – Sun 16th June Friday Saturday Sunday Monday
Summary of week 22 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Remote setting of LHC BLM thresholds?
Machine Protection Xu Hongliang.
Thu 19/5 06: :00 Investigations from vacuum and cryogenics
Dry Run 0 Week 13: BI test of...everything circulating beam: all fixed displays and BI applications OP directories for 2009, concentrators running Need.
M. Zerlauth, I. Romera 0v1.
Beam dump on 07. Sept 2012, Caused by RTQX2.R5 (SEU?)
Sunday
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
LHC dry-runs (BE-BI view)
Machine Protection System Commissioning plans
1v1.
Will We Ever Get The Green Light For Beam Operation?
Commissioning of the Beam Conditions Monitor of the LHCb Experiment at CERN Ch. Ilgner, October 23, 2008 on behalf of the LHCb BCM group at TU Dortmund:
BCM-BIS Interface Szandra Kövecses
LHC BLM Software audit June 2008.
R2E LMC Update (Weeks 32/33) Post-Mortem database: SEE analysis and link to existing RadWG list in preparation Shielding block delivery crisis solved:
Friday 15th February - morning
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
What systems request a beam dump? And when do we need them?
Close-out.
SPS Injection BIS - Draft requirements
Tuesday
Presentation transcript:

Global Post Mortem Event Event Timestamp: 15/06/12 15:54:55.343 Loss of fill 2734 Global Post Mortem Event Event Timestamp: 15/06/12 15:54:55.343 Fill Number: 2733 Accelerator / beam mode: PROTON PHYSICS / STABLE BEAMS Energy: 3999960 [MeV] Intensity B1/B2: 15691 / 15005 [e^10 charges] Event Category / Classification: PROTECTION_DUMP / MULTIPLE_SYSTEM_DUMP First BIC input Triggered: First USR_PERMIT change: Ch 11-BLM_MSK: A T -> F on CIB.SR7.S7.B1 R.Schmidt / I.Romera

Loss of fill 2734 [ms] [ms] R.Schmidt / I.Romera

From BIS logs BLM triggered Beam dump request PIC only sees the Powering problem after ~60ms

From PIC R.Schmidt / I.Romera

Loss of fill 2734 – change of orbit B1 R.Schmidt

Loss of fill 2734 – change of orbit B2 R.Schmidt

From FGC Power converter only sends Powering Failure at 15:54:55.420 -One can see strange jump in current some ms before…

Beam losses beam 1 for fill 2734 R.Schmidt

Beam losses beam 2 for fill 2734 R.Schmidt

We would not have dared to test such case with high intensity beams Comments This has been one of the standard cases during the design of the MP system, and the reason for the diverse redundancy in the systems We would not have dared to test such case with high intensity beams MP worked as expected….. EPC should investigate how to send out a Powering Failure event in such case In order to no only rely on the BLMs, the Fast Beam Current Change Monitor is required … R.Schmidt / I.Romera