ECFA recommendations (September 2001:)

Slides:



Advertisements
Similar presentations
WDS Status Propose to create 6 sub-collaborations Propose to create 6 sub-collaborations Sub-collaborationSummary of Task 1Proton DriverDefinition of critical.
Advertisements

CERN First Considerations to implement nuSTORM on the CERN site “North Area Neutrino Hub” E.Wildner, CERN Wednesday, March 27, 2013Elena Wildner,
After ISS Where Do We Go From Here?. 21 August 2006P Dornan - After ISS2 Next - until the end of 2006  Produce the ISS Report - with the present team.
14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7.
ISS-4 22 August IRVINE Alain Blondel NEUtrino DETectors N-EU-DET 4-years working plan for Neutrino Detector R&D to take place in ~ objectives.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
Design Studies Rob Edgecock/RAL. Outline Introduction – a reminder Scope of WDS Current status Problems FP6 Design Study Status Plans Conclusions.
CHIPP Sept 2005Jean-Sébastien GraulichSlide 1 What is MICE  Muon Ionisation Cooling Experiment  What is Ionisation Cooling ? Cooling = Reduction of Beam.
Costing Workshop Summary Chris Rogers, RAL, 30 Mar 2010 Establish a common framework for costing of neutrino facilities Compare Beta Beam, Super beam and.
SG Det IA 2007 oct29 Alain Blondel ECFA study groups BENE (in CARE) Int'l Scoping Study (ISS) Steering group (EU): A.Blondel (Geneva) P.Soler (Glasgow)
Alain Blondel Neutrino physics in Switzerland collaborate among ourselves and in Europe to ensure a rich programme collaborate in T2K leading role in GLACIER,
Scoping study p-ECFA Alain Blondel ISS-detectors Introduction: working group plans, organization and aims of the meeting.
CHIPP Workshop on Detector R&D June - University of Geneva Common R&D for astroparticle physics: Activities of ApPEC and ASPERA Bernard Revaz and.
BENE Meeting April 28, 2006 A. Bross US Contribution to the IDS Aka WDS BENE IDS/FP7 at RAL April 28, 2006 A. Bross.
Introduction to EC Framework Programme 7 Rob Edgecock CCLRC Rutherford Appleton Laboratory Introduction to Framework Programmes “ “ FP7 Neutrino LOI Mapping.
ISS After One Year Peter Dornan Imperial College London.
21 August 2006P Dornan - After ISS1 Discussion  NuFact Talks Comments  Report 1 st Draft Oct – 60 Pages per WG Finalise before end of the year.
European design study on Neutrinofacilities - Euronu within FP7.
Anselmo Cervera Villanueva IFIC (Universidad de Valencia & CSIC) EURODET meeting 7 December 2007 Neutrino Networking activities.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Road Map of Future Neutrino Physics A personal view Ken Peach Round Table discussion at the 6 th NuFACT Workshop Osaka, Japan 26 th July – 1 st August.
Concluding remarks R. Aleksan CERN, November 25, 2005 CARE is almost 2 year old What comes next ?
WP4 - Design Studies. Outline Status of FP6 Design Studies Consequences High power targets MICE Neutrino detector R&D FFAGs WDS Status.
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee Paris, April 11, Introduction.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
Preparation of design study ICL May 2005 accelerator Alain Blondel ECFA/BENE Future Neutrino Beam studies Towards a comparison of options on equal footing.
A new underground laboratory at Frejus Jacques Bouchez CEA-SACLAY NNN05-Aussois April 7, 2005 Historical overview Latest developments Outlook.
The ISS Peter Dornan Imperial College London. 16 March 2006P Dornan - MUTAC `atmospheric’`solar’ `cross/reactor’ Oscillation defined by 3 mixing.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
Physics and Performance Evaluation Group NuFact 07 Okayama University, Japan August 6, 2007 Walter Winter Universität Würzburg for the executive committee:
27 Apr 2006P J Dornan - ISS3 - RAL Next Meeting 4 th ISS Plenary –Irvine Aug21, 22 (NUFACT06 Aug 24 – 30) Workshops –Physics Group, June, Valencia –Machine.
Neutrino Factory Design Study Introduction Introduction World Design Study status World Design Study status EC Framework 6 Design Studies EC Framework.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
F. Richard LAL/Orsay 1 ELAN in 2006 Annual Meeting.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
Neutrino detector IA request Lines of thought first meeting on 24 August 2007 on- the fly notes by AB present: Alain Blondel, André Rubbia, Anselmo Cervera,
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
NuFact06, 28 Aug 2006V. Palladino European Regional Outlook V. Palladino NuFact06 UC Irvine, Tue Aug 29, 2006 European Regional Outlook.
Neutrino detector IA request Lines of thought first meeting on 24 August 2007 on- the fly notes by AB present: Alain Blondel, André Rubbia, Anselmo Cervera,
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
1 How the Muon Ionization Cooling Experiment Found a Home MICE hall at RAL in Spring
A CCELERATOR S ESSIONS S UMMARY D AVE W ARK, I LIAS E FTHYMIOPOULOS Neutrino Strategy Workshop CERN, October 3, 2009 Outline  Show highlights from the.
Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
MICE news Alain Blondel 20 – NEWS 1.CERN’s SPSC at Villars: recommandations 2.MICE step Upcoming gateway steps 4.RF from LBNL (Mike)
TIARA-PP Governing Council 1 representative per contractor TIARA-PP Coordinator Industry advisory committee? Project Management (WP1) Project Office Dissemination.
ESGARD - 19th May 06 Very brief summary! 32 LOIs received LHC Upgrade
Final Discussion THE EUROPEAN STRATEGY FOR FUTURE NEUTRINO PHYSICS
Accelerator R&D for Future Neutrino Projects
The European Strategy for Particle Physics
Goal of the workshop To define an international roadmap towards colliders based on advanced accelerator concepts, including intermediate milestones, and.
Alain Blondel 11 October 2010 GDR NEU2012 summary
Status of the beta-beam study
The Way Forward ISS to IDS
European Detector R&D: AIDA
Outline: Why now ? What ? How ?
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
nuSTORM and the Physics Beyond Colliders workshop
Accelerator R&D for Future Neutrino Projects
The DBD: Outline and Scope
FP6 Design Studies ESGARD meeting 3rd September – from Roy Aleksan
A High Intensity Neutrino Oscillation Facility in Europe
A High Intensity Neutrino Oscillation Facility in Europe
Presentation transcript:

ECFA recommendations (September 2001:) MUTAC ( 14-15 jan 2003)(US) The committee remains convinced that this experiment, which is absolutely required to validate the concept of ionization cooling, and the R&D leading to it should be the highest priority of the muon collaboration. Planning and design for the experiment have advanced dramatically(…) EMCOG: (6 feb 2003) (Europe) (…)EMCOG was impressed by the quality of the experiment, which has been well studied, is well organized and well structured. The issue of ionization cooling is critical and this justifies the important effort that the experiment represents. EMCOG recommends very strongly a timely realization of MICE. MUTAC: Muon Technical Advisory Committee (Helen Edwards, et al) (US) EMCOG: European Muon Coordination and Oversight Group (C. Wyss et al)

2010

Recommendations december 2004 J. Feltesse CERN should make every reasonable effort to deliver the approved p.o.t. to CNGS. Future neutrino facilities offer great promise for fundamental discoveries. CERN should join the world effort in developing technologies for new facilities : Beta beams, Neutrino Factory…wherever they are sited. Focus now on enabling CERN to do the best choice by 2010 on future physics programme. Explore further synergies with EURISOL december 2004 J. Feltesse

SUPERBEAM and NEUTRINO FACTORY DS Edgecock FP6 Design Study SUPERBEAM and NEUTRINO FACTORY DS WP Title Responsible Summary 1 Management Edgecock Proton Driver Garoby Insufficient manpower 2 Targetry Bennett R&D on targets to prove viability; engineering of target station 3 Collection Campagne Viability of horn 4 MICE Blondel R&D on critical components 5 FFAGs Meot R&D on SC dipoles 6 Machine Haseroth Cost and performance optimised Neutrino Factory Design 7 Physics and detectors Mezzetto Strolin Define parameters for accelerator & detector, inc. detector cost Leading House = RAL ; minor CERN involvement

What did we achieve? from to Design Study A European Integrated Infrastructure Initiative for Long Baseline Neutrino Oscillation Physics What did we achieve?

X X Proposed structure Access to Networking Research Joint Infrastructures TA Networking activities (NA) Joint research activities JRA The 3 activities are mandatory for an I3 We were advised to submit a modest proposal Between 5-7 M€ total. The duration of projects should be 3 years. The focus should be BEAM AND EXPERIMENTS

NA1. project management OK

Joint Research Activities: JRA1: target and collection systems Lettry and Efthymiopoulos (CERN) proposed a nice set of activities (Tests of solid and liquid targets, Horn PS, TTA2?) collaboration with Polish group. (but: RAL, PSI?) JRA2: Muon beam at RAL Bradshaw (RAL) proposed a MICE based activity (spectrometer solenoid, detectors, manpower, international collab.) OK

MUST CONTINUE and EXPAND JRA3 Detector development for neutrino experiments Paolo Strolin We have identified four main fields of research on detectors that can be developed and improved in the future. 1. Large area or high sensitivity economical photon detectors 2. Large volume liquid argon detector possibly in magnetic field 3. Large magnetic detectors 4. Emulsion detectors Photo-detectors: proposal by Saclay (Mosca et al) issue raised: EU collaborators? Inclusion of Photonis, a private company. Magnetic detectors Ragazzi (Milano ex monolith) proposed to supervise design a 40kton mag detector. Liquid Argon. Obviously. But deadline was too close (A. Rubbia ETHZ) Activity on emlsions or similar was not identified MUST CONTINUE and EXPAND

group was identified but did not materialize. JRA4: Tools for analysis of neutrino oscillation experiments. group was identified but did not materialize. Steve King Eligio Lisi, Mezzetto, Donini, Rigolin, Hernandez, Gomez-Cadenas… Migliozzi, Lindner

J. Wood’s call offers a clear first goal: Next steps: J. Wood’s call offers a clear first goal: understand -- required DesingStudy structures is an associated I3 important? Is it CARE? -- the needed JRA’s -- preliminary studies -- workshops or meetings to be organized to gather the community. -- can build on n3 as seeds -- must build on BENE to avoid unnecessary accumulation of meetings -- need further seeds as n3 did not include such items as engineering, proton driver, acceleration, storage ring

start from where we are and move forward. Possibilities Wait until FP7: call 2006, 2007, …….. Submit Neutrino Factory I3: - call 4th November - 140MEUR - RA, DP: no chance for accelerator R&D proposal Do what we can with individual WPs: - Neutrino detector I3 - Non-scaling FFAG PoP NEST - Others? but do not wait… start from where we are and move forward.

Towards a Neutrino Factory scoping study The original plan from EMCOG was that RAL would be the mother house of the superbeam/NF DS. Ken Long received a letter from John wood to this effect. 17/01/2019

Background: Intellectual: Social: Political: Funding: Feasibility studies: US: I, II, Ia EU: CERN ‘yellow report’ JP: Design report Need inter-regional cooperation for ‘Study III’ Recognised at NuFct03 Social: Essential to develop collaboration Neutrino source for precision measurements of neutrino properties necessarily requires an international collaboration Political: European Strategy Forum on Research Infrastructure: Preparing roadmap for major research infrastructure Funding: FP7: Design Study call, expected autumn 2006 UK funding cycle

Scoping study: request for proposal

Scoping study: request for proposal Empowering invitation: Recognition of crucial nature of international partnership Framework for discussion leading to: Source(s) required for optimal precision exploration of neutrino properties Consensus on options to be taken forward; Identification of critical R&D items (h/w and concept development); Definition of interfaces, performance goals etc. that can be studied in the next conceptual design phase; Establishment of collaboration for the next phase.

Discussion: Just at the start; request only ‘a week old’ Take forward on afternoon of Thursday 17Mar05 Proposed timescale (working backwards): Hand in proposal: 27May05 Full draft of proposal: 13May05 Meeting to discuss/agree content: 08-08May05 RAL An exciting opportunity! (And much work to do)

-- Engelen agreed with my strong feeling that CERN should be associated with the upcoming Neutrino Factory design study and that the 'TESLA' story (a European lab designing an accelerator without CERN support or even with CERN pushing a competing solution) should not repeat itself. -- His opinion from discussing e.g. with the previous SPC chair (Joel Feltesse) is that Europe, countrary to Japan and apparently contrary to the US does not have a clear long term strategy for neutrino physics. Therefore he would like to suggest an independent committee to evaluate the situation and issue recommandations. -- His suggestion would be that such a committee could be generated in the framework of the SPC. The aim could be to make a clear recommandation for a choice between future options, i.e. beta-beam/superbeam and neutrino factory options or to define an ordering between them. (see discussion with Ken Peach tomorrow)