Status of FMS Refurbishment

Slides:



Advertisements
Similar presentations
Wavelength The distance between one point on a wave and another point exactly like it.
Advertisements

Booster Radiation Damage Facility (RDF) Some History The Radiation Damage Facility originated in the AP4 beam line, used primarily for testing the D0 Vertex.
CMS ECAL Laser Monitoring System Toyoko J. Orimoto, California Institute of Technology, on behalf of the CMS ECAL Group High-resolution, high-granularity.
Solid Target Studies in the UK Solid Target Studies in the UK Rob Edgecock On behalf of: J.Back, E.Bayham, R.Bennett, S.Brooks R.Brownsword, O.Caretta,
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Prepare DORIS for particle physics again F.Brinker, DESY, March 31 st 2008 Injector chain to Doris and Petra Situation at the IP-region Beam optic Work.
Commissioning needs MICO meeting 30 June 2008 MOM ( Roumen Tsenov)
Update on the RICH Beamtest The RICH Group M. Artuso, S. Blusk, C. Boulahouache, J. Butt, O. Dorjkhaidav, A. Kanan, N. Menaa, R. Mountain, H. Muramatsu,
Update on FMS Repair Stephen Trentalange STAR Management Meeting October 31,
CDC Scrutineer Talk Elliott Wolin GlueX Collaboration Meeting Jefferson Lab 9-Sep-2004.
Status of the PiN diodes irradiation tests B. Abi( OSU), R. Boyd (OU), P. Skubic (OU), F. Rizatdinova (OSU), K.K. Gan (Ohio State U.)
NEUTRON EDM Philip Harris, on behalf of the CryoEDM collaboration: Rutherford Appleton Laboratory University of Oxford University of Sussex ILL University.
Status of scintillator KLM study P. Pakhlov (ITEP)
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006 All data sheets can be found at:
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
What Is a Synchrotron? From the BNL Website Introduction The human eye can see only visible light. It comes in the form of different wavelengths. These.
1 Jim Thomas - LBL The Mechanical Integration Challenge for New Tracking Detectors in STAR Jim Thomas 07/10/2006.
PHOBOS TOF Construction Status
Ondřej Svoboda for the ECAL group HADES collaboration meeting XXV, 19 – 23 November 2012 GSI.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
Mu2e WBS 2 Accelerator Progress Report Mu2e WGM 6/15/2011 Steve Werkema L2 Manager for the Accelerator Systems.
Introducing gigahertz-bandwidth photodetectors for the visible and near-IR spectral range that provide highest performance-to-price ratio available today!
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006.
Yi Qiang May 11,  The last week of E and E  Finished the productions with 3-pass and 2- pass beam with abundant statistics.  BigBite.
Sorting Technologies for CCA Treated Wood. Objective To design and implement an automated system to effectively sort CCA treated wood from other wood.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 22, 2011.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
E.Guschin (INR,Moscow) 9 December 2008LED system meeting CERN Plans: PS/SPD LED monitoring system tuning Online histograms. Presenter for group of 16(64)
E. A. Albayrak, HCAL Meeting, Fermilab, Nov HE CALORIMETER DETECTOR UPGRADE R&D STATUS E. A. Albayrak for The University Of Iowa Fairfield University.
Update on FMS Repair STAR Management Meeting: Oct Stephen Trentalange.
COMET. μ-e conversion search from muonic aluminium J-PARC pulsed proton beam to produce pulsed muon beam Forbidden in the Standard Model  clue to the.
Quartz Plates R&D Status By F. Duru, S. Ayan, U. Akgun, J. Olson, Y. Onel The University Of Iowa V.Podrasky, C. Sanzeni, D.R.Winn Fairfield University.
CLAS12 Drift Chamber Prototyping
2016/3/31 Fast kicker Experiment at ATF ATF2 - 40nm beam production, measurement Extraction kicker The difficulty of the beam extraction is that the kick.
F ERMILAB T EST B EAM F ACILITY Aria Soha June 12, 2012.
The Lead Glass Detector Overview, Experience and Direction.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
Gamma Detector of Plastic Scintillator Oct. 2, 2009 IP-BSM Group 1.
DON LYNCH OCTOBER 28, October 28, 2014 sPHENIX Detector Integration & Assembly Concept.
ATLAS LAr Forward Calorimeters C. Zeitnitz (Universität Wuppertal) for the ATLAS LAr Community.
Masahiro Konno for the Aerogel groupDC Meeting, Apr/14/04 1 Status of Aerogel Reconstruction –Track association implemented in CGL. –Raw data (ADC, TDC)
CDMS II Shielding To Installation To Construction From Design.
The HyCal Calorimeter from PrimEx A. Gasparian NC A&T State University Greensboro, NC.
Jayakar Thangaraj Fermilab Accelerator Advisory Committee November 7-9, 2011 PROTOPLASMA: Proton-driven wakefield experiment at Fermilab.
Detector status and commissioning: LUCID
Page Headline Beam Commissioning Adam Bartnik.
Network Media Types COMPUTER NETWORKS 4TH Edition Chapter3
FMS Update Refurbishment for Run15
PREX II Vacuum Box, Shielding and Septum Design Status
Sorting Technologies for CCA Treated Wood
LHCb Velo: commissioning, performance and High flux tests.
C100 Activation Status and Projections JLab Ops Staytreat 2016
Current Status of the T2K Experiment
Stephen Trentalange STAR Upgrade Workshop June 11, 2012
ScECAL+AHCAL+TCMT Combined Beam FNAL
HCAL – SiPM upgrade requirements
during Fall GMp run (high current)
Beam Tests of Ionization Chambers for the NuMI Neutrino Beam Monitoring System MINOS.
FMS Readiness for Run 11 Stephen Trentalange.
FMS Repair Work: Summary
LHCb HCAL: performance and calibration
Tagger Microscope Detector & Electronics Status
Yuxi Pan University of California, Los Angeles
FMS Repair Work: Summary
Status of Readout Boards
Muon Collider Magnet Technologies/Challenges
MEG II実験 液体キセノン検出器の建設状況
Possible parasitic measurement during Fall GMp run
Fibre Optic Transmission
Presentation transcript:

Status of FMS Refurbishment Tasks to be done by BNL: Stephen Trentalange/Mriganka Mondal/Igor Alekseev/Dmitry Svirida/YuXi Pan Testing of PMTs/Bases: 685 working channels - completed 100% Wrapping of working FMS small cells(360) - completed 100% Recovery of cables/magnetic shields(684) - completed 100% Overestimated recovery effort: est completed 1 person week Wrapping of working FMS large cells(104) -2 person-weeks Gluing/Wrapping of broken small cells(90) -2 person-weeks Mounting Fixtures for Large Cells(684) -14 person-weeks Tasks to be done by PSU Steve Hepplemann/Christopher Dilks/Tyler Boone/Dan Marshall/Yaokun Situ Machining of Fermilab Bases(684) -3 person-weeks Construction of plastic caps 684/20/day -7 person-weeks Soldering/gluing/cable-mounting bases 684/10/day -14 person-weeks Total Manpower: 41 person-weeks Tasks on time (~25% completed/25% time)/Budget revised lower($32400 -> $23100)

Canceled Completed

FMS Work Area Annealing lead glass, cleaning and wrapping of lead glass in 0.001”mylar Recovery of expansion rings, signal and HV cables, inner and outer magnetic shields

Radiation Damage to Lead Glass LED pulse amplitude Run 12 Run 13 Day Day Damage inversely proportional to distance from beamline Radiation hardened lead glass positioned closest to beamline Problem much less for large cells Estimated lifetime of detector in 500 GeV beam ~1 month

Radiation Damage/Exposure to Sunlight 0 hours 15 hours 40 hours Large Cell Small Cell Relative Absorption Relative Absorption 300 500 700 900 Wavelength (nm) 300 500 700 900 Wavelength (nm)