Comparison of Fundamental and Dual Harmonic RF Buckets

Slides:



Advertisements
Similar presentations
Nominal and no CSR (R 56-1 = 55 mm, R 56-2 = 59 mm, R 56-3 = 0) L1 phase = 21 deg, V 3.9 = 55 MV CSR OFF BC3 OFF Elegant Tracking  z1 = mm (post.
Advertisements

Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Measurements of adiabatic dual rf capture in the SIS 18 O. Chorniy.
ISIS Accelerator Division
© red ©
Longitudinal motion: The basic synchrotron equations. What is Transition ? RF systems. Motion of low & high energy particles. Acceleration. What are Adiabatic.
Juhao Wu Feedback & Oct. 12 – 13, 2004 Juhao Wu Stanford Linear Accelerator Center LCLS Longitudinal Feedback with CSR as Diagnostic.
1 X-band Single Cell and T18_SLAC_2 Test Results at NLCTA Faya Wang Chris Adolphsen Jul
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
PSB magnetic cycle 160 MeV to 2 GeV with 2.5E13 protons per ring A. Blas 2 GeV magnetic cycle 29/04/ Requirements 1.Present performance: 1E13p from.
Space Charge meeting – CERN – 09/10/2014
Electrical Power Distribution in America % Coal 20.4% Nuclear 20.3% Natural Gas 6% Hydro Electric 3.4% Other
Laslett self-field tune spread calculation with momentum dependence (Application to the PSB at 160 MeV) M. Martini.
22/03/1999A.Blas1 Hollow bunches A. Blas, S. Hancock, S. Koscielniak, M. Lindroos, F. Pedersen, H. Schonauer  Why: to improve space charge related problems.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
S. De Santis “Measurement of the Beam Longitudinal Profile in a Storage Ring by Non-Linear Laser Mixing” - BIW 2004 May, 5th Measurement of the Beam Longitudinal.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
Target material and thickness considerations Alain Blondel, with thanks to Dean Adams and Dan Kaplan Priority for rebuild is to have a target mechanism.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Stephen Brooks NuFact’06, UC-Irvine, August 2006  Lower-Frequency RF Phase Rotation Techniques for Both Muon Signs.
Experience from the Spallation Neutron Source Commissioning Dong-o Jeon Accelerator Physics Group Oak Ridge National Laboratory May 9, 2007.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
Challenges of Dual Harmonic RF Systems ISIS Synchrotron Group John Thomason.
Part III Commissioning. Proof of Principle FFAG (POP) study The world first proton FFAG –Commissioned in March –From 50 keV to 500 keV in 1ms. –Proof.
The ISIS Dual Harmonic Upgrade The Council for the Central Laboratory of the Research Councils Andy Seville Joint Accelerator WorkshopMarch 28th, 2006.
Acceleration- Change in Velocity occurs when an object _____________________ occurs when an object ______________ in speed. occurs when an object __________.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
= 5 = 2 = 4 = 3 How could I make 13 from these shapes? How could I make 19 from these shapes? STARTER.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Chapter 10 Rüdiger Schmidt (CERN) – Darmstadt TU , version E 2.4 Acceleration and longitudinal phase space.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
Barrier RF Stacking Weiren Chou and Dave Wildman Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim, Germany,
GHz High Gradient Testing of a T18 TW StructureUsing a Fast Response Protection and Power Recirculating System GHz High Gradient Testing.
Crank arm = orange plate with cavity crank axis = black x cam 7 = blue plate inside cavity in crank arm cavity generator = closed red curve on blue plate.
Crank arm = orange plate with cavity crank axis = x at center of black circle cavity 6 = hole in crank arm cam 7 = blue plate inside cavity in crank arm.
BEAM DYNAMICS IN A HIGH FREQUENCY RFQ Alessandra M Lombardi S. Myers : head of office for medical applications at CERN The “750MHz” team (layout and beam.
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
SOUND
RF manipulations in SIS 18 and SIS 100 O. Chorniy.
Accumulation Experiments with Stochastic Cooling in the ESR
Challenges of Dual Harmonic RF Systems
The ISIS Dual Harmonic Upgrade
Icosahedrons 3D Color Wheel.
Impact of the current debuncher limitations (…can we get rid of longitudinal painting?)
Guitar D string vibration is creating a longitudinal wave in fundamental (shades of gray) and first harmonic (shades of red) frequencies. The fundamental.
Water Cooling issue (Klystron Cooling)
PSB rf manipulations PSB cavities
Zero Black Machined
New AD Production Beam in the PSB
Lower-Frequency RF Phase Rotation Techniques for Both Muon Signs
Warm-Up.
Volume 20, Issue 2, Pages (January 2010)
Harmonic Cancellation Connecting Loads Through Phase Shifting Transformers Dave Loucks, Ph.D., PE, CEM.
What Color is it?.
©
C c Cc is for cat. © ©
©
VELA TDC: Bunch Length and Longitudinal Phasespace Measurements Update
Click The Triangle! Sam Alderson 8th grade
CHESS energy, 9x6 positrons and electrons, initial measurement
v = f fn = nf1  = 5558 m 343 = 5558(f) f = Hz 325th harmonic
Translate 5 squares left and 4 squares up.
Left: Alternations in cardiac output (black) in one typical patient, every 60 s for three cycles, are followed by oscillations in end-tidal CO2 (blue)
PSB magnetic cycle 900 ms MeV to 2 GeV
Bhawin Dhital Thanks to :
Presentation transcript:

Comparison of Fundamental and Dual Harmonic RF Buckets V0 Volts (KV) δV0 Θ (deg) @ time = 0.3 ms ~ peak trapping loss Bucket Phase length: 218 - 289 deg, Acceptance: 1.04 - 1.24 eVs Time (ms)

Operational theta Oct & Nov 07

1&2RF Operational Gapvolts Oct & Nov 07 2RF - ~9kV peak (on 2 cavities) >200uA for last day or so of last run!

Longitudinal Profile at 0ms green 200 µA Red 210 µA Blue dot 230 µA Black 175 µA

Longitudinal Profile at 0.25ms green 200 µA Red 210 µA Blue dot 230 µA Black 175 µA

Longitudinal Profile at 0.5ms green 200 µA Red 210 µA Blue dot 230 µA Black 175 µA

Operational delta October & Nov 07

October 2RF Machine Physics

Tweaked delta during 50Hz operations delta changed by changing (slowly) antiphasing -> phasing rise time

Achievable delta cf Theoretical

Analysis of pulse shapes