WSAC Decision Making Framework

Slides:



Advertisements
Similar presentations
Role of National Parliaments
Advertisements

Regional Water Planning Senate Bill 1 Introduction and Status as of August 01, 1999.
THE EXPANDING ROLE of RECYCLED WATER The Need, Benefits and Cost Effectiveness Make Recycled Water an Increasingly Valued Resource Harry Ehrlich, SDA Principal.
Possible Pathways for advancing the implementation of decision 13/CP.7 on “Good Practices” in Policies and Measures Presentation by the UNFCCC Secretariat.
© 2014 HDR, Inc., all rights reserved. Catawba-Wateree Water Management Group Water Supply Planning.
Your Water – Your Future Protecting and Preserving Ground Water via the Highlands RMP Ground Water Summit 2008 The Ground Water Protection Committee Presented.
ACT CANADA 2014: Using Business Cases To Get Great Projects Financed and Delivered December 1, 2014| Michael Sutherland.
State aid evaluation Rodrigo PEDUZZI
International Business Environments & Operations
1 Measuring Performance of Resource Management Responses Rich Juricich (DWR) David Groves (RAND)
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
IWRM as a Tool for Adaptation to Climate Change
Overview of the Colorado River Basin Water Supply and Demand Study Urban Water Institute 19 th Annual Water Policy Conference August 22-24, 2012 San Diego.
1 Improving Analytical Capabilities of the California Water Plan Rich Juricich, California Dept. of Water Resources.
1 Emergency Financial Response: Drought Rates May 15, 2014.
Summary of submissions on the Adaptation Fund Workshop on the Adaptation Fund Edmonton May 3-5, 2006.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
IRP Approach to Water Supply Alternatives for Duck River Watershed: Presentation to XII TN Water Resources Symposium William W. Wade Energy and Water.
San Diego County Water Issues 2010 Update Maritime Business and Technology Summit November 16, 2010 Seawater Desalination for San Diego.
© Copyright Awwa Research Foundation 2008 AwwaRF Underground Water Storage Research NARUC Winter Meetings Committee on Water Washington, DC February 19,
National Cleanup Workshop Managing Large Capital Projects Ken Picha Deputy Assistant Secretary for Tank Waste and Nuclear Material.
Irrigation Simon Harris and Claire Mulcock. Defining irrigation No categories No segments Clusters of attributes – supply and demand.
Long-Term Spent Fuel Management in Canada International Conference on Management of Spent Fuel from Nuclear Power Reactors Vienna, Austria May 31, 2010.
Texas Innovation Water 2010 Seawater Desalination What is the benefit to the State from implementing the Brownsville Seawater Demonstration Project?
Achievements Work Package 2: Capacity building activities.
Project selection for sustainable energy projects Determining the most important factors.
Potable Reuse: A New Water Resource for the Central Coast Water Breakout Session – 2015 Central Coast Sustainability Summit James Hawkins, Heal the Ocean.
California Water Plan Update Advisory Committee Meeting January 20, 2005.
California Water Plan Old and New Steve Macaulay, Executive Director.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Integrated Water Resource Plan Water Planning and Stewardship Committee June 9, 2008.
PROPOSED BRUNSWICK COUNTY INTERBASIN TRANSFER PETITION REQUEST NOVEMBER 14, 2013.
Strategies for Colorado River Water Management Jaci Gould Deputy Regional Director Lower Colorado Region.
Future directions for recycling OzWater 2014 Paul Smith.
Climate Change Threat Drought 1. Potential Impacts from Drought How might our community be impacted by drought? 2.
Climate Change Threat Reduced Snowpack 1. Potential Impacts Related to Reduced Snowpack How might our community be impacted by reduced snowpack? 2.
U.S. DEPARTMENT OF ENERGY Joint IEPR Workshop on Climate Adaptation and Resiliency for the Energy Sector Energy Sector Climate Resilience CRAIG ZAMUDA,
The Future of Sustainable Water Initiatives in North Carolina PENC Engineering Leadership Conference Tuesday, December 2, 2013 Donald L. Safrit, P.E.,
Summary of the key messages from the 2016 Annual Funding Statement May 2016.
Kenya’s INDC: Actions in the Energy Sector
What is OneWater? “One Water is an integrated planning and implementation approach to managing finite water resources for long-term resiliency and reliability,
Social value in commissioning
Annex III to BS/SC/PDF/A(2003)1
Truckee Meadows Reclaimed Water Planning
Chromium 6 Regulation Corrective Action Plan October 6, 2015
Monitoring and Evaluation Systems for NARS organizations in Papua New Guinea Day 4. Session 12. Risk Management.
What’s Next for Potable Reuse in California
Elaine Wyllie Executive Director of Joint Commissioning
Water Resources Plan 2040 Update
Allocation of Ogallala Groundwater Supplies
Policy Principles for the Allocation of Recycled Water
Business Environment Dr. Aravind Banakar –
Business Environment
Business Environment
Business Environment
Business Environment
Sustainable management of E-waste
WMO Global Multi-Hazard Alert System
Institutional Framework, Resources and Management
Statistics Governance and Quality Assurance: the Experience of FAO
Regional Collaboration on Water Supply Issues
San Benito County Water District Groundwater Sustainability Agency
The EU strategy on adaptation to climate change
Greater Kaweah GSA Board Meeting
Canada’s Strategy for a Safe and Nutritious Food Supply
Enhanced transparency framework and examples of flexibilities
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
California Water Commission
Chino Basin Water Bank Development
Why Potable Reuse in Florida?
Presentation transcript:

WSAC Decision Making Framework 2.2 Update on Decision Making Framework WSAC Decision Making Framework Joint City Council and Water Commission Meeting April 10, 2018

WSAC made recommendations on what supply options to explore, how to make a decision about which option or portfolio of options to pursue, and set a timeline for when to make the decision

What: Simultaneously explore two different approaches for supply augmentation to determine their technical feasibility, and to develop comparable information about costs, yields, time to implementation, energy use, and environmental impacts

The Two Strategies: Strategy 1 – Groundwater Storage Element 1 – In lieu recharge of local aquifers through water transfers and exchanges Element 2 – Active recharge through aquifer storage and recovery Strategy 2 – Other Local Sources Requiring Advanced Purification Technology Element 3 – Advanced treated recycled water or desalinated water

How: Use the information developed in the feasibility analysis work, as well as WSAC’s Guiding Principles and Key Decision-Making Metrics to conduct a quantitative and qualitative comparative analysis of all the options

How: The goals of the WSAC’s decision-making framework are to: Provide transparent, comparable information about all the options; Create a level playing field for a robust decision-making process; and Produce a decision that has the community support needed to enable implementation to proceed.

When: Identify a preferred project or portfolio of projects to recommend to the City Council in late 2020 This timeline means that decision-making on a supplemental supply project or projects is about 2 years away

Elements of WSAC’s Decision-Making Framework: Key Decision-Making Metrics Guiding Principles Preference Statements Project Performance Metrics

Key Decision-Making Metrics: Quantitative information for the three most important decision- making criteria. WSAC’s Key Decision-Making Metrics include: Cost Yield Timeliness

Key Metrics: Cost Choose to pursue groundwater storage strategies (Strategy 1) as long as the Annual Cost per million gallons of Average Year Yield (ACAYY) is not more than 130% of the ACAYY for Strategy 2 options and the groundwater strategies meet other threshold metrics.

Key Metrics Yield Timeliness Preferred project(s) must produce the required yield of 1.2 billion gallons of water for the worst year shortage. Timeliness The preferred project(s) must be implemented to achieve water supply sufficiency within 10 years (i.e., 2025)

Guiding Principles: Qualitative and value based statements of goals, preferences, or requirements that are to be considered in decision-making along with quantitative information.

WSAC’s Guiding Principles Public Health Consult with experts in public health, endocrinology and water chemistry on local water quality data related to preferred supply option(s). Public Acceptance Consider yield, cost, timeliness, technical feasibility, energy use, and environmental impacts of the various supply alternatives.

WSAC’s Guiding Principles Regional Collaboration Promote regional collaboration to improve regional water reliability. Plan Goal The selected preferred supply option(s) should meet the plan goal of meeting a 1.2 billion gallon shortage during worst year hydrology. Incremental Implementation Plan for incremental implementation to allow the City to avoid investing resources before they are needed and justified based on performance and other metrics.

WSAC’s Preferences and Values Prefer groundwater storage strategies. Move away from these strategies only in the event that all reasonable steps to demonstrate technical feasibility of these strategies indicate that they cannot meet the plan goal or are exceeding key thresholds. Prefer advanced treated recycled water over desalination. Consider how preferred supply project(s) will contribute to system robustness, resiliency, redundancy and adaptive flexibility.

Project Performance Metrics: Objective measures used in determining whether various plan elements are technically feasible.

Example Project Performance Metric for ASR: Average injection capacity for a well must be at least 250 gpm. Injection capacity less than 250 gpm results in needing to increase the number wells required to meet the Key Decision Making Metric for Yield and could result in an increased program costs that would negatively affect the Key Decision Metric for Cost.

Strategy 1 Element 1 – In Lieu Strategy 1 Element 2 – ASR Strategy 1 Combined In Lieu and ASR Strategy 2 Element 3 – Purified Recycled Water Strategy 2 Element 3 – Desalination Threshold Metrics (quantitative indicators) Technical Feasibility Y/N Cost (ACAYY) Annual $/mg of yield Yield Billion gallons Timeliness Meets/Does Not Meet Guiding Principles (qualitative, consumer report type indicators) Public Health Public Acceptance Regional Collaboration Plan Goal Incremental Implementation Additional Values System Robustness System Resilience System Redundancy Adaptive Flexibility

Qualitative results could be indicated with Consumer Report type symbols Poor Good

What’s Next? Continuing to implement the work plan to produce the information needed for decision-making; A Water Commission working group is assisting staff with further development of the comparative analysis framework;

The full Water Commission will be reviewing the working group’s recommendations in the months to come; and Ultimately, the Water Commission will be making recommendations to the Council on the details of the decision-making approach for Council review and action.

QUESTIONS?