Opinions after the 24/25 February 2016 Plenary

Slides:



Advertisements
Similar presentations
ESS VIP PROGRAMME An overview ESSNet workshopWG LUXEMBOURG 22/11/2012.
Advertisements

DIME and ITDG governance structure and mandate
The European Statistical System Vision Infrastructure Programme Daniel Defays, Director Directorate B, Eurostat Eurostat Workshop on the Modernisation.
Background to the Generic Statistical Information Model (GSIM) Briefing Pack December
ESSnet(s) Big Data I + II Item 8 of the agenda Joint DIME-ITDG Plenary Luxembourg, 24 Feb 2015.
Sponsorship on Standardisation Background and overview Daniel Defays Forwardlooking Feedback Workshop, The Hague, 30/31 May 2013.
Eurostat Opportunities for transformation of official statistics from an ESS perspective Walter J. Radermacher Director-General of Eurostat Budapest, 20.
ESS Vision 2020 Strategic Risk Management Risk Mitigation Involvement of the DIME-ITDG DIME-ITDG Steering Group – item 07 Luxembourg,
Eurostat ESS Security and Secure exchange of information Expert Group (E4SWG) Report of the activity of the Task Force in 2015 Pascal Jacques ESTAT B0.
ESDEN - modernisation of data exchange in the ESS
Item 5: Vision 2020 Implementation paper – version 1.1 DIME/ITDG Steering Group – item 05 Meeting of 18 November 2015 BECH B2/404.
Item 5 of the Agenda of the DIME/ITDG SG 24 February 2015 ESS EA TF : Progress report Enterprise Architecture Reference Framework (ESS EA RF)
1 Item 2.1.b of the agenda IT Governance in the ESS and related issues Renewal of mandates STNE Adam WROŃSKI Eurostat, Unit B5.
Enterprise Architecture Reference Framework Generalities
Eurostat Report on SDMX Reference Infrastructure User Group 1 st meeting in Luxembourg Sept 2012 Item 5.2 of the agenda November 2012IT Director's.
Agenda item 5 ESS Vision 2020: other activities DIGICOM and SIMSTAT DIME-ITDG joint plenary Luxembourg,
Eurostat Procedure for the revision of Mandate of Transmission Coordinators (TCOs) Item 15 DIME – ITDG SG meeting 18/11/2015 Jan Planovsky & Hubertus Cloodt.
Eurostat Standardisation DIME-ITDG 2015 Item 6 DIME-ITDG February
Eurostat Sharing data validation services Item 5.1 of the agenda.
GAMSO in context Denis GROFILS & Jean-Marc MUSEUX, Eurostat
Achievements in 2016 Data Integration Linked Open Metadata
The ESS vision, ESSnets and SDMX
ESS Vision 2020: information on the VIG, overview of current projects and process for the selection of new projects Roberto Barcellan, ESTAT B1 ESS RDG.
ESS Vision 2020 Recent developments Addressing the skill gaps
Implementing the ESS Vision 2020
ESS Vision 2020 Implementation
Annual Statistical Programme 2016
Working Group Methodology 7 April 2016
ITDG 2012 Summary conclusions
Methodology and Corporate Architecture
ESS Vision 2020 Validation: Implementation of deliverables
SISAI STATISTICAL INFORMATION SYSTEMS ARCHITECTURE AND INTEGRATION
Towards an ESS architecture ITDG Item 3.4
ESS Vision 2020 Recent developments
22 February, ITDG/DIME Item 2 – Progress and deployment
ESS Vision 2020 Recent developments
ESS Vision 2020 Resource Directors Group – June 2015
The ESS.VIP Programme: an update
The ESS VIP programme: a response to the challenges facing the ESS
ESS Vision 2020 Recent developments
ESS Vision 2020: ESS.VIP Validation
Reporting on QUALITY issues
ESS Security and Secure exchange of information Expert Group (E4SEG) DIME/ITDG SG ESS IT Security Framework Pascal Jacques ESTAT B2 Local Security Officer.
9. Quality and Experimental data
ESS Standardisation State of play
Item 3 of the draft agenda ESS.VIP ADMIN: progress report
CORA ESSNet COmmon Reference Architecture starting ...
Draft Methodology for impact analysis of ESS.VIP Projects
ESSnet Linked Open Statistics
Item 7 - Roadmap and mandate for the Task Force on UOE Education Expenditure Data Eurostat Education and Training Statistics Working Group - Luxembourg,
The ESS reference metadata standards
Commission Activities Eurostat : Latest developments
ESS Standardisation DIME / ITDG steering group – Item for information
ESS Vision 2020 Recent developments
ESS Resource Directors Group
Resource Directors Group Introduction
Policy Group on Statistical Cooperation October 2015, Herceg-Novi
Steering Committee June 8th, 2016
The new ESS Metadata and Quality Reporting Handbook
DRAFT CONCLUSIONS Item 5 of the Agenda
DIME&ITDG SG meeting 28/06/2016 ESS Enterprise Architecture:
Implementing the “Vision” within the ESS
Item 2.2 of the agenda IT Working Group meeting 2016
Implementation of the ESS Vision 2020 State of play
RDG Task Force Cooperation models – Follow up May ESSC
ESS Enterprise Architecture
Implementing the “Vision” within ESS
RDG TF Cooperation models – Action Plan Progress report
Flash Conclusions 2019 Standards Working Group – Day 1
Presentation transcript:

Opinions after the 24/25 February 2016 Plenary DIME/ITDG Opinions after the 24/25 February 2016 Plenary

Item 1 Validation DIME/ITDG endorsed the proposed roadmap and supported the creation of the TF Validation under the WG Methodology and a possible ESSnet. 5 countries (EE,DE,NL,IT,UK) volunteered to join a DIME/ITDG high level group to develop the deployment actions, a roadmap and the governance structure; DIME/ITDG members are invited to signal their interest to participate by 26 February 2016. In line with the Wiesbaden agreement and the SDMX roadmap, high priority will be put on improving VTL in view of testing a new version starting in May 2016. Noting that Validation is the first project in the framework of the ESS Vision 2020 to come to an end, an action plan with indication of priorities for deployment would be presented to the ESSC in May 2016.

Item 2a ESDEN DIME/ITDG expressed appreciation for the close link between the IT project and the business projects of the Vision. Phase one of the project implementation was found as a good example of collaboration between the MSs and ESTAT Eurostat took note of the need to further work on automatizing the full SIMSTAT flow A call will be launched for participation to the network of national contact points

Item 2b SERV DIME/ITDG expressed support to move into phase II of the project subject to Clearly focusing on the deployment (in parallel to development work), use of services in the catalogue Clarification of the ultimate ambitions (priorities, budget, scope) The DIME/ITDG considered crucial a clear user orientation of the work and a top-down approach based on prioritising the ESS Vision 2020 projects and coverage of GSBPM insofar as possible. These elements shall be included in the revised version of the paper to be discussed at the next ESSC in May 2016

Item 3 Risk Management DIME/ITDG took note of the distribution of the different mitigation actions foreseen with regard to the risks identified at the level of the ESS Vision 2020 portfolio, in particular with reference to the roles of the WG Methodology, WG IT, WG Standards and the EG on Standardisation.

Item 4 ESSnet 2017 DIME/ITDG was informed that a description of the governance clarifying the role of the various actors (incl. DIME/ITDG and VIG, VIN) would be provided by the VIG; Members considered that their role is of particular importance with regard to possible ESSnets and CoEs not under the umbrella of the ESS Vision 2020 With regard to the proposed ESSnets the DIME/ITDG took note of the proposals that are in line with the ESS Vision 2020. It was announced that further ESSnets would likely be proposed under QUAL and in the context of a Validation implementation project

Item 5 DIGICOM and SIMSTAT The DIME/ITDG took note of the Business case for DIGICOM as approved by the ESSC in November 2015, and expressed interest in the following areas of the project: linked open data, release of experimental statistics, improvement of access to microdata for research purposes and hackathons.

Item 6 Big Data The DIME/ITDG welcomed the work done in Slovenia in the area of Big data and in particular the concrete case of job vacancies. The DIME/ITDG took note of the different activities being carried out at ESS and International level

Item 8 Enterprise Architecture The DIME & ITDG supported the ESS EA RF for ensuring project alignment with the Vision and encouraged Eurostat to carry on its testing/implementation along the proposed roadmap. This may include actions going beyond ESS actors, e.g. in the area of Big Data. Encouraged for the next phase to link with GAMSO and underlined the importance of focusing on the business projects/products. The EA RF should continue to evolve with the support of the ESS EA board, for which the DIME/ITDG members would nominate participants by 11 March 2016.

Item 9 Quality DIME/ITDG welcomed the progress in the area following the ESSC Workshop on Quality DIME/ITDG took note that further information on the possible ESSNets on Quality related topics would be provided once the work on QUAL has gained shape DIME/ITDG endorsed the proposed revised mandate of the Quality WG

Item 10 SDMX DIME/ITDG acknowledged the success of SDMX and encouraged to expand data sharing arrangements, with more Data Structure Definitions for global use, a higher attention to metadata standardisation initiatives (SIMS) and the enhancement of a user-friendly IT infrastructure supporting SDMX. An action list with measurable objectives and a timeline will complement the Roadmap 2020 Eurostat will present to the next DIME/ITDG SG a Eurostat Roadmap for enhancing the implementation of SDMX in the ESS.

Item 11 Standardization The DIME/ITDG expressed appreciation for the concrete work carried out by the recently established Expert Group on Standardization The proposed work programme was approved

12 IT Security Framework DIME/ITDG supported the list of potential solutions for implementing the IT Security framework and welcomed the work done by the ESS IT Security Expert Group. MSs were invited to express their interest to join the group. Regarding the Assurance Mechanism in the DIME/ITDG no clear consensus emerged; further work will be needed; the scope need to be clarified in the next version of the doc to be provided to the VIG The proposed roadmap was considered a good basis towards the next discussion that will take place at VIG in March 2016

13 EMOS DIME/ITDG took note of the programme, the related governance and labelling system

Item 14 TCOs The DIME/ITDG took note of the results of the survey Some doubts were expressed on the possibility to extend the mandate of the TCOs to act as the national contact point for data transmission of European statistics DIME/ITDG suggested that the follow-up actions would be ensured by the ESS TF in charge of the implementation of the regulation 223

Item 16 Cross-countries Comparability DIME/ITDG welcomed the presentation of this quality dimension that should be investigated further. Possibly with a dedicated stream of research presenting countries experience.