Yesterday morning Held 1647 for a while – SPS kicker problem

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

Sat/Sun 26/27 th March Sat 18h20: Stable beams. Fill #1653. Sun 10h02: Stable beams continued. vdM scans. Length calibrations. 16h59: Beam dump. Delivered.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
BLM update procedure: - Updated the RT software - Updated the BLETC firmware (ver _A) - Changed the firware version in the MASTER tables and generated.
Improving Collimator Setup Efficiency LHC Beam Operation Committee, G. Valentino, R.W. Assmann, R. Bruce, F. Burkart, M. Cauchi, D. Deboy, S.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Ion Commissioning: Thursday & Friday
Wednesday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 8.9 External crossing angles:
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Saturday 24 March 2012.
Wednesday 21 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Saturday 30th June - Sunday: Rocky !
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Machine availability reaching well over 80%
Tuesday TOTEM and transverse loss map (1) OK
Summary of Week 11: 14 – 21 March
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
LHC Morning Meeting - G. Arduini
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary of Week 13 G. Arduini, B. Holzer
LHC commissioning Week 38
Lost at 12:05 to power converter (RTQX2.R1) problem
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Wed :40 Lost S78 - QPS controller.
LHC Status Sun Morning 20-Mai
Week 35 – Technical Stop and Restart
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Planning at 5 o’clock meeting Friday
Friday morning 10:30 Optics measurements and corrections.
Tuesday 9th November 10:02 Fill beams dumped
Yesterday’s morning’s controls issues
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Collimation margins and *
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Tuesday 17/5 10: TeV - colliding. Start roman pot alignment ...
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Wednesday 13th 9:30 Stable Beams… with 1 pilot and 2 nominals
Improving Collimator Setup Efficiency
Programme for Friday 9 July
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
MD Planning Fri – Sat (1. – 2.7.)
Thursday 22 September 2011.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Summary for LPC (March 7th, Ralph Assmann)
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
LHC Morning Meeting - G. Arduini
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Thursday
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Saturday 26th March 9:15 Problem with RB78 temporarily solved. It's running on one Thyristor bridge only and without the active filter LHCb polarity change.
Tuesday
Presentation transcript:

Yesterday morning Held 1647 for a while – SPS kicker problem EOF scraping We have no tails (RA) 10:45 Beams dumped 25/03/2011 LHC 8:30 meeting

25/03/2011 LHC 8:30 meeting

Thursday continued 11:30 access in P1 and P5 for QPS After the dump we had to let the QPS team accessing in IP1 and IP2 to fix some crates which probably suffered from SEU induced by the high luminosity 15:00 beam in for 1.38 TeV 2 nominals up ramp for collimator set-up 16:46 beam dumped at top pf ramp energy limit interlock on a TCLA. The functions were changed, could not restart - problem on the LBDS: two Rogoski coils were giving an error and the IPOC was bad. 18:00 Access Nicolas Magnin confirmed that they have changed a NI board 25/03/2011 LHC 8:30 meeting

1.8 TeV continued 22:50 All IPs optimized Separated ALICE by 130 um in H plane. 25/03/2011 LHC 8:30 meeting

Summary collimation setup (R. Bruce, D. Wollmann, G. Valentino, F. Burkart, S. Redaelli, R. Assmann): Centered all TCT collimators on 1.38 TeV reference orbit. Found up to 2.1mm offsets for zero crossing angle. - Set to agreed 1.38 TeV setting of 14 sigma - Entered interlock threshold values - Setup time: ~1h10. Profited from new parallel movement of both jaws in semi-automatic setup method. - Loss maps done for both beams, H and V. All fine. Cleaning OK. Very small losses in TCT's. - Preparation of operational settings and sequence for collision beam process. - OK for stable beams at 1.38 TeV with 80b from collimation. 25/03/2011 LHC 8:30 meeting

Hum.. Async dump Dry test of TCT functions for collision. The 1.38 TeV sequence had to be modified to updated the TCT thresholds at the beginning of the collision functions (discrete trim of the end-of-ramp actual). 2:50 pilots in – unclean injection of 4*nominal BPMS test (JU) Conclusion: as the BPMS are redundant, crate A and crate B, and the functionality has been tested operation with 80 bunches and its filling pattern can continue. However, this BPMS should be checked tomorrow and the cause of the different reading understood. Lose handshakes Lumi optimization with the DIP signals has the BRAN are not giving any data 25/03/2011 LHC 8:30 meeting

Thanks Laurette & Delphine Stable beams Thanks Laurette & Delphine 25/03/2011 LHC 8:30 meeting

Note: no 50 ns nor 25 ns required over the weekend Incoming Fri AM between fills ADT/AGC 2 h Fri PM/night 1.38 TeV stable beams Sat between fills Energy gaps interlock test 1 h Sat PM 1.38 TeV (plus extra ramp for quench test) Sat night Sunday AM Back to 3.5 TeV, test ramp Sun AM/PM Transfer lines tests 3 h Aperture measurement TI2/8 3h Intensity increase with 75 ns Sun PM/night Physics 296 bunches Mon 06:00 Dump beams for TS Note: no 50 ns nor 25 ns required over the weekend 24/03/2011 LHC 8:30 meeting

Noted – Per Hagen Will the “soon to come” fill 1664 be celebrated? with or without crossing angle… 25/03/2011 LHC 8:30 meeting

Result of BPMS test: Took BPMSA. B4L6 Result of BPMS test: Took BPMSA.B4L6.B1 vertical plane which was given the wrong number of bunches (71 instead of 80). Reading position -0.6 mm with an off-set of -0.7 mm (middle of Limits min and max, reference, is 0.15 mm). When changing the limits from 1.0 to 0.5 mm both beams were dumped, BPMS for B1 and BLM losses on TCDS triggering B2. Conclusion: as the BPMS are redundant, crate A and crate B, and the functionality has been tested operation with 80 bunches and its filling pattern can continue. However, this BPMS should be checked tomorrow and the cause of the different reading understood. JU 25/03/2011 LHC 8:30 meeting