Enhanced Proxy Demand Resource: ESDER 3 PDR-LSR

Slides:



Advertisements
Similar presentations
PG&Es 2009 Participating Load Pilot. 2 Overview Regulatory Context Pilot Characteristics Lessons Next Steps.
Advertisements

NAESB Measurement and Verification Model Business Practice Retail Electric Demand Response 5/29/09 update.
SOUTHERN CALIFORNIA EDISON SM R , Phase 4 (Direct Participation) Financial Settlements By G. Muir Davis January 20, 2011.
03/11/2013 MARKETS COMMITTEE Aleks Mitreski MARKET DEVELOPMENT (413) Overview of Market Rule revisions.
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
NARUC-FERC Demand Response Collaborative Meeting NARUC Fall Meeting Anaheim, CA T. Graham Edwards President & CEO November 11, 2007.
Enhancing Interruptible Rates Through MISO Demand Response: WIEG Annual Meeting June 19, 2008 Presented by: Kavita Maini, Principal KM Energy Consulting,
Susan Covino Senior Consultant, Emerging Markets March 31, 2015
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Ludington Pumped Storage Plant and Wind Power Operational Considerations David Lapinski Consumers Energy Company June 16, 2009.
© 2013 McNees Wallace & Nurick LLC October 17, 2013 Robert A. Weishaar, Jr. ON SITE ENERGY – INTERPLAY WITH PJM DEMAND RESPONSE PROGRAMS Harrisburg, PA.
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
NGEIR Technical Conference Presentation May 16, 2006.
Demand Response in Midwest ISO Markets February 17, 2008.
FERC Assessment of Demand Response & Advanced Metering 2006 APPA Business & Financial Conference September 18, 2006 – Session 11 (PMA) Presented by: Larry.
NAESB MEASUREMENT AND VERIFICATION MODEL BUSINESS PRACTICE RETAIL ELECTRIC DEMAND RESPONSE NARUC update 9/14/09.
Electric vehicle integration into transmission system
Ontario Electricity Supply Forum PEO Mississauga Chapter - September 6, 2007 Rhonda Wright-Hilbig, P.Eng Market Analysis - IESO.
Bulk Power Transmission System
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Reliability Demand Response Product February 25, 2011
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
Renewables and System Services Ann Scully.
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
 Sharon Jacobs Harvard Law School. 1) Order 719 2) RICE Rules 3) Bigger-picture regulatory questions.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM Regulatory Policy SCE Discussion on the Relationship Between NQC and EFC.
Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM Regulatory Affairs Demand Response and Local RA Criteria Discussion
Energy Storage and Distributed Energy Storage (ESDER) Initiative California Independent System Operator CAISO – CPUC Energy Storage Workshop May 3, 2016.
Multi-Use Application Use Case #3: Optimized Pricing and Resource Allocation (OPRA) Project. May 3, 2016.
JOINT WORKSHOP ON MULTIPLE-USE APPLICATIONS. AMS’S 50 MW FLEET FOR SO. CAL EDISON MULTIPLE USE CASE #5: BEHIND- THE-METER DISTRIBUTED ENERGY RESOURCES.
SM SOUTHERN CALIFORNIA EDISON® RETI 2.0 Workshop 03/16/2016 IOU Panel.
The Role of Energy Storage in Supporting the Energy Transition 23 June 2016 Energy Infrastructure Forum Copenhagen, Denmark Thierry Le Boucher EASE Vice-President.
Background / Introduction
Renewable Energy Challenges: System Stability
Overview of the NYISO Demand Response Programs
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
FERC Standard Market Design Working Papers
Asia-Pacific Energy Regulatory Forum
DWG Meeting March 7, 2017 (Update to a Meeting held July 26, 2016)
ERS Procurement Methodology
Real-Time Co-optimization of Energy & Ancillary Services
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy
Evolving Economic Dispatch in SPP
The Future of Demand Response in New England
T-D Interface Working Group November 2, 2017 Energy Storage and Distributed Energy Resources Phase 3 (“ESDER 3”) UPDATE Jill Powers.
Shifting the timing of energy demand: A stochastic modelling approach
2500 R Midtown Sacramento Municipal Utility District
Working Group Meeting #2 Measurement, Metering and Settlement:
Pay for Performance Regulation
RE Grid Integration Study with India
Load Shift Working Group
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
Forecasting and Operations CAISO Case
DECISION
Photovoltaic Systems Engineering Session 18 Solar+Storage Systems
Solar Energy Commercialization
Energy Storage System Drivers and Use Cases for Energy Storage Systems
The Future Grid and Energy Storage
California Transportation Electrification Activities
Energy Storage Roadmap & Flexibility Roadmap Information Session
UM 1856 PGE’s Energy Storage Proposal – Commission Workshop #1
The Seller’s Webinar will begin promptly at 1:03
Presentation transcript:

Enhanced Proxy Demand Resource: ESDER 3 PDR-LSR Eric Kim Infrastructure and Regulatory Policy Specialist

CAISO PDR-LSR Design and Load Shift Definition CAISO is designing PDR-LSR as a resource that can absorb, store, and use energy productively at a different time. Design will prevent incentivizing wasteful and unproductive consumption of energy. Key requirement – energy storage device must be submetered Ability to directly measure energy charged and discharged

Key Features PDR-LSR defined for energy consumed at one time and released at another time Requires direct metering of BTM energy storage Resource pays full retail rate for all charging energy Two resource IDs: For load curtailment Maintains RA capacity eligibility Non-exporting rule applies For load consumption Ineligible for RA capacity and ancillary services Ability to bid a negative cost for energy services

Bidding and Energy services Both PDR-LSR bidding options must be uniform 15-minute or 5-minute dispatchable Will be eligible for bid cost recovery PDR- 𝐿𝑆𝑅 𝑐𝑢𝑟𝑡 can bid at or above $0 PDR- 𝐿𝑆𝑅 𝑐𝑜𝑛𝑠 can bid from -$150 to < $0 Energy Services Energy Flexible Ramping Product Imbalance Reserve Product (DAM enhancements initiative) Ancillary Services (only for curtailment)

PDR-LSR Performance Evaluation Methodology Will measure and net out “typical use” to define incremental value of load shift provided The performance methodology was referenced as MGO-Shift and MEC in revised straw proposal but will now be renamed to: LSR-curtailment 𝐿𝑆𝑅 𝑐𝑢𝑟𝑡 = 𝐺 𝑡 − 𝐺 𝐿𝑀 LSR-consumption 𝐿𝑆𝑅 𝑐𝑜𝑛𝑠 = 𝐺 𝑡 − 𝐺 𝐿𝑀

PDR-LSR “typical use” calculations Typical Use Curtailment ( 𝐺 𝐿𝑀𝑐𝑢𝑟𝑡 ) : 10-in-10 CLB, using 10 non-event hours including both consumption and curtailment but only accept a value that is at or above 0. 𝐺 𝐿𝑀 = 𝑀𝑎𝑥 𝐺 𝐿𝑀𝑐𝑢𝑟𝑡 + 𝐺 𝐿𝑀𝑐𝑜𝑛𝑠 , 0 Typical Use Consumption ( 𝐺 𝐿𝑀𝑐𝑜𝑛𝑠 ) : 10-in-10 CLB, using 10 non-event hours including both consumption and curtailment but only accept a value that is at or below 0. 𝐺 𝐿𝑀 = 𝑀𝑖𝑛 𝐺 𝐿𝑀𝑐𝑢𝑟𝑡 + 𝐺 𝐿𝑀𝑐𝑜𝑛𝑠 , 0

Key Features – Considerations PDR-LSR defined for energy consumed at one time and released at another time Storage of heat or cooling not contemplated as load shift. Requires direct metering of BTM energy storage How do we measure Method for metering of load consuming device directly or indirectly Performance methodology for load shift consumption of a load consuming device Resource pays full retail rate for all charging energy Should resource be charged retail rate with provision of wholesale consumption services?

Key Features – Considerations (Cont.) Two resource IDs: For load curtailment Maintains RA capacity eligibility Non-exporting rule applies Should exporting be allowed? For load consumption Ineligible for RA capacity and ancillary services Ability to bid a negative cost for energy services Should just load consumption be allowed? If so, how to prevent incentivizing wasteful and unproductive consumption? Ancillary services (except for regulation) is allowed for curtailment. Should regulation be a potential service?